ADDITIVE MANUFACTURING (3D PRINTING) QUALITY ASSURANCE CHECKLIST 2026 Created by ChecklistGuro (https://checklistguro.com) --- PRE-PRINT MATERIAL VERIFICATION --- [ ] Material Receipt Date [ ] Material Batch/Lot Number [ ] Material Type (PLA, ABS, PETG, TPU, Nylon/PA, Resin (SLA/DLP), Metal Powder) [ ] Moisture Content Percentage (%) [ ] Pre-Print Quality Checks Passed (Visual Inspection for Contamination, Expiration Date Verification, Dryer/Oven Desiccation Completed, Seal Integrity Check) [ ] Material Safety Data Sheet (MSDS) / Certificate of Analysis [ ] Quality Inspector Approval --- DIGITAL FILE & SLICING INTEGRITY --- [ ] Slicing Software Version (Cura, PrusaSlicer, GrabCAD Print, PreForm, Other) [ ] Validated G-Code / Sliced File [ ] Slicing Parameters Verified (Layer Height Optimization, Infill Pattern & Density, Support Structure Integrity, Print Speed & Acceleration, Retraction Settings) [ ] Estimated Print Duration (Hours) [ ] Print Orientation Notes [ ] Engineer/Technician Approval --- MACHINE CALIBRATION & SETUP --- [ ] Calibration Date [ ] Nozzle/Extruder Temperature (°C) [ ] Build Plate Leveling Status (Level, Unlevel - Requires Adjustment) [ ] Pre-Print Sensor Check (Level Sensor, Thermistor, Endstop/Limit Switch, Filament Runout Sensor) [ ] Calibration Certificate/Log Upload [ ] Technician Verification --- BUILD PROCESS MONITORING --- [ ] Print Start Timestamp [ ] Expected Build Duration [ ] Print Environment Temperature Status (Stable, Fluctuating, Out of Tolerance) [ ] Layer Height Verification (mm) [ ] Observed Anomalies During Build (Layer Shifting, Stringing/Oozing, Warping/Delamination, Under-extrusion, None/Normal) [ ] Detailed Deviation Notes [ ] Time-lapse Camera Snapshot/Logs [ ] Technician Monitoring Verification --- POST-PROCESSING & FINISHING STANDARDS --- [ ] Applied Post-Processing Techniques (Support Removal, Chemical Smoothing, UV Curing, Thermal Annealing, Sanding/Polishing, Dyeing/Painting) [ ] Surface Roughness Observation [ ] Post-Processing Duration (Minutes) [ ] Post-Process Inspection Photos [ ] Final Surface Finish Pass/Fail (Pass, Fail, Requires Rework) [ ] Technician Validation --- DIMENSIONAL ACCURACY & TOLERANCE INSPECTION --- [ ] Inspection Date [ ] Measured Critical Dimension (mm) [ ] Allowed Tolerance Deviation (mm) [ ] Compliance Status (Within Tolerance, Out of Tolerance, Marginal/Requires Review) [ ] Inspection Report / CMM Data Export [ ] Discrepancy Notes & Corrective Actions [ ] Quality Inspector Approval --- STRUCTURAL INTEGRITY & MECHANICAL TESTING --- [ ] Tests Performed (Tensile Strength Test, Hardness Test, Impact Resistance Test, Creep Test, Fatigue Testing) [ ] Measured Tensile Strength (MPa) [ ] Structural Integrity Status (Pass, Fail, Conditional Pass) [ ] Defect Observations [ ] Test Report/Certificate Upload [ ] Quality Inspector Approval --- POST-PRINT MATERIAL WASTE & SUSTAINABILITY AUDIT --- [ ] Audit Date [ ] Total Weight of Support Material Removed (kg) [ ] Percentage of Failed Prints (Scrap Rate %) [ ] Waste Disposal Method (Recycled/Re-extruded, Landfill, Chemical Processing, Third-party Repurposing) [ ] Sustainability Improvement Observations [ ] Waste Log/Weight Measurement Photos [ ] Sustainability Auditor Signature --- FINAL PART DOCUMENTATION & TRACEABILITY --- [ ] Date of Completion [ ] Batch/Lot Number [ ] Print Status (Passed, Failed, Rework Required) [ ] Certificate of Conformance (CoC) [ ] Verification Checks Performed (Dimensional Check, Material Analysis, Surface Finish Check, Structural Integrity Check) [ ] Quality Assurance Inspector Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/manufacturing/additive-manufacturing-3d-printing-quality-assurance-checklist-2026 (Click "Install Template" to launch your digital inspection tool immediately)