AIR BARRIER INSTALLATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PROJECT INFORMATION & PREPARATION --- [ ] Project Name [ ] Project Address [ ] Planned Installation Date [ ] Project Square Footage (approximate) [ ] Air Barrier System Type (Fluid-Applied, Membrane, Spray-Applied, Housewrap, Other) [ ] Project Specific Notes & Requirements [ ] Approved Shop Drawings --- SUBSTRATE ASSESSMENT & PREPARATION --- [ ] Describe Substrate Type (e.g., sheathing, concrete, OSB) [ ] Substrate Moisture Content (%) [ ] Substrate Condition (e.g., Clean, Dusty, Contaminated) (Clean, Dusty, Contaminated, Damaged) [ ] Describe any substrate contaminants or damage. [ ] Substrate Preparation Required (check all that apply) (Cleaning, Priming, Repairing, De-nailing, Sanding) [ ] Date of Substrate Preparation [ ] Notes on Substrate Preparation (e.g., primer type, repair method) --- AIR BARRIER MATERIAL INSTALLATION --- [ ] Air Barrier Material Type Verified? (Fluid-Applied Membrane, Self-Adhesive Membrane, Housewrap, Spray-Applied Foam, Other (Specify)) [ ] Material Manufacturer and Product Name [ ] Material Application Thickness (if applicable) [ ] Application Method(s) Used? (Roller, Spray, Brush, Other (Specify)) [ ] Overlap Width (inches) [ ] Notes on Application Conditions (Temperature, Humidity) [ ] Direction of Overlap Established? (Yes, No) [ ] Areas of Difficult Application (if any, explain) --- SEAM & JOINT TREATMENT --- [ ] Air Barrier Seam Treatment Method (Taping, Liquid Seam Filler, Mechanical Fastening, Manufacturer's Recommended Method) [ ] Description of Seam Treatment Applied [ ] Seam Overlap Width (inches) [ ] Seam Treatment Areas Verified (Wall-to-Wall, Wall-to-Floor, Wall-to-Roof, Around Openings) [ ] Seam Filler Compatibility (if applicable) (Compatible, Not Verified, Incompatible - Requires Alternate Method) [ ] Observations/Notes regarding seam treatment --- PENETRATION SEALING --- [ ] Penetration Sealing Method (Caulking, Flashing, Membrane Patching, Spray Foam, Other (Specify in LONG_TEXT)) [ ] Specify 'Other' Sealing Method (if applicable) [ ] Number of Penetrations Sealed [ ] Photographic Evidence of Penetration Sealing [ ] Sealing Material Used (e.g., Caulk Type, Membrane) (Polyurethane Caulk, Silicone Caulk, Butyl Tape, Self-Adhering Membrane, Spray Foam (Specify Type in LONG_TEXT)) [ ] Specify Spray Foam Type (if applicable) [ ] Penetration Types Sealed (Check all that apply) (Windows, Doors, Pipes, Electrical Conduits, HVAC Ductwork, Other (Specify in LONG_TEXT)) [ ] Specify 'Other' Penetration Types (if applicable) [ ] Date of Penetration Sealing Completion --- QUALITY CONTROL & TESTING --- [ ] Visual Inspection: Air Barrier Continuity? (Continuous - No Gaps Observed, Minor Gaps (<1/4") - Documented, Significant Gaps (>1/4") - Requires Repair) [ ] Average Overlap Width (inches) [ ] Air Barrier Seam Adhesion Test Result (if applicable) (Pass, Fail, Not Performed) [ ] Notes on Visual Inspection & Any Corrections Made [ ] Blower Door Test Performed? (Yes, No - Not Required, No - Postponed) [ ] Blower Door Test Result (CFM50) - if performed [ ] Detailed Blower Door Test Results & Analysis - if performed [ ] Date of Quality Control Inspection [ ] Inspector Signature --- DOCUMENTATION & SIGN-OFF --- [ ] Installation Completion Date [ ] Installation Notes/Observations [ ] Air Barrier Material Lot Number (if applicable) [ ] Photos of Completed Installation (minimum 3) [ ] Blower Door Test Performed? (Yes, No) [ ] Blower Door Test Results (if applicable) [ ] Contractor Signature [ ] Contractor Name (Printed) [ ] Inspector Signature [ ] Inspector Name (Printed) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/air-barrier-installation-checklist (Click "Install Template" to launch your digital inspection tool immediately)