ANDON SYSTEM EFFECTIVENESS CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- SYSTEM VISIBILITY & AWARENESS --- [ ] Number of Andon Points/Stations Visible to Operators [ ] Are Andon Lights Clearly Visible from All Workstations? (Yes, No, Partially) [ ] Are Andon System Instructions Easily Accessible and Understandable? (Yes, No, Needs Improvement) [ ] Describe any observed barriers or issues affecting Andon system visibility. [ ] Percentage of Operators Who Can Explain the Purpose of the Andon System [ ] Is the Andon system signage in the local language(s) spoken by the workforce? (Yes, No, N/A) [ ] Document any instances where Andon signals were missed or misinterpreted due to visibility issues. --- ISSUE IDENTIFICATION & REPORTING --- [ ] Are Andon points clearly marked and easily visible? (Yes, No, Partially) [ ] Average time (in minutes) for an operator to recognize and initiate an Andon signal for a common issue. [ ] Describe any barriers or obstacles operators encounter when attempting to activate an Andon signal. [ ] What types of issues are operators comfortable reporting via the Andon system? (Equipment Malfunction, Material Shortage, Quality Concerns, Safety Hazard, Process Deviation, Other (Specify in LONG_TEXT)) [ ] Are operators confident in their ability to report issues using the Andon system? (Yes, No, Unsure) [ ] Percentage of reported issues that are documented and traced back to their origin. --- RESPONSE & RESOLUTION --- [ ] Average Time to Acknowledge Andon Signal (minutes) [ ] Average Time to Resolve Andon Signal (minutes) [ ] Is there a documented escalation path for unresolved Andon issues? (Yes, No, Not Applicable) [ ] Are assigned resolution personnel readily available? (Always, Usually, Sometimes, Rarely, Never) [ ] Describe any bottlenecks observed in the resolution process. [ ] Which departments/roles are typically involved in Andon resolution? (Production, Maintenance, Quality, Engineering, Supervision, Management) [ ] Are resolution steps documented and followed consistently? (Yes, No, Partially) --- COMMUNICATION & ESCALATION --- [ ] Are escalation paths clearly defined and documented? (Yes, No, Partially, Not Applicable) [ ] Average time to acknowledge an Andon signal (minutes) [ ] Average time to escalate an Andon signal (minutes) [ ] Are responsible escalation personnel clearly identified and readily available? (Yes, No, Sometimes, Not Applicable) [ ] Describe any issues or concerns regarding communication during Andon activation. [ ] Which communication methods are used during Andon escalation? (Verbal, Email, Text Message, Andon System Messaging, Other (Specify)) [ ] Last review/update of escalation procedures. --- SYSTEM MAINTENANCE & RELIABILITY --- [ ] Last Preventative Maintenance Date [ ] Next Scheduled Maintenance Date [ ] Number of Andon System Downtime Incidents (Last Month) [ ] Average Time to Restore System After Downtime [ ] Battery Life for Wireless Devices (If Applicable - Average) [ ] System Hardware Condition (Visual Inspection) (Excellent, Good, Fair, Poor) [ ] Describe Any Recent System Repairs or Modifications [ ] Is Backup Power Available for Andon System? (Yes, No, Partial/Limited) --- TRAINING & COMPETENCY --- [ ] How many training sessions on the Andon system were conducted in the last 12 months? [ ] Which departments receive Andon system training? (Production, Maintenance, Quality Control, Engineering, Supervision, Other) [ ] Briefly describe the content covered in the Andon system training (e.g., signal types, escalation procedures, reporting methods). [ ] Which of the following topics are covered in the training? (Signal Identification (Red, Yellow, etc.), Escalation Procedures, Reporting Methods, Troubleshooting Basics, Safety Protocols related to Andon, Data Review & Analysis) [ ] How are employees assessed for competency after training? (Written Exam, Practical Demonstration, Observation, No Formal Assessment, Other) [ ] Date of last refresher training for key personnel (e.g., supervisors, maintenance staff). [ ] Describe any challenges encountered during training and any modifications made to address them. --- DATA ANALYSIS & CONTINUOUS IMPROVEMENT --- [ ] Number of Andon Triggers Analyzed per Month [ ] Which data points are currently tracked related to Andon triggers (select all that apply) (Trigger Time, Resolution Time, Reason Code, Operator ID, Equipment ID, Location, Root Cause Category) [ ] Briefly describe the process for analyzing Andon trigger data (e.g., frequency, responsible personnel) [ ] Average Time to Identify Root Cause after Andon Activation [ ] How are findings from Andon data analysis communicated to relevant stakeholders? (Regular Meetings, Reports, Dashboards, Email Notifications, Other (Specify)) [ ] Describe at least 2 corrective actions implemented as a direct result of Andon data analysis in the last 12 months. [ ] Percentage Reduction in Recurrence of Top 3 Andon Trigger Reasons (after corrective actions) [ ] Date of last Andon data analysis review meeting --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/manufacturing/andon-system-effectiveness-checklist (Click "Install Template" to launch your digital inspection tool immediately)