BID PACKAGE REVIEW CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- BID PACKAGE SCOPE & CLARITY --- [ ] Project Description Summary [ ] Scope of Work - Detailed Review [ ] Estimated Project Duration (Days/Weeks) [ ] Contract Type (e.g., Lump Sum, Cost Plus, Unit Price) (Lump Sum, Cost Plus, Unit Price, Design-Build) [ ] Areas of Scope Included? (Site Preparation, Demolition, Foundation, Framing, MEP (Mechanical, Electrical, Plumbing), Finishes) [ ] Assumed Site Conditions Notes (if any) [ ] Potential Scope Gaps or Ambiguities Identified --- CONTRACT DOCUMENTS REVIEW --- [ ] Review General Conditions (Document Number): [ ] Contract Duration (in days/weeks/months): [ ] Contract Type (e.g., Lump Sum, Cost-Plus, Unit Price): (Lump Sum, Cost-Plus, Unit Price, Design-Build) [ ] Substantial Completion Date: [ ] Upload Signed Contract (if available): [ ] Note any discrepancies or ambiguities in contract language: --- TECHNICAL SPECIFICATIONS --- [ ] Material Quality Standards Description [ ] Specified Concrete Strength (PSI) [ ] Required Testing & Inspections (Soil Testing, Concrete Testing, Welding Inspection, Material Certification, Other (Specify)) [ ] Attach Material Safety Data Sheets (MSDS) [ ] Acceptable Brand/Manufacturer List Compliance (Compliant, Deviation Required (Explain)) [ ] Minimum Paint Thickness (Mils) [ ] Specific Installation Procedures or Details --- DRAWINGS & PLANS --- [ ] Architectural Drawings - Review for Completeness [ ] Structural Drawings - Review for Completeness [ ] Drawing Revision Numbers - Verified Against Latest Set? [ ] Note any discrepancies or conflicts between drawings. [ ] Are all disciplines coordinated? (Architectural, Structural, MEP) (Yes, No, Requires Further Review) [ ] Are all dimensions consistent across disciplines? (Yes, No, Requires Further Review) [ ] Describe any inconsistencies or areas of concern noted in the drawings. --- PERMITTING & REGULATORY COMPLIANCE --- [ ] Identify Required Permits (Building Permit, Electrical Permit, Plumbing Permit, Mechanical Permit, Environmental Permits, Other (Specify)) [ ] Permit Research Notes [ ] Estimated Permit Fees [ ] Estimated Permit Application Submission Date [ ] Estimated Permit Approval Date [ ] Relevant Codes & Regulations (IBC, NEC, IPC, IMC, Local Building Codes, Environmental Regulations) [ ] Supporting Documentation (e.g., Code Books, Regulatory Info) --- COST & SCHEDULE CONSIDERATIONS --- [ ] Estimated Labor Cost [ ] Estimated Material Cost [ ] Estimated Subcontractor Costs [ ] Contingency Allowance (Percentage) [ ] Project Start Date (Estimated) [ ] Project Completion Date (Estimated) [ ] Duration of Bid Package (Days/Weeks) [ ] Potential Schedule Risks & Mitigation Strategies [ ] Payment Terms (Review & Adequacy) (Acceptable, Needs Adjustment, Unacceptable) --- BIDDER QUALIFICATIONS & RESOURCES --- [ ] Years of Experience in Similar Projects [ ] Relevant Certifications (Select all that apply) (OSHA 30, LEED AP, DBIA Certified, Other (Specify in Long Text)) [ ] Brief Project History (Relevant Projects) [ ] Proof of License & Insurance [ ] Number of Employees Dedicated to this Project [ ] Project Manager’s Qualifications (Based on Years of Experience) (Less than 2 years, 2-5 years, 5-10 years, 10+ years) [ ] Description of Equipment Available for Project --- BID FORM & INSTRUCTIONS --- [ ] Bid Package Title Verification [ ] Instructions for Submission Clarity [ ] Bid Due Date Verification [ ] Bid Form Completeness (All Sections Present) (Yes, No) [ ] License/Certification Verification Included? (Yes, No) [ ] Sample Bid Form (for Review) --- INSURANCE & BONDING REQUIREMENTS --- [ ] Workers' Compensation Insurance Limit (per accident) [ ] Employers Liability Insurance Limit (per accident) [ ] General Liability Insurance Limit (per occurrence) [ ] Automobile Liability Insurance Limit (per occurrence) [ ] Bond Type Required (Bid Bond, Performance Bond, Payment Bond, All of the Above) [ ] Bid Bond Amount (Percentage of Bid) [ ] Performance Bond Amount (Percentage of Contract) [ ] Payment Bond Amount (Percentage of Contract) [ ] Special Insurance Requirements/Notes [ ] Insurance Certificate Upload (for reference) --- SUSTAINABILITY & ENVIRONMENTAL CONSIDERATIONS --- [ ] Are LEED or other green building standards required? (Yes, No, Specify (Long Text)) [ ] Which of the following sustainable materials are encouraged/required? (Recycled Content Materials, Locally Sourced Materials, Renewable Resources, Low-VOC Materials, None Specified) [ ] Required percentage of recycled content (if applicable) [ ] Describe any specific waste management plan requirements. [ ] Does the project include requirements for erosion and sediment control? (Yes, No) [ ] Are there specific requirements for protecting existing vegetation or wildlife? [ ] Upload any environmental impact assessment documentation (if applicable). --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/bid-package-review-checklist (Click "Install Template" to launch your digital inspection tool immediately)