BREWERY EQUIPMENT MAINTENANCE CHECKLIST TEMPLATE Created by ChecklistGuro (https://checklistguro.com) --- BOILING KETTLE & RELATED SYSTEMS --- [ ] Kettle Pressure (PSI) [ ] Steam Flow Rate (lbs/hr) [ ] Boil Temperature (°F) [ ] Burner Flame Appearance (Blue, Yellow, Orange, Uneven) [ ] Valve Leakage (None, Minor, Moderate, Severe) [ ] Last Inspection Date (Burner) [ ] Notes on Kettle Performance --- MASH TUN & LAUTER TUN --- [ ] Mash Tun Temperature (°F) [ ] Lauter Tun Sparge Water Temperature (°F) [ ] Lauter Tun False Bottom Condition (Clean, Minor Debris, Significant Debris - Requires Cleaning, Damaged) [ ] Observations & Notes [ ] Last False Bottom Cleaning Date [ ] Lauter Tun Drainage Time (minutes) [ ] Mash Tun Heating Element Condition (Good, Visible Wear, Malfunctioning, Replaced) --- FERMENTATION VESSELS --- [ ] Tank Pressure (PSI) [ ] Temperature (Fahrenheit) [ ] Last CIP Date [ ] Observation Time [ ] Notes on Fermentation Progress/Observations [ ] Temperature Control Functioning? (Yes, No, N/A) [ ] Photo of Tank Interior (if applicable) --- FILTRATION & CLARIFICATION EQUIPMENT --- [ ] Filter Pressure (PSI) [ ] Backwash Flow Rate (GPM) [ ] Last Filter Element Change Date [ ] Description of any unusual observations during operation [ ] Filter Element Condition (Excellent, Good, Fair, Poor) [ ] Photos of Filter Condition (Optional) [ ] Centrifuge Speed (RPM) --- PACKAGING LINE (BOTTLING/CANNING) --- [ ] Bottling Speed (bottles/min) [ ] Last Belt Inspection Date [ ] Fill Volume Deviation (ml) [ ] Bottle/Can Quality (Visual) (Excellent, Good, Fair, Poor) [ ] Issues Observed (Label Misalignment, Fill Level Issues, Bottle/Can Damage, Capping Problems, Conveyor Issues) [ ] Last Line Cleaning Time [ ] Number of Rejected Bottles/Cans --- CIP (CLEAN-IN-PLACE) SYSTEM --- [ ] Last CIP Cycle Date [ ] CIP Cycle Start Time [ ] Caustic Concentration (%) [ ] Acid Concentration (%) [ ] CIP Chemical Type (Caustic, Acid, Sanitizer) [ ] Notes on CIP Cycle (e.g., unusual observations) [ ] Nozzle Performance (Excellent, Good, Fair, Poor) [ ] Photo of Nozzle Configuration --- GLYCOL CHILLER SYSTEM --- [ ] Chiller Inlet Temperature (°F) [ ] Chiller Outlet Temperature (°F) [ ] Condenser Pressure (PSI) [ ] Suction Pressure (PSI) [ ] Refrigerant Level (lbs/oz) [ ] Last Refrigerant Top-Up Date [ ] Notes/Observations [ ] Chiller Performance (Excellent, Good, Fair, Poor) --- COMPRESSED AIR SYSTEM --- [ ] Compressor PSI Reading [ ] Tank Pressure Reading [ ] Air Filter Differential Pressure (in H2O) [ ] Air Compressor Oil Level (Full, Adequate, Low, Critical) [ ] Last Filter Replacement Date [ ] Last Drain Valve Cycle Time [ ] Any Unusual Noises or Observations? --- ELECTRICAL SYSTEMS --- [ ] Panel Voltage (V) [ ] Motor Insulation Resistance (Meg Ohms) [ ] Last Electrical Safety Inspection Date [ ] Panel Condition (Visual Inspection) (Excellent, Good, Fair, Poor) [ ] Notes on Wiring Condition [ ] Motor Amperage (Current) [ ] Time of Motor Start/Stop (if applicable) --- PUMPS & VALVES --- [ ] Pump 1 Flow Rate (GPM) [ ] Pump 1 Motor RPM [ ] Valve 1 Pressure (PSI) [ ] Valve 1 Operation (Open/Closed/Partially Open) (Open, Closed, Partially Open) [ ] Valve 1 Leakage Observations [ ] Last Lubrication Date (Pump 2) [ ] Valve 3 Stem Backlash (inches) [ ] Pump 4 Noise Level (Normal/Audible/Excessive) (Normal, Audible, Excessive) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/maintenance-management/brewery-equipment-maintenance-checklist-template (Click "Install Template" to launch your digital inspection tool immediately)