CONCRETE STRENGTH TESTING CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-TESTING PREPARATION --- [ ] Date of Preparation Check [ ] Time of Preparation Check [ ] Ambient Temperature (°C) [ ] Humidity (%) [ ] Testing Standard Used (ASTM C39, ASTM C469, EN 12390-3, Other (Specify)) [ ] Project Name [ ] Concrete Mix Design No. [ ] Equipment Ready? (Yes, No) --- SAMPLE EXTRACTION & HANDLING --- [ ] Pour Identification Number/Tag [ ] Location of Sample Extraction (e.g., Slab #, Column C-3) [ ] Number of Cylinders Extracted [ ] Sample Extraction Method (e.g., Scoop, Trowel) (Scoop, Trowel, Other (Specify)) [ ] Notes on Sample Extraction Conditions (e.g., moisture, temperature, slump) [ ] Date of Sample Extraction [ ] Time of Sample Extraction [ ] Name/Initials of Person Extracting Samples --- CYLINDER PREPARATION & STORAGE --- [ ] Number of Cylinders Cast [ ] Mold Type Used (e.g., Standard, Slim) (Standard, Slim, Other (Specify)) [ ] Specifics regarding other mold type (if applicable) [ ] Concrete Slump (inches) [ ] Compaction Factor [ ] Date of Casting [ ] Notes on Cylinder Preparation (e.g., visual defects, air pockets) [ ] Curing Conditions (Water Curing, Controlled Temperature, Ambient Conditions) [ ] Curing Temperature (°C) --- TESTING EQUIPMENT CALIBRATION & VERIFICATION --- [ ] Last Calibration Date for Compression Machine [ ] Compression Machine Capacity (kN/lbs) [ ] Machine Load Increment (kN/lbs) [ ] Calibration Weight Serial Number(s) [ ] Calibration Standard Used (Certified Weight Set, Pressure Standard, Other (Specify in LONG_TEXT)) [ ] If 'Other' selected above, specify calibration standard: [ ] Load Cell Verification Passed? (Yes, No) [ ] If Load Cell Verification Failed, describe the issue and corrective action taken: [ ] Verification Load Applied (kN/lbs) --- TESTING PROCEDURE EXECUTION --- [ ] Cylinder Load at Failure (lbs or kN) [ ] Maximum Load Achieved (lbs or kN) [ ] Cylinder Diameter (inches or mm) [ ] Cylinder Height (inches or mm) [ ] Strain at Failure (microstrain) [ ] Loading Rate (0.25 in/min, 0.5 in/min, 1.0 in/min, Other - Specify, Specified by Standard) [ ] Observations during Testing (e.g., cracking patterns, failure mode) [ ] Direction of Test (if applicable) (Parallel to Reinforcement, Perpendicular to Reinforcement, Not Applicable) --- DATA RECORDING & ANALYSIS --- [ ] Cylinder Diameter (inches) [ ] Cylinder Height (inches) [ ] Maximum Test Load (lbs) [ ] Breaking Load (lbs) [ ] Calculated Compressive Strength (psi) [ ] Average Compressive Strength (psi) - for multiple tests [ ] Test Method Used (e.g., ASTM C496, ASTM C39) (ASTM C39, ASTM C496, Other (Specify in Long Text)) [ ] Notes / Observations (e.g., failure pattern, unusual conditions) --- DOCUMENTATION & REPORTING --- [ ] Test Number/ID [ ] Date of Test [ ] Time of Test [ ] Project Name [ ] Concrete Mix Design [ ] Observations during testing (e.g., cracking, appearance) [ ] 28-Day Strength (psi/MPa) [ ] Compliance with Specification? (Yes, No, N/A) [ ] Attach Test Certificates/Photos [ ] Tester Signature --- QUALITY CONTROL & NON-CONFORMANCE --- [ ] Number of Discarded Cylinders (if any) [ ] Reason for Cylinder Discard (if applicable) [ ] Observed Anomalies (e.g., cracking, air pockets) (None, Cracking, Air Pockets, Surface Defects, Other (specify in Long Text)) [ ] Description of Observed Anomalies (if selected above) [ ] Test Result within Specification Limits? (Yes, No, N/A) [ ] Explanation of Non-Conformance (if result outside limits) [ ] Corrective Actions Taken (Re-test Sample, Adjust Mix Design, Investigate Curing Practices, Other (specify in Long Text)) [ ] Details of Corrective Actions (if selected above) [ ] Date of Corrective Action [ ] Signature of Person Verifying Non-Conformance --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/concrete-strength-testing-checklist (Click "Install Template" to launch your digital inspection tool immediately)