CONVENTION CENTER AV EQUIPMENT CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-EVENT INSPECTION & PREPARATION --- [ ] Last Full System Test Date [ ] Total Number of Functional Microphones Verified [ ] Number of Projector Lamps Remaining (Estimate) [ ] Overall System Status (Operational, Minor Issues, Significant Issues, Non-Operational) [ ] Notes on Pre-Existing Issues or Concerns [ ] Location of Emergency Power Backup System [ ] Upload of Previous Inspection Report (if available) [ ] Scheduled Time for Next Preventative Maintenance --- PROJECTION & DISPLAY SYSTEMS --- [ ] Projector Lamp Hours (Main Projector) [ ] Projector Lamp Hours (Backup Projector) [ ] Projector Status (Main) (Operational, Needs Repair, Needs Lamp Replacement, Out of Service) [ ] Screen Condition (Excellent, Good, Minor Damage, Significant Damage, Needs Repair) [ ] Notes on Projector/Screen Condition [ ] Aspect Ratio Functionality (Functional, Needs Adjustment, Not Functional) [ ] Last Calibration Date [ ] Connectivity Issues? (HDMI, VGA, DVI, None) --- AUDIO SYSTEMS --- [ ] Microphone Quantity (Wireless) [ ] Microphone Quantity (Wired) [ ] Mixer Model (Yamaha LS9, Allen & Heath GL2400, Soundcraft Sigma, Other (Specify)) [ ] Mixer Notes (Functionality, issues, etc.) [ ] Speaker System Configuration (Main PA System, Front Fills, Side Reinforcement, Bose System, None) [ ] Number of Speaker Cabinets Checked [ ] Speaker Issues Found (Select all that apply) (Crackling, Distortion, Low Volume, Humming, Physical Damage, None) [ ] Last Amplifier Serviced [ ] Last Microphone Battery Change --- LIGHTING SYSTEMS --- [ ] Number of Working LED Pars [ ] Number of Functional Spotlights [ ] Dimmer System Functionality (Fully Functional, Minor Issues, Significant Issues, Not Functional) [ ] Lighting Console Type (GrandMA2, Chamsys MagicQ, Avolites, Other) [ ] Notes on Lighting Console Configuration or Issues [ ] Number of Replacement Gobos Available [ ] Condition of Lighting Cables (Good, Fair - some wear, Poor - needs replacement) [ ] Last Lighting System Maintenance Date --- CONTROL SYSTEMS & CONNECTIVITY --- [ ] Network Switch Port Count Available [ ] Control System Software Version (v1.0, v2.1, v3.5, Unknown) [ ] Connectivity Ports Available (Check All That Apply) (HDMI, DisplayPort, VGA, Ethernet, S-Video, Audio (3.5mm)) [ ] Network IP Address (Main Control System) [ ] Last Firmware Update Date (Control System) [ ] Notes/Observations on Control System Functionality --- POWER & ELECTRICAL --- [ ] PDU Total Capacity (Amps) [ ] PDU Available Capacity (Amps) [ ] Number of Functioning Outlets Verified [ ] Surge Protection Status (Operational, Needs Replacement, Needs Inspection) [ ] Dedicated Circuit Breaker Verified? (Yes, No, N/A) [ ] Last Electrical Safety Inspection Date [ ] Notes on Power/Electrical Issues [ ] Voltage Reading (Volts) --- STAGING & SUPPORT STRUCTURES --- [ ] Maximum Load Capacity of Stage (lbs) [ ] Number of Rigging Points Available [ ] Stage Surface Condition (Pre-Event) (Excellent, Good, Fair, Poor) [ ] Riser Condition (Pre-Event) (Excellent, Good, Fair, Poor) [ ] Height of Lowest Stage Level (inches) [ ] Notes on Stage/Riser Condition (e.g., damage, repairs needed) [ ] Trussing/Rigging Certification Status (Current & Valid, Expiring Soon (within 6 months), Expired) [ ] Last Rigging Inspection Date --- POST-EVENT INSPECTION & MAINTENANCE --- [ ] Projector Lamp Usage Hours (Total) [ ] Notes on Unusual Sounds/Issues [ ] Screen Condition (After Event) (Excellent, Good, Fair, Poor, Damaged) [ ] Date of Last Microphone Cleaning [ ] Areas Requiring Cleaning (Check all that apply) (Speakers, Microphone Cables, Mixing Console, Projector Lens, All Equipment) [ ] Quantity of Damaged or Missing Cables [ ] Detailed Description of Any Equipment Damage [ ] Overall Equipment Condition (Excellent, Good, Fair, Needs Repair) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/facility-management/convention-center-av-equipment-checklist (Click "Install Template" to launch your digital inspection tool immediately)