DATA CENTER COOLING SYSTEM CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- SYSTEM OVERVIEW & DOCUMENTATION --- [ ] Describe the overall cooling system architecture and design. [ ] Upload the current data center cooling system schematic/diagram. [ ] Date of last cooling system design review. [ ] Briefly summarize the latest significant changes or upgrades to the cooling system. [ ] Cooling System Type (e.g., Chilled Water, Direct Expansion, In-Row) (Chilled Water, Direct Expansion (DX), In-Row, Other - Specify in Long Text) [ ] Cooling System Capacity (kW or Tons) [ ] Document Location (Physical and/or Network) --- ENVIRONMENTAL MONITORING --- [ ] Ambient Temperature (Data Center) [ ] CRAC/CRAH Supply Air Temperature [ ] CRAC/CRAH Return Air Temperature [ ] Humidity (Data Center) [ ] Differential Pressure (Air Filters) [ ] Airflow Direction Verification (Visual Inspection) (Correct, Incorrect - Needs Adjustment, Not Verified) [ ] Notes/Observations on Environmental Readings [ ] Date of Environmental Monitoring --- CHILLERS (IF APPLICABLE) --- [ ] Chiller 1 Water Inlet Temperature (°C) [ ] Chiller 1 Water Outlet Temperature (°C) [ ] Chiller 1 Chilled Water Flow Rate (GPM) [ ] Chiller 1 Energy Consumption (kWh) [ ] Chiller 1 Compressor Status (Normal, Warning, Error) [ ] Last Oil Change Date [ ] Any unusual noises or vibrations observed? [ ] Upload Vibration Analysis Report (if applicable) [ ] Cooling Mode (Cooling, Heating, Standby) --- COOLING TOWERS (IF APPLICABLE) --- [ ] Cooling Tower Water Inlet Temperature (°C) [ ] Cooling Tower Water Outlet Temperature (°C) [ ] Cooling Tower Fan Speed (RPM) [ ] Cooling Tower Water Flow Rate (GPM) [ ] Water Treatment Type (Chemical Treatment, Filtration, Reverse Osmosis, Other) [ ] Last Water Treatment Analysis Date [ ] Observations regarding water quality (clarity, color, etc.) [ ] Fan Motor Condition (Excellent, Good, Fair, Poor) [ ] Attach recent cooling tower performance report (if available) --- COMPUTER ROOM AIR CONDITIONERS (CRAC/CRAH) --- [ ] Supply Air Temperature (°C/°F) [ ] Return Air Temperature (°C/°F) [ ] Delta T (°C/°F) [ ] Chilled Water Pressure (PSI/Bar) [ ] Chilled Water Flow Rate (GPM/LPM) [ ] Air Filter Condition (Excellent, Good, Fair, Poor) [ ] Fan Motor Operation (Normal, Audible Noise, Vibration, Malfunctioning) [ ] Any unusual noises or observations? [ ] Last Filter Change Date --- PUMP SYSTEMS --- [ ] Pump 1 Flow Rate (GPM) [ ] Pump 2 Flow Rate (GPM) [ ] Pump 1 Discharge Pressure (PSI) [ ] Pump 1 Motor Current (Amps) [ ] Pump 1 Vibration Status (Normal, Slightly Elevated, Elevated, Abnormal) [ ] Pump 1 Bearing Noise (None, Minor, Moderate, Significant) [ ] Last Coupling Alignment Date [ ] Notes/Observations regarding pump performance --- AIR DISTRIBUTION --- [ ] CRAC/CRAH Unit Airflow (CFM) - Verify against design specifications [ ] Underfloor Air Pressure (inches of water gauge) - Measure at critical locations [ ] Containment Integrity - Visual Inspection (Hot Aisle/Cold Aisle) (Excellent, Good, Fair, Poor) [ ] Identify any Airflow Obstructions (Cables, Equipment Placement, Debris/Dust, None) [ ] Detailed Observations/Notes on Air Distribution [ ] Floor Tile Condition (for raised floors) (Intact & Properly Installed, Damaged/Missing Tiles, Improperly Installed) [ ] Specific Location of Airflow issues --- POWER SUPPLY TO COOLING SYSTEMS --- [ ] UPS Voltage (V) [ ] UPS Load (kW) [ ] Generator Voltage (V) [ ] Generator Load (kW) [ ] UPS Bypass Status (Normal Operation, Bypass Active, Bypass Failed) [ ] Last UPS Load Test Date [ ] Last Generator Test Date [ ] Notes on Power Supply Conditions --- ALARM SYSTEMS AND TRENDING --- [ ] Current Temperature Threshold Alarm Setting (CRAC/CRAH) [ ] Current Humidity Threshold Alarm Setting [ ] Alarm Acknowledgement Procedure Followed? (Yes, No) [ ] Date of Last Alarm System Test/Calibration [ ] Description of any recent alarm events and corrective actions taken [ ] Which alarm notifications are configured? (Email, SMS, Pager, SNMP Trap) [ ] Alarm system logs reviewed? (Yes, No) --- MAINTENANCE RECORDS & SCHEDULES --- [ ] Last Preventative Maintenance (PM) Date [ ] PM Task Completion Percentage (if ongoing) [ ] Summary of Last PM Performed (including findings & actions) [ ] Upload PM Report/Documentation [ ] Next Scheduled PM Task(s) (Filter Replacement, Belt Inspection/Replacement, Water Treatment Analysis, Condenser Tube Cleaning, Leak Check, Bearing Lubrication, None) [ ] Date of Next Scheduled Maintenance [ ] Notes/Comments on Maintenance Schedule Adherence --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/facility-management/data-center-cooling-system-checklist (Click "Install Template" to launch your digital inspection tool immediately)