DATA CENTER EQUIPMENT MAINTENANCE CHECKLIST TEMPLATE Created by ChecklistGuro (https://checklistguro.com) --- POWER INFRASTRUCTURE --- [ ] UPS Input Voltage (VAC) [ ] UPS Output Voltage (VAC) [ ] Generator Run Time (Hours) [ ] Last Generator Test Date [ ] PDU Capacity Utilization (%) [ ] UPS Status (Online, Battery, Test, Fault) [ ] Notes/Observations --- COOLING SYSTEMS --- [ ] CRAC/CRAH Unit Supply Air Temperature (Deg F) [ ] CRAC/CRAH Unit Return Air Temperature (Deg F) [ ] Chiller Water Inlet Temperature (Deg F) [ ] Chiller Water Outlet Temperature (Deg F) [ ] Cooling Tower Fan Speed (RPM) [ ] Condensate Pan Condition (Clean, Slightly Dirty, Dirty, Clogged) [ ] Notes/Observations (Cooling Systems) [ ] Last Filter Change Date --- SERVER HARDWARE --- [ ] Server Rack Unit (RU) Temperature (°C) [ ] CPU Temperature (°C) [ ] Memory Usage (%) [ ] Disk Space Utilization (%) [ ] RAID Status (Healthy, Degraded, Failed) [ ] Last Firmware Update Date [ ] Notes/Observations [ ] Attach Screenshot (if applicable) --- NETWORK EQUIPMENT --- [ ] Router CPU Utilization (%) [ ] Switch Interface Error Count [ ] Firmware Status (Current/Outdated) (Current, Outdated) [ ] Last Firmware Update Date [ ] Notes on Performance or Issues [ ] Connectivity Issues? (Yes, No) [ ] Port Status (Up/Down) --- STORAGE SYSTEMS --- [ ] Disk Utilization (%) [ ] RAID Status Code [ ] Controller Firmware Version (Version 1.0, Version 1.1, Version 1.2, Version 1.3, Other) [ ] Any Errors or Warnings? [ ] Last Data Scrub Date [ ] IOPS (Input/Output Operations Per Second) --- ENVIRONMENTAL MONITORING --- [ ] Ambient Temperature (Celsius) [ ] Ambient Temperature (Fahrenheit) [ ] Relative Humidity (%) [ ] Differential Pressure (Pa) [ ] Sensor Status (Operational, Warning, Critical, Offline) [ ] Last Calibration Date [ ] Notes/Observations --- FIRE SUPPRESSION --- [ ] Last Inspection Date [ ] Agent Level (e.g., CFM) [ ] Agent Type (FM-200, Inergen, etc.) (FM-200, Inergen, Novec 1230, Argonite, Other) [ ] Inspection Notes & Observations [ ] Nozzle Condition Score (1-5) [ ] System Status (Operational, Needs Maintenance, Out of Service) [ ] Next Scheduled Service Date --- PHYSICAL SECURITY --- [ ] Camera 1 Location [ ] Access Point Lock Cylinder Count [ ] Perimeter Fence Condition (Excellent, Good, Fair, Poor) [ ] Last Perimeter Security Audit Date [ ] Security Breaches Observed (Unauthorized Access, Tampered Equipment, System Log Anomalies, None) [ ] Security Incident Details (if any) --- CABLING & CONNECTIVITY --- [ ] Cable Tray Condition (1-5, 1=Excellent, 5=Poor) [ ] Cable Labeling Accuracy & Completeness [ ] Notes on Cable Routing & Bundling [ ] Cable Condition (General) (Good, Fair, Poor) [ ] Last Cable Inspection Date [ ] Cable Issues Identified (Damage, Loose Connections, Incorrect Labeling, Overheating, None) [ ] Specific Cable Run Issues (if applicable) --- DOCUMENTATION & COMPLIANCE --- [ ] Last Compliance Audit Date [ ] Audit Findings and Recommendations [ ] Compliance Standard (ISO 27001, PCI DSS, SOC 2, Other) [ ] If Other, Specify Standard: [ ] Next Scheduled Audit Frequency (Months) [ ] Relevant Compliance Documentation (e.g., certificates) [ ] Technician Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/maintenance-management/data-center-equipment-maintenance-checklist-template (Click "Install Template" to launch your digital inspection tool immediately)