DATA CENTER INFRASTRUCTURE INSPECTION CHECKLIST TEMPLATE Created by ChecklistGuro (https://checklistguro.com) --- POWER INFRASTRUCTURE --- [ ] UPS Battery Voltage (V) [ ] Generator Run Time (Hours) [ ] PDU Power Consumption (kW) [ ] UPS Status (Online, Standby, Battery, Fault) [ ] Last Generator Test Date [ ] Time of UPS Load Bank Test [ ] Phase Rotation (Correct, Incorrect) [ ] Notes/Observations --- COOLING SYSTEMS --- [ ] Chiller Inlet Temperature (°C) [ ] Chiller Outlet Temperature (°C) [ ] Cooling Tower Water Temperature (°C) [ ] CRAC/CRAH Unit Supply Air Temperature (°C) [ ] CRAC/CRAH Unit Return Air Temperature (°C) [ ] Cooling System Operational Status (Nominal, Degraded, Emergency) [ ] Observations/Notes on Cooling System Performance [ ] Last Cooling System Maintenance Date --- FIRE DETECTION & SUPPRESSION --- [ ] Last Fire Drill Date [ ] Smoke Detector Battery Voltage (V) [ ] Smoke Detector Status (Operational, Malfunctioning, Needs Replacement) [ ] Sprinkler System Inspection (Visual Inspection Complete, Flow Test Performed, Damper Check Performed) [ ] Fire Extinguisher Pressure (PSI) [ ] Fire Extinguisher Inspection Tag Status (Current, Expired, Needs Recharge) [ ] Notes on Fire Detection System --- NETWORK & CONNECTIVITY --- [ ] Switch Port Status (1=Up, 0=Down) [ ] Router Firmware Version [ ] Bandwidth Utilization (%) [ ] Network Cable Condition (Good, Fair, Poor) (Good, Fair, Poor) [ ] Last Network Scan Date [ ] Network Services Active (Select all that apply) (DNS, DHCP, Firewall, VPN) [ ] Notes/Observations (e.g., packet loss, latency) --- PHYSICAL SECURITY --- [ ] Number of Active Security Cameras [ ] Access Control System Status (Operational, Degraded, Non-Operational) [ ] Last Perimeter Fence Inspection Date [ ] Security Breach Attempts (Past Month) (Unauthorized Access, System Intrusion, Physical Tampering, None) [ ] Location of Security System Control Panel [ ] Security Personnel Present (Yes/No) --- ENVIRONMENTAL MONITORING --- [ ] Ambient Temperature (Celsius) [ ] Relative Humidity (%) [ ] Differential Pressure (Pa) [ ] Water Leak Detection Sensor Status (0-1) [ ] Air Quality Sensor Reading (Normal, Warning, Critical) [ ] Last Calibration Date (Temperature Sensor) [ ] Time of Reading [ ] Notes on Environmental Conditions --- RACK & CABINET INTEGRITY --- [ ] Rack Height (U) [ ] Rack Condition (Excellent, Good, Fair, Poor) [ ] Cable Management Issues (Loose Cables, Overcrowding, Improper Routing, Missing Ties) [ ] Number of Blanking Panels Installed [ ] Door Security (Front) (Secure, Unlocked, Damaged) [ ] Door Security (Rear) (Secure, Unlocked, Damaged) [ ] Additional Notes on Rack/Cabinet Integrity --- POWER CABLING & LABELING --- [ ] Cable Tray Condition (Description) [ ] Number of Cable Management Clips Present [ ] Cable Labeling Quality (Excellent, Good, Fair, Poor) [ ] Labeling Standards Met? (Color Coding, Circuit Identification, Equipment Tagging) [ ] Any Damaged or Frayed Cables Noted? [ ] Cable Routing Compliance (Compliant, Minor Deviation, Major Deviation) [ ] Last Cable Inspection Date --- BACKUP & DISASTER RECOVERY --- [ ] Last Backup Date [ ] Scheduled Backup Time [ ] Backup Completion Status (%) [ ] Backup Type (Full, Incremental, Differential) [ ] Backup Verification Results [ ] Backup Logs [ ] Offsite Replication Status (Successful, Failed, N/A) [ ] Disaster Recovery Plan Review Date --- DOCUMENTATION & COMPLIANCE --- [ ] Last Compliance Audit Date [ ] Audit Score (if applicable) [ ] Compliance Standard(s) Met (ISO 27001, PCI DSS, HIPAA, SOC 2, Other) [ ] Summary of Audit Findings (if applicable) [ ] Upload of Audit Report (if applicable) [ ] Review of Emergency Procedures (Reviewed and Updated, Reviewed - No Updates Required, Not Reviewed) [ ] Date of Next Scheduled Compliance Review --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/inspection-management/data-center-infrastructure-inspection-checklist-template (Click "Install Template" to launch your digital inspection tool immediately)