DESIGN REVIEW AND VALIDATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- GENERAL INFORMATION & SCOPE --- [ ] Project Name [ ] Design Revision Number [ ] Date of Design Submission [ ] Total Project Area (sq ft/m2) [ ] Brief Project Description [ ] Design Phase (Schematic Design, Design Development, Construction Documents, Other) [ ] Attached Design Documents (PDFs, CAD files) --- REGULATORY COMPLIANCE & PERMITS --- [ ] Applicable Building Code Version (IBC 2018, IBC 2021, Local Code (Specify Below)) [ ] Specify Local Code (if applicable) [ ] Required Permits (Building Permit, Electrical Permit, Plumbing Permit, Mechanical Permit, Grading Permit, Environmental Permits (e.g., stormwater), Other (Specify)) [ ] Other Permits Required (if applicable) [ ] Permit Application Forms [ ] Permit Application Submission Date [ ] Permit Number(s) [ ] Zoning Compliance (Compliant, Non-Compliant (Requires Variance)) [ ] Variance Details (if applicable) --- STRUCTURAL INTEGRITY & STABILITY --- [ ] Live Load Capacity (psf) [ ] Dead Load Capacity (psf) [ ] Wind Load Calculation Factor [ ] Summary of Structural Calculations [ ] Structural Analysis Reports (e.g., ETABS, SAP2000) [ ] Soil Type Considered in Design? (Clay, Sand, Gravel, Silt, Rock, Other) [ ] Seismic Zone? (A, B, C, D, E, F) [ ] Description of any deviations from standard design practices, and justification. --- GEOTECHNICAL CONSIDERATIONS --- [ ] Summary of Geotechnical Report Findings [ ] Design Soil Bearing Capacity (psf) [ ] Design Soil Unit Weight (pcf) [ ] Foundation Type (as per Geotechnical Report) (Shallow Foundations (e.g., Spread Footings), Deep Foundations (e.g., Piles, Caissons), Mat Foundation, Other (Specify)) [ ] Geotechnical Report (Complete) [ ] Groundwater Table Location (as per Geotechnical Report) (Above Ground, At Ground, Below Ground, Not Encountered) [ ] Notes/Assumptions Made Regarding Geotechnical Data --- ARCHITECTURAL DESIGN & AESTHETICS --- [ ] Overall Design Concept Description [ ] Compliance with Architectural Style Guidelines? (Fully Compliant, Partially Compliant - Requires Modification, Not Compliant - Requires Significant Revision) [ ] Exterior Renderings/Visualizations [ ] Facade Material Palette Consistency Score (1-10) [ ] Description of Interior Layout and Functionality [ ] Adherence to Accessibility Standards (ADA)? (Yes, No, Requires Further Review) [ ] Notes on Material Selection and Justification --- MEP (MECHANICAL, ELECTRICAL, PLUMBING) SYSTEMS --- [ ] HVAC System Capacity (BTU/hr) [ ] Electrical Panel Size (Amps) [ ] Plumbing Material Type (Domestic Water) (Copper, PEX, CPVC, Other) [ ] Description of Emergency Power System [ ] MEP Shop Drawings - HVAC [ ] Energy Efficiency Features (MEP) (High-Efficiency Pumps, Variable Frequency Drives (VFDs), LED Lighting, Smart Controls, Solar Panels) [ ] Coordination Issues Identified & Resolution Plan --- SUSTAINABILITY & ENERGY EFFICIENCY --- [ ] Target U-Value for Building Envelope (W/m²·K) [ ] Estimated EUI (Energy Use Intensity) (kWh/m²/year) [ ] Sustainable Materials Used (e.g., Recycled Content, Locally Sourced) (Recycled Content, Locally Sourced, Rapidly Renewable Resources, Certified Wood (e.g., FSC), Other (Specify in LONG_TEXT)) [ ] Describe any Passive Design Strategies (e.g., Orientation, Shading) [ ] HVAC System Type (Select one) (VRF, Chilled Beams, Packaged Rooftop Units, Other (Specify in LONG_TEXT)) [ ] Energy Modeling Report (if available) [ ] Water Conservation Measures (Select all that apply) (Low-flow fixtures, Rainwater harvesting, Greywater recycling, Drought-tolerant landscaping) [ ] Describe any LEED or other Sustainability Certifications being targeted --- CONSTRUCTABILITY & SEQUENCING --- [ ] Describe any potential constructability challenges anticipated with this design. [ ] Which of the following construction methods are deemed most appropriate for this design? (Select all that apply) (Cast-in-place Concrete, Precast Concrete, Steel Frame, Timber Frame, Modular Construction, Other (Specify in LONG_TEXT)) [ ] Estimated number of construction crews required for peak activity. [ ] Target start date for critical construction activities. [ ] Describe any sequencing dependencies that need to be carefully managed during construction. [ ] What is the anticipated level of complexity regarding material delivery and staging? (Low, Medium, High) [ ] Upload any 3D models or BIM files used for constructability review. --- COST ESTIMATION & VALUE ENGINEERING --- [ ] Estimated Material Cost Deviation (%) [ ] Estimated Labor Cost Deviation (%) [ ] Estimated Total Project Cost Deviation (%) [ ] Value Engineering Ideas Considered (and rationale) [ ] Recommended Value Engineering Change? (Yes, No, Needs Further Investigation) [ ] Supporting Documentation (e.g., revised cost estimates, vendor quotes) [ ] Explanation of any significant cost discrepancies. [ ] Cost Estimate Source? (Internal Estimation, Subcontractor Quote, Vendor Quote, Software Estimate) --- RISK ASSESSMENT & MITIGATION --- [ ] Identify Potential Risks [ ] Risk Severity (1-10) [ ] Risk Probability (1-10) [ ] Describe Proposed Mitigation Strategies [ ] Risk Category (e.g., Design, Geotechnical, Regulatory) (Design, Geotechnical, Regulatory, Material Supply, Labor Availability, Environmental, Other) [ ] Potential Impact Areas (Schedule, Budget, Quality, Safety, Environmental) [ ] Date of Risk Identification [ ] Contingency Plans (if mitigation fails) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/design-review-and-validation-checklist (Click "Install Template" to launch your digital inspection tool immediately)