ELECTRICAL WIRING INSPECTION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- GENERAL REQUIREMENTS & DOCUMENTATION --- [ ] Permit Number [ ] Project Description [ ] Inspection Date [ ] Code Compliance Standard (NEC 2020, NEC 2023, Local Code (Specify)) [ ] Approved Electrical Plans [ ] Square Footage of Building [ ] Type of Occupancy (Residential, Commercial, Industrial, Other (Specify)) [ ] Notes/Comments on Documentation Review --- MAIN SERVICE ENTRANCE --- [ ] Service Voltage (e.g., 120/240V) [ ] Service Capacity (Amps) [ ] Meter Base Condition (Good, Damaged, Corroded, Missing, Other (Specify)) [ ] Service Disconnect Labeling (Amps & Voltage) [ ] Service Entrance Conductor Type (Copper, Aluminum, Other (Specify)) [ ] Grounding Electrode Size (if applicable) [ ] Any observed issues or comments regarding the service entrance? [ ] Bonding Condition (Acceptable, Inadequate, Missing, Other (Specify)) --- PANELBOARDS & OVERCURRENT PROTECTION --- [ ] Panelboard Voltage Rating (V) [ ] Panelboard Location (Indoor/Outdoor) (Indoor, Outdoor) [ ] Number of Circuit Breakers Installed [ ] Panelboard Labeling (Select all that apply) (Voltage, Current Rating, Circuit Identification, Supplier Name, Other) [ ] Circuit Breaker Type (Select One) (Standard Circuit Breaker, GFCI Circuit Breaker, AFCI Circuit Breaker, Combination AFCI/GFCI) [ ] Circuit Breaker Ampacity (A) [ ] Any Visible Damage or Corrosion? [ ] Panelboard is Properly Secured? (Yes, No) --- BRANCH CIRCUITS & WIRING METHODS --- [ ] Conduit Fill Percentage: [ ] Wiring Method Verification (Select all that apply): (NM Cable, MC Cable, EMT Conduit, PVC Conduit, Flexible Conduit, Other (Specify in LONG_TEXT)) [ ] If 'Other' wiring method selected above, please specify: [ ] Number of Branch Circuits Identified: [ ] Wiring Secured Appropriately? (Yes, No, NA) [ ] Photograph of Conduit Installation (if needed) [ ] Wire Gauge (e.g., 12 AWG) Verification - All Circuits: [ ] Proper Wire Type Used? (Yes, No, NA) --- GROUNDING & BONDING --- [ ] Type of Grounding Electrode System? (Rod Ground, Plate Ground, Ground Ring, Concrete Encased Electrode, Water Pipe Ground (if permitted)) [ ] Ground Rod Depth (inches) [ ] Ground Wire Size (AWG) (#6, #4, #2, #1, Other (Specify)) [ ] Description of Bonding Jumpers (size, material, location) [ ] Bonding of Exposed Metallic Piping? (Yes, No, N/A) [ ] Resistance to Ground (Ohms) [ ] Notes on Grounding System --- RECEPTACLES & SWITCHES --- [ ] Receptacle Grounding Status (Properly Grounded, Ungrounded, Incorrect Grounding, Not Accessible) [ ] Receptacle Tamper Resistance (Tamper Resistant, Not Tamper Resistant (Exempt), Not Tamper Resistant (Not Exempt)) [ ] Receptacle Voltage (V) [ ] Switch Functionality (Operates Correctly, Sticking/Difficult to Operate, Does Not Function, Incomplete Wiring) [ ] Switch Wiring Observations [ ] Receptacle Type (Standard, GFCI, AFCI, Weatherproof) [ ] Receptacle/Switch Notes --- LIGHTING FIXTURES --- [ ] Fixture Type (e.g., LED, Fluorescent) [ ] Number of Fixtures Inspected [ ] Fixture Securely Mounted? (Yes, No, NA) [ ] Proper Grounding Connection? (Yes, No, NA) [ ] Notes on Wiring (e.g., cable type, connection quality) [ ] Appropriate Wattage Rating? (Yes, No, NA) [ ] Upload Photo of Fixture Installation (if issues found) --- SPECIAL EQUIPMENT (HVAC, WATER HEATERS, ETC.) --- [ ] Water Heater Disconnect Location (Accessible Location, Inaccessible Location, Not Applicable) [ ] Water Heater Voltage (V) [ ] HVA/C Unit Proper Grounding? (Yes, No, Not Applicable) [ ] Detailed Observations regarding HVAC wiring [ ] Dedicated Circuit for Water Heater? (Yes, No, Not Applicable) [ ] Attach Photo of Equipment Connection [ ] Amperage Rating of Dedicated Circuit (A) [ ] GFCI Protection for Water Heater? (Yes, No, Not Applicable) --- SMOKE DETECTORS & CARBON MONOXIDE DETECTORS --- [ ] Smoke Detector Location - Living Room (Installed and Operational, Installed, Not Operational, Not Installed, N/A - Not Required) [ ] Carbon Monoxide Detector Location - Near Bedrooms (Installed and Operational, Installed, Not Operational, Not Installed, N/A - Not Required) [ ] Smoke Detector Power Source (Hardwired, Battery-Powered, Dual Power (Hardwired & Battery)) [ ] Number of Smoke Detectors Installed [ ] Smoke Detector Interconnection (Interconnected, Not Interconnected) [ ] Notes/Comments on Smoke/CO Detector Installation [ ] CO Detector Tested and Working? (Yes, No, N/A) [ ] Date of Last CO Detector Test (if applicable) --- FINAL SIGN-OFF & REMEDIATION --- [ ] Date of Final Inspection [ ] Time of Final Inspection [ ] Summary of Findings & Required Corrections (Detailed) [ ] Were all previously identified deficiencies corrected? (Yes, No) [ ] Number of Open/Uncorrected Items [ ] Description of any remaining deficiencies (if applicable) [ ] Inspector's Recommendation: (Pass, Conditional Pass (Requires Remediation), Fail (Requires Significant Remediation)) [ ] Inspector's Signature [ ] Inspector's Printed Name --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/electrical-wiring-inspection-checklist (Click "Install Template" to launch your digital inspection tool immediately)