EMERGENCY POWER SYSTEM - CRITICAL LEARNING SPACES CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- SYSTEM OVERVIEW & DOCUMENTATION --- [ ] Emergency Power System System ID [ ] Brief System Description (including capacity, fuel type, etc.) [ ] Date of Last System Design Review [ ] Copy of Latest System Design Documentation [ ] Rated System Power (kVA/kW) [ ] System Configuration (e.g., Standby, Island Mode) (Standby, Island Mode, Other (Specify)) [ ] If 'Other' selected above, please specify configuration. [ ] Date of Last Emergency Power System Performance Test --- BATTERY SYSTEM --- [ ] Battery Voltage (DC) [ ] Battery Specific Gravity (if applicable) [ ] Battery Temperature (°C) [ ] Battery Capacity Remaining (%) [ ] Battery Condition (Excellent, Good, Fair, Poor, Needs Attention) [ ] Last Battery Inspection Date [ ] Notes/Observations on Battery Health [ ] Battery Type (Lead-Acid, Lithium-Ion, NiCd, Other) --- GENERATOR SET (IF APPLICABLE) --- [ ] Generator Run Time (Hours) [ ] Fuel Level (Gallons/Liters) [ ] Oil Pressure (PSI/Bar) [ ] Coolant Temperature (°F/°C) [ ] Generator Exercised within last year? (Yes, No, N/A) [ ] Last Exercise Date [ ] Exercise Performance Notes (Load, Duration, Abnormalities) [ ] Governor Function Test Passed? (Yes, No, N/A) [ ] Upload Generator Maintenance Log (PDF) --- TRANSFER SWITCH --- [ ] Transfer Switch Model Number [ ] Last Transfer Switch Exercise Date [ ] Transfer Switch Exercise Duration (seconds) [ ] Transfer Switch Exercise Result (Normal/Abnormal) (Normal, Abnormal) [ ] Details of any Abnormal Exercise Results (if applicable) [ ] Transfer Switch Contact Condition (Clean/Corroded) (Clean, Corroded) [ ] Contactor Resistance (Ohms) - Phase 1 [ ] Contactor Resistance (Ohms) - Phase 2 [ ] Status of Annunciator Panel (Operational/Faulty) (Operational, Faulty) --- CRITICAL LOADS & CIRCUITS --- [ ] Circuit Breaker Amperage (Critical Load 1) [ ] Critical Load 1 Status (Power On/Off During Test) (Power On, Power Off) [ ] Voltage at Critical Load 1 (During Test) [ ] Critical Load 2 Status (Power On/Off During Test) (Power On, Power Off) [ ] Voltage at Critical Load 2 (During Test) [ ] Critical Equipment Powered (Select All That Apply) (Lighting, HVAC, Network/Data Ports, AV Equipment, Computers/Workstations, Laboratory Equipment) [ ] Notes on Critical Load Performance (e.g., any unusual behavior) --- MONITORING & ALARM SYSTEMS --- [ ] Alarm Panel Functionality (Functional, Needs Repair, Not Present) [ ] Battery Voltage (at panel) [ ] Alarm Notifications Received (Last Test) (Yes, as expected, No, Partially) [ ] Description of Any Alarm Events (recent) [ ] Status of Remote Monitoring (if applicable) (Operational, Disconnected, Error) [ ] Last Alarm System Test Date [ ] Alarm System Test Report (if available) --- TESTING & MAINTENANCE RECORDS --- [ ] Last Generator Load Test Date [ ] Last Battery System Capacity Test Date [ ] Battery System Capacity Test Result (%) [ ] Generator Runtime During Last Load Test (hours) [ ] Summary of Observations During Last Load Test (including any issues) [ ] Load Test Passed? (Yes, No, N/A) [ ] Upload Load Test Report (if applicable) [ ] Date of Last Preventive Maintenance [ ] Details of Maintenance Performed --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/facility-management/emergency-power-system-critical-learning-spaces-checklist (Click "Install Template" to launch your digital inspection tool immediately)