ENERGY DEMAND RESPONSE PROGRAM READINESS CHECKLIST 2026 Created by ChecklistGuro (https://checklistguro.com) --- PROGRAM ENROLLMENT & CONTRACT COMPLIANCE --- [ ] Contract Effective Date [ ] Utility Provider Name (Utility Provider A, Utility Provider B, Other) [ ] Program Type (Price-Responsive, Incentive-Based, Critical Peak Pricing) [ ] Executed Service Agreement [ ] Compliance Requirements Verified (Regulatory Compliance, Insurance Coverage, Load Shedding Penalties Acknowledged, Meter Accuracy Verification) [ ] Compliance Officer Approval --- LOAD PROFILE & BASELINE ESTABLISHMENT --- [ ] Baseline Period Start Date [ ] Baseline Period End Date [ ] Baseline Calculation Methodology (Regression Analysis, Average Historical Load, Weather-Adjusted Baseline, Regulated Utility Standard) [ ] Average Peak Load (kW) [ ] Identified Sheddable Load Types (HVAC Systems, Lighting Systems, Industrial Processing Equipment, Water Heating/Cooling, Compressed Air Systems) [ ] Historical Load Profile Data (CSV/XLSX) [ ] Baseline Deviation Notes & Assumptions --- COMMUNICATION & CONTROL INFRASTRUCTURE --- [ ] Primary Communication Protocol Type (OpenADR, Modbus/TCP, BACnet, MQTT, Proprietary/Other) [ ] Gateway/Controller IP Address or Identifier [ ] Integrated Control Systems (Smart Meters, BMS (Building Management System), PLC (Programmable Logic Controllers), IoT Sensors, Automated Load Controllers) [ ] Last Communication Hardware Audit Date [ ] Network Topology Diagram [ ] Infrastructure Engineer Verification --- OPERATIONAL RESOURCE ASSESSMENT --- [ ] Identified Controllable Assets (HVAC Systems, Battery Energy Storage Systems (BESS), Backup Diesel Generators, Industrial Processing Equipment, Electric Vehicle (EV) Charging Stations, Compressed Air Systems, Lighting Control Systems) [ ] Estimated Maximum Load Reduction Capacity (kW) [ ] Asset Criticality Level (Critical (Cannot be shed), Semi-Critical (Short-term shedding allowed), Non-Critical (Primary candidate for shedding)) [ ] Operational Constraints & Limitations [ ] Asset Maintenance Logs & Technical Datasheets --- EVENT RESPONSE PROTOCOLS & SOPS --- [ ] Primary Response Mode (Automated (Direct Load Control), Manual (Operator Directed), Semi-Automated (Hybrid)) [ ] Critical Assets to Defer/Shutdown (HVAC Systems, Non-Essential Lighting, Pumping Systems, Electric Vehicle Charging Stations, Manufacturing Production Lines) [ ] Emergency Escalation Workflow [ ] Standard Operating Procedure (SOP) Document [ ] Operations Manager Approval --- MONITORING, REPORTING & ANALYTICS --- [ ] Last Data Audit Date [ ] Data Logging Frequency (Real-time, Every 15 Minutes, Hourly, Daily) [ ] Monitored Energy Metrics (kW Demand, kWh Consumption, Power Factor, Voltage Levels, Peak Load Variance) [ ] Discrepancy Notes & Error Logs [ ] Monthly Energy Performance Report [ ] Data Integrity Auditor Verification --- STAFF TRAINING & EMERGENCY PREPAREDNESS --- [ ] Training Modules Completed (Basic DR Protocol Overview, Manual Load Shedding Procedures, Automated System Override Training, Emergency Communication Tree, Post-Event Reporting Workflow) [ ] Last Training Session Date [ ] Next Scheduled Drill Date [ ] Staff Training Attendance Logs [ ] Personnel Competency Level (Beginner, Intermediate, Advanced/Lead Operator) [ ] Safety Officer Verification --- FINANCIAL & INCENTIVE MANAGEMENT --- [ ] Estimated Annual DR Revenue Projection [ ] Maximum Allowable Load Shedding Cost Threshold [ ] Incentive Payment Disbursement Date [ ] Revenue Stream Sources (Direct Utility Rebates, Capacity Payments, Energy Settlement Credits, Tax Incentives/Subsidies) [ ] Contract & Agreement Documentation [ ] Financial Controller Approval --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/energy/energy-demand-response-program-readiness-checklist-2026 (Click "Install Template" to launch your digital inspection tool immediately)