ENERGY METERING COMPLIANCE CHECKLIST TEMPLATE Created by ChecklistGuro (https://checklistguro.com) --- METER ACCURACY & CALIBRATION --- [ ] Meter Serial Number [ ] Last Calibration Date (YYYY-MM-DD) [ ] Next Calibration Due Date [ ] Accuracy Class [ ] Measured Value at Calibration [ ] Tolerance Limit (%) [ ] Calibration Status (Pass, Fail, Pending) [ ] Calibration Notes/Observations --- METER INSTALLATION & CONNECTION --- [ ] Meter Serial Number [ ] Installation Date [ ] Connection Type (Single Phase/Three Phase) (Single Phase, Three Phase) [ ] CT Ratio (If Applicable) [ ] PT Ratio (If Applicable) [ ] Wiring Configuration (Correct/Incorrect) (Correct, Incorrect) [ ] Notes/Observations --- DATA RECORDING & TRANSMISSION --- [ ] Meter Reading Accuracy (%) [ ] Last Data Transmission Date [ ] Last Data Transmission Time [ ] Communication Protocol Used (Modbus, DNP3, IEC 61850, Other) [ ] Description of Data Transmission Method [ ] Data Encryption Method (AES, RSA, None) [ ] Data Transmission Interval (minutes) --- TAMPER DETECTION & SECURITY --- [ ] Physical Security Assessment (Adequate, Needs Improvement, Insufficient) [ ] Tamper Detection System Status (0-100) [ ] Sealing Integrity (Intact, Compromised, Missing) [ ] Last Sealing Inspection Date [ ] Notes on Tamper Evidence Observed [ ] Alarm System Functionality (Functional, Needs Repair, Disabled) --- REGULATORY COMPLIANCE --- [ ] Applicable Regulations (e.g., FERC, NERC, State) (FERC, NERC, State Regulation - [Specify State], Local Ordinance - [Specify Ordinance], Other - [Specify]) [ ] Last Regulatory Audit Date [ ] Audit Score/Rating (if applicable) [ ] Summary of Audit Findings (if applicable) [ ] Compliance Status (Compliant, Non-Compliant, Partial Compliance, Pending Review) [ ] Supporting Documentation (Audit Reports, Certificates) --- DOCUMENTATION & RECORD KEEPING --- [ ] Last Meter Reading Date [ ] Meter Reading Value [ ] Notes on Meter Reading [ ] Attach Meter Reading Photo [ ] Calibration Date [ ] Calibration Details [ ] Calibration Status (Complete, Pending, Not Required) --- METER TESTING AND VALIDATION --- [ ] Last Meter Test Date [ ] Meter Reading at Test Start [ ] Meter Test Load (Amps) [ ] Meter Voltage During Test (Volts) [ ] Meter Indicated Value During Test [ ] Test Result (Pass, Fail, Needs Further Investigation) [ ] Test Comments & Observations [ ] Attach Test Report (Optional) --- COMMUNICATION INFRASTRUCTURE --- [ ] Network Bandwidth (Mbps) [ ] Signal Strength (dBm) [ ] Communication Protocol (Cellular, Wired (Ethernet), Wireless (WiFi), Satellite) [ ] Last Network Performance Test Date [ ] Typical Data Transmission Latency (ms) [ ] Description of Redundancy Measures (if any) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/energy/energy-metering-compliance-checklist-template (Click "Install Template" to launch your digital inspection tool immediately)