EQUIPMENT HEALTH INDEX (EHI) REVIEW CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- OVERALL PERFORMANCE & TRENDING --- [ ] Current EHI Score [ ] Previous EHI Score (for comparison) [ ] Percentage Change in EHI Score [ ] Summary of Key Trends Observed in EHI Data [ ] Overall Assessment of Equipment Health (Based on EHI) (Excellent, Good, Fair, Poor) [ ] Areas of Greatest Concern (Based on EHI) (Mechanical Systems, Electrical Systems, Process Control, Lubrication, Hydraulics) [ ] Date of Last EHI Review [ ] Recommendations for Further Investigation or Action --- VIBRATION ANALYSIS --- [ ] Overall Vibration Severity Score (RMS) [ ] Axial Vibration (mm/s) [ ] Radial Vibration (mm/s) [ ] Tangential Vibration (mm/s) [ ] Phase Analysis (if applicable) (Normal, Phase Shift Detected, Unstable Phase, Not Applicable) [ ] Description of Observed Vibration Patterns [ ] Vibration Spectrum Graph [ ] Impulse Characteristics (if present) (None, Low, Moderate, High) [ ] Date of Last Vibration Analysis --- OIL ANALYSIS --- [ ] Viscosity (cSt @ 40°C) [ ] Total Base Number (TBN) (mg KOH/g) [ ] Acid Number (AN) (mg KOH/g) [ ] Water Content (%) [ ] Wear Metal Concentration - Iron (ppm) [ ] Wear Metal Concentration - Copper (ppm) [ ] Particle Contamination (ISO Code) (ISO 00, ISO 03, ISO 06, ISO 09, ISO 12, ISO 14, ISO 16, ISO 18, ISO 21, ISO 24) [ ] Observations/Comments on Oil Condition [ ] Oil Sample Date [ ] Oil Analysis Report --- THERMOGRAPHY (INFRARED SCANNING) --- [ ] Maximum Hotspot Temperature (Surface °C) [ ] Ambient Temperature (°C) [ ] Emissivity Value Used [ ] Description of Hotspot Anomalies Observed (if any) [ ] Areas Inspected (Select all that apply) (Electrical Panels, Motors & Drives, Pumps, Gearboxes, Process Piping, HVAC Systems, Other (Specify in long text)) [ ] Overall Thermal Image Quality (Excellent, Good, Fair, Poor) [ ] Date of Thermography Scan [ ] Time of Thermography Scan [ ] Attach Thermography Image(s) --- ULTRASONIC TESTING --- [ ] Bearing Outer Race Defect Amplitude (dB) [ ] Bearing Inner Race Defect Amplitude (dB) [ ] Bearing Ball/Roller Defect Amplitude (dB) [ ] Gear Mesh Frequency Amplitude (dB) [ ] Description of Detected Anomalies (if any) [ ] Leak Detection Status (No Leaks Detected, Minor Leak Detected, Significant Leak Detected, Leak Location Unknown) [ ] Ultrasonic Sound Waveforms/Spectrum [ ] Date of Ultrasonic Testing [ ] Time of Ultrasonic Testing --- PROCESS PARAMETER MONITORING --- [ ] Production Rate (Units/Hour) [ ] Operating Pressure (PSI) [ ] Operating Temperature (Degrees Celsius) [ ] Power Consumption (kW) [ ] Cycle Time (Normal Range) (Within Specification, Slightly Outside, Significantly Outside) [ ] Observed Process Anomalies/Deviations [ ] Date of Last Process Parameter Calibration [ ] Process Parameter Stability (Stable, Slightly Fluctuating, Highly Fluctuating) [ ] Actions Taken Regarding Process Parameter Deviations --- DATA INTEGRITY AND RELIABILITY --- [ ] Data Source Accuracy Score (1-10) [ ] Data Source Verification Method (Manual Review, Automated Validation, Calibration Records, Third-Party Audit) [ ] Last Data Source Validation Date [ ] Description of Data Validation Procedures [ ] Data Transmission Method (Direct Connection, Wireless, Networked, Manual Entry) [ ] Data Loss Rate (%) [ ] Notes on data inconsistencies or anomalies detected [ ] Calibration Status of Sensors (Within Calibration Period, Calibration Needed, Calibration Overdue) --- ALARM MANAGEMENT & RESPONSE --- [ ] Number of Unacknowledged Alarms [ ] Alarm Response Protocol Followed? (Yes, No, N/A) [ ] Brief Description of Alarm Response Actions Taken [ ] Date of Last Alarm Response Training [ ] Average Time to Acknowledge an Alarm [ ] Root Cause Analysis Performed for Recurring Alarms? (Yes, No, N/A) [ ] Summary of Findings from Root Cause Analysis (if applicable) [ ] Attach screenshot of recent alarm log (if applicable) --- MAINTENANCE HISTORY REVIEW --- [ ] Number of Preventative Maintenance (PM) Tasks Completed on Time [ ] Summary of Recurring Failure Modes [ ] Date of Last Major Overhaul [ ] Mean Time Between Failures (MTBF) – Current Value [ ] Number of Unexpected Breakdowns in the Past 12 Months [ ] Detailed Description of Most Recent Significant Repair [ ] Root Cause Analysis (RCA) Documentation Available? (Yes, No, Partially Available) [ ] Upload Maintenance Records/Logs (Optional) --- CORRECTIVE ACTION EFFECTIVENESS --- [ ] Pre-Corrective Action EHI Score [ ] Post-Corrective Action EHI Score [ ] Corrective Action Category (Mechanical, Electrical, Process, Lubrication, Software/Control System) [ ] Description of Corrective Action Taken [ ] Root Cause Identified (Initial Assessment) (Wear, Misalignment, Contamination, Design Flaw, Operator Error, Other) [ ] Root Cause Verification Method (Visual Inspection, Vibration Analysis, Oil Analysis, Thermography, Ultrasonic Testing) [ ] Description of Actual Root Cause (If Different) [ ] Was the Corrective Action Effective? (Yes, No, Partially) [ ] Explanation for Effectiveness Rating (If Partially or No) [ ] Date of Follow-Up Review --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/manufacturing/equipment-health-index-ehi-review-checklist (Click "Install Template" to launch your digital inspection tool immediately)