EV CHARGING INFRASTRUCTURE DEPLOYMENT CHECKLIST 2026 Created by ChecklistGuro (https://checklistguro.com) --- SITE ASSESSMENT & FEASIBILITY STUDY --- [ ] Site Name/Location ID [ ] Installation Coordinates [ ] Existing Transformer Capacity (kVA) (Under 50 kVA, 50-150 kVA, 150-500 kVA, Above 500 kVA) [ ] Available Power Source Types (Grid Connection, Solar PV Array, Battery Energy Storage (BESS), Backup Diesel Generator) [ ] Site Obstruction Notes [ ] Site Survey Photo/Blueprint --- PERMITTING & REGULATORY COMPLIANCE --- [ ] Permit Status (Not Started, In Progress, Under Review, Approved, Denied) [ ] Permit Expiration Date [ ] Approved Permit Documentation [ ] Regulatory Compliance Notes [ ] Required Approvals Obtained (Zoning Board Approval, Electrical Safety Permit, Environmental Impact Clearance, Utility Interconnection Agreement, Construction Permit) [ ] Compliance Officer Verification --- GRID CONNECTION & UTILITY COORDINATION --- [ ] Utility Provider Name [ ] Service Connection Request Date [ ] Connection Type (New Service Connection, Load Upgrade/Expansion, Existing Infrastructure Reconfiguration) [ ] Estimated Peak Load Requirement (kW) [ ] Utility Single Line Diagram (SLD) [ ] Required Grid Interventions (Transformer Upgrade, New Meter Installation, Substation Modification, New Dedicated Conduit) [ ] Project Manager Approval --- HARDWARE & EQUIPMENT PROCUREMENT --- [ ] Charger Type (Level 2 AC Charger, DC Fast Charger (DCFC), Ultra-Fast Charger) [ ] Quantity of Units Ordered [ ] Expected Delivery Date [ ] Equipment Specification Sheets [ ] Included Accessories (Mounting Brackets, Cable Management Hooks, RFID Card Readers, Emergency Stop Buttons) [ ] Vendor & Manufacturer Details --- ELECTRICAL INSTALLATION & WIRING --- [ ] Conduit Material Used (EMT (Electrical Metallic Tubing), IMC (Intermediate Metal Conduit), Rigid Metal Conduit (RMC), PVC (Polyvinyl Chloride)) [ ] Circuit Breaker Ampere Rating [ ] Electrical Inspection Date [ ] Wiring Verification Tasks Completed (Grounding & Bonding Verified, Insulation Resistance Test Passed, Phase Continuity Confirmed, Conduit Support/Strapping Secured) [ ] Electrical Circuit Diagram/Blueprint [ ] Certified Electrician Approval --- SOFTWARE & NETWORK INTEGRATION --- [ ] Network Connection Type (Wi-Fi, Cellular (4G/5G), Ethernet, PLC (Power Line Communication)) [ ] OCPP Version Confirmed [ ] Integrated Software Features (Remote Start/Stop, Automated Billing/Payment, Real-time Energy Monitoring, User Authentication (RFID/App), Load Balancing Control) [ ] Network Configuration Documentation [ ] Software Activation Date [ ] IT/Systems Integration Specialist Approval --- CONNECTIVITY & COMMUNICATION TESTING --- [ ] Network Connection Type (Wi-Fi, Cellular (4G/5G), Ethernet, Bluetooth/Local Mesh) [ ] Signal Strength (RSSI) Value [ ] Communication Protocols Verified (OCPP 1.6, OCPP 2.0.1, MQTT, HTTP/HTTPS) [ ] Connectivity Troubleshooting Notes [ ] Connectivity Test Date [ ] Network Speed/Latency Test Screenshot [ ] Technician Verification --- SAFETY & ACCESSIBILITY COMPLIANCE --- [ ] Safety Equipment Installed (Emergency Shut-off Switch, Fire Extinguisher Station, Safety Signage (High Voltage), Trip Hazard Mitigation (Cable Protectors), Adequate Area Lighting) [ ] ADA Compliance Status (Fully Compliant, Partial Compliance (Requires Modification), Non-Compliant) [ ] Accessibility Obstruction Notes [ ] Safety Inspection Certificate [ ] Safety Officer Verification --- USER EXPERIENCE & SIGNAGE --- [ ] Required Signage Types (Instructional Use Guide, Safety & Emergency Instructions, Payment/Pricing Information, Parking Restriction Notices, Branding & Wayfinding Decals) [ ] Signage Material Specification [ ] Signage Installation Status (Not Started, In Progress, Completed) [ ] Photo Evidence of Installed Signage [ ] Site Manager Verification --- POST-DEPLOYMENT COMMISSIONING & MAINTENANCE --- [ ] Commissioning Completion Date [ ] System Operational Status (Fully Operational, Operational with Pending Issues, Non-Operational) [ ] Completed Verification Tasks (Load Balancing Test Passed, Payment Gateway Verified, Network Connectivity Verified, Safety Shut-off Test Verified) [ ] Maintenance Schedule Notes [ ] Final Inspection Report [ ] Project Manager Approval --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/energy/ev-charging-infrastructure-deployment-checklist-2026 (Click "Install Template" to launch your digital inspection tool immediately)