FINAL PUNCH LIST COMPLETION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- GENERAL SITE CLEANLINESS --- [ ] Overall Site Condition Description [ ] Debris Types Remaining (Check all that apply) (Construction Waste, Packaging Materials, Landscaping Debris, Personal Belongings, Other (Specify in LONG_TEXT)) [ ] Estimated Cubic Yards of Waste Removed [ ] Photos of Cleaned Areas (Evidence of Completion) [ ] Surface Cleaning Status (Complete, Partial, Not Started) [ ] Specific Areas Requiring Additional Cleaning (if applicable) [ ] Final Dust Removal Verification (Yes, No) --- EXTERIOR WORKS --- [ ] Landscaping Completion (%) [ ] Paving Issues Resolved? (Cracks, Settlement, Discoloration, None) [ ] Exterior Lighting Notes [ ] Sprinkler System Backflow Test Date [ ] Drainage Issue Location (if applicable) [ ] Exterior Painting Touch-up Description (if applicable) [ ] Photo Evidence of Completed Exterior Works --- INTERIOR FINISHES --- [ ] Wall Paint Matching Score (0-100) [ ] Description of any minor paint touch-ups needed. [ ] Flooring Issues Detected? (Scratches, Gaps, Unevenness, Stains, None) [ ] Describe any flooring repairs required. [ ] Trim Work Condition (Excellent, Good, Fair, Poor) [ ] Detailed notes about trim issues. [ ] Upload photos of finish inconsistencies (optional) --- MECHANICAL SYSTEMS (HVAC) --- [ ] Supply Air Temperature (Supply) [ ] Return Air Temperature [ ] Exhaust Fan CFM (if applicable) [ ] Airflow Direction Verification (Correct, Incorrect - Requires Adjustment) [ ] Condensate Drain Verification (Clear, Obstructed - Requires Clearing) [ ] Notes on HVAC System Operation or Adjustments [ ] HVAC System Performance Test Report (Optional) [ ] HVAC System Commissioning Date [ ] Time of System Performance Testing --- PLUMBING SYSTEMS --- [ ] Water Pressure (PSI) [ ] Hot Water Temperature (°F) [ ] Sewer Line Leak Test Result (Pass, Fail, N/A) [ ] Water Heater Flush Performed? (Yes, No) [ ] Notes/Comments on Plumbing System Inspection [ ] Date of Plumbing System Inspection [ ] Drainage Slope Verified? (Yes, No) [ ] Plumbing Inspection Photos (Optional) --- ELECTRICAL SYSTEMS --- [ ] Outlet Voltage (each circuit) [ ] Ground Resistance (Ohms) [ ] GFCI Testing Results (each) (Pass, Fail, N/A) [ ] Smoke Detector Functionality (each) (Pass, Fail, N/A) [ ] Notes on Electrical System Operation/Deficiencies [ ] Electrical System Test Reports (if applicable) [ ] Date of Last Electrical Inspection --- DOORS & WINDOWS --- [ ] Door/Window Number [ ] Door/Window Operation (Operates Smoothly, Binding/Difficult to Operate, Sticking, Other (Specify)) [ ] Description of Issues (if applicable) [ ] Hardware Functionality (Functional, Loose, Missing, Damaged) [ ] Sealing/Weatherstripping (Adequate, Leaking, Missing, Damaged) [ ] Photo of Issue (if applicable) [ ] Date of Issue Identified [ ] Correction Status (Not Corrected, Corrected, Pending Correction) --- FIRE SAFETY SYSTEMS --- [ ] Fire Extinguisher Count Verification [ ] Fire Alarm System Test Results (Passed, Failed - Needs Remediation, Partial Pass - Requires Follow-Up) [ ] Last Fire Drill Date [ ] Sprinkler System Inspection Status (Inspection Complete & Approved, Inspection Pending, Inspection Required) [ ] Fire Safety Deficiencies / Remediation Notes [ ] Number of Fire Extinguishers Verified [ ] Emergency Exit Signage Condition (All Signs Present & Illuminated, Missing/Damaged Sign(s), Requires Inspection) --- ACCESSIBILITY COMPLIANCE --- [ ] Ramp Slope Verification (Compliant, Non-Compliant - Requires Correction, N/A - No Ramp Present) [ ] Doorway Width (Minimum) [ ] Accessible Toilet Room - Grab Bar Installation (Installed and Secure, Missing/Damaged, N/A - No Toilet Room) [ ] Accessible Route of Travel Notes [ ] Accessible Parking Spaces (Correct Number Present & Marked, Insufficient Number, Incorrect Marking, N/A - No Parking Area) [ ] Signage Compliance (Compliant - Braille & Pictograms Present, Non-Compliant - Missing or Incorrect, N/A - No Required Signage) [ ] Accessible Entrance Location --- DOCUMENTATION & AS-BUILTS --- [ ] Warranty Documents - HVAC System [ ] Warranty Documents - Plumbing Fixtures [ ] Operation and Maintenance Manuals - Electrical Systems [ ] Summary of Outstanding Items (if any) [ ] Date of As-Built Drawing Submission [ ] Revision Number of As-Built Drawings [ ] As-Built Drawings Received? (Yes, No) [ ] Notes regarding As-Built Drawing accuracy (if applicable) [ ] All Operation Manuals Provided? (Yes, No) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/final-punch-list-completion-checklist (Click "Install Template" to launch your digital inspection tool immediately)