FIRST ARTICLE INSPECTION (FAI) CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- GENERAL INFORMATION --- [ ] FAI Report Number [ ] Part Number [ ] Revision Level [ ] Supplier Name [ ] FAI Date [ ] Quantity of First Article [ ] Order Number / PO Number [ ] FAI Status (Planned, In Progress, Completed, Rejected) --- DOCUMENT REVIEW --- [ ] Drawing Revision Level Verified? (Yes, No) [ ] Specification Document Verified? (Yes, No) [ ] List of Documents Reviewed (e.g., Drawing, Specification, Process Plan) [ ] Upload of Reviewed Document(s) [ ] Document Review Date [ ] Document Control Number (if applicable) [ ] Are there any discrepancies between drawing and purchase order? (Yes, No, N/A) --- MATERIAL VERIFICATION --- [ ] Material Certification Received? (Yes, No) [ ] Material Certificate (e.g., Mill Certificate) [ ] Material Lot Number [ ] Material Supplier Name [ ] Material Conforms to Specification? (Yes, No, N/A) [ ] Discrepancy Details (If Material Doesn't Conform) [ ] Material Hardness (if applicable) [ ] Material Traceability Verified? (Yes, No) --- PROCESS VERIFICATION --- [ ] Describe the Manufacturing Process Sequence [ ] Machine ID (e.g., Milling Machine 1) [ ] Process Control Plan Availability? (Yes, No) [ ] Used Inspection Gauges/Tools (Calipers, Micrometers, CMM, Optical Comparator) [ ] Date of Process Run [ ] Deviations from Standard Operating Procedures (SOPs) [ ] Operator Qualification Status? (Qualified, Unqualified) --- DIMENSIONAL VERIFICATION --- [ ] Length (Dimension A) [ ] Width (Dimension B) [ ] Height (Dimension C) [ ] Diameter (Dimension D) [ ] Wall Thickness (Dimension E) [ ] GD&T Compliance - Position (Pass, Fail, N/A) [ ] GD&T Compliance - Parallelism (Pass, Fail, N/A) [ ] Dimensional Measurement Report --- FUNCTIONAL VERIFICATION --- [ ] Describe the Functional Test Procedure Followed [ ] Test Result: Voltage Output (V) [ ] Test Result: Pressure Output (PSI) [ ] Operating Temperature During Test (Room Temperature (20-25°C), Elevated Temperature (e.g., 50°C), Low Temperature (e.g., -20°C)) [ ] Functional Tests Performed (Check all that apply) (Power On/Off, Speed/Cycle Rate, Load Capacity, Communication Testing, Safety Features) [ ] Overall Functional Test Result (Pass, Fail, Partial Pass, Not Applicable) [ ] Attach Video of Functional Test (if applicable) --- SURFACE FINISH & APPEARANCE --- [ ] Ra Value (Microns) [ ] Rz Value (Microns) [ ] Surface Coating Type (if applicable) (None, Paint, Anodize, Electroplating, Other (Specify in LONG_TEXT)) [ ] Surface Coating Specification (if applicable) [ ] Color Match (if applicable) (Match, Slight Variation, Significant Variation - Document in LONG_TEXT) [ ] Description of Appearance Discrepancies (if any) [ ] Appearance Photographs (Multiple) [ ] Surface Defects Observed? (Yes, No) --- ASSEMBLY VERIFICATION (IF APPLICABLE) --- [ ] Confirm all fasteners are present and correctly installed. (Yes, No, Not Applicable) [ ] Number of Sub-Assemblies Verified (e.g., 100%) [ ] Alignment/Fit of Components (Overall) (Excellent, Acceptable, Poor, Not Applicable) [ ] Detailed observations of component fit and alignment. [ ] Upload photos of critical assembly points. [ ] Torque Verification (if applicable) (Verified and within specification, Not Applicable, Out of Specification) [ ] Torque Values Used (Record Actual Values) [ ] Checklist of Specific Sub-assemblies to be verified (Select All That Apply) (Sub-Assembly A, Sub-Assembly B, Sub-Assembly C, All Sub-Assemblies) --- NON-DESTRUCTIVE TESTING (NDT) (IF APPLICABLE) --- [ ] NDT Method Required? (Yes, No) [ ] Selected NDT Method(s) (Visual Inspection, Dye Penetrant Inspection, Magnetic Particle Inspection, Ultrasonic Testing, Radiographic Testing (X-ray), Other (Specify)) [ ] Specific NDT Requirements (from drawing/specification) [ ] NDT Procedure Documentation [ ] Ultrasonic Thickness Measurement (if applicable) [ ] NDT Results & Anomalies Observed [ ] Acceptance Criteria Met? (Yes, No) [ ] Deviation from Acceptance Criteria (if applicable) [ ] NDT Inspector Signature --- DOCUMENTATION & TRACEABILITY --- [ ] FAI Report Number [ ] FAI Completion Date [ ] Summary of Deviations & Corrective Actions (if any) [ ] Calibration Certificates for Measuring Equipment [ ] Material Certificate Status (Certificate Received & Verified, Certificate Pending, Certificate Not Required) [ ] Lot Number (if applicable) [ ] Traceability Records Verified? (Material Traceability, Process Traceability, Equipment Traceability) [ ] Supplier Part Number [ ] Inspector Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/manufacturing/first-article-inspection-fai-checklist (Click "Install Template" to launch your digital inspection tool immediately)