FLASHING INSTALLATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-INSTALLATION & PLANNING --- [ ] Review Project Plans and Specifications? (Yes, No) [ ] Describe any discrepancies between plans and site conditions. [ ] Confirm Flashing Material Quantity (per plans). [ ] Confirm Flashing Material Type? (Matches Specifications, Requires Substitution (Document)) [ ] Document any material substitutions and approvals. [ ] Date of Plan Review and Approval (if applicable). [ ] Confirm Weather Conditions are Suitable for Installation? (Yes, No - Delay Required) --- MATERIAL VERIFICATION & HANDLING --- [ ] Flashing Material Type Received? (Copper, Aluminum, Steel, Galvanized Steel, Stainless Steel, Other) [ ] Material Manufacturer [ ] Quantity Received (linear feet/sheets) [ ] Quantity Ordered [ ] Material Condition Upon Arrival? (Excellent, Minor Damage, Significant Damage) [ ] Description of Any Damage (if applicable) [ ] Material Storage Method? (Flat on Ground (Protected), Pallet Storage, Elevated Platform, Other) [ ] Notes Regarding Material Storage --- SUBSTRATE PREPARATION --- [ ] Sheathing Condition (Sound & Stable, Minor Damage (patched), Significant Damage (requires repair/replacement)) [ ] Sheathing Thickness (inches) [ ] Existing Moisture Damage? (No, Minor, Significant (requires remediation)) [ ] Describe any substrate repairs made [ ] Framing Material (Wood, Steel, Aluminum) [ ] Note any existing sealant/caulk removal [ ] Surface Cleanliness (Clean & Dry, Dusty, Oily/Contaminated) --- FLASHING INSTALLATION - GENERAL --- [ ] Flashing Material Type? (Aluminum, Copper, Galvanized Steel, Stainless Steel, Other (Specify in LONG_TEXT)) [ ] Flashing Thickness (Gauge) [ ] Notes on material condition upon arrival (dents, scratches, etc.) [ ] Fastener Type Used? (Staples, Screws, Nails, Other (Specify in LONG_TEXT)) [ ] Describe any special installation techniques required (e.g., pre-bending, forming) [ ] Overlap Distance (inches) [ ] Sealing Compound Used (if applicable) (None, Polyurethane, Silicone, Butyl Tape, Other (Specify in LONG_TEXT)) [ ] Record any unusual site conditions affecting installation. --- WALL FLASHING INSTALLATION --- [ ] Window Flashing Type (Z-Flashing, R-Channel, Drip Edge, Custom Fabricated) [ ] Flashing Lap (inches) at Windows [ ] Door Sill Flashing Type (Pre-fabricated Sill Pan, Flat Metal Flashing, Custom Fabricated) [ ] Sill Pan Slope (inches/foot) [ ] Notes on Flashing around Penetrations (pipes, vents) [ ] Wall/Window Interface Sealed With: (Caulk, Sealant, Combination of Caulk and Tape) [ ] Photo Documentation of Window/Wall Flashing [ ] Manufacturer of Flashing Material --- ROOF FLASHING INSTALLATION --- [ ] Roof Slope Category? (Low Slope (≤ 3:12), Medium Slope (4:12 - 12:12), Steep Slope (>12:12)) [ ] Valley Angle (degrees) [ ] Flashing Material Used? (Aluminum, Copper, Galvanized Steel, Stainless Steel) [ ] Flashing Overlap (inches) - Valley [ ] Flashing Overlap (inches) - Chimney/Vent [ ] Notes on Chimney/Vent Flashings [ ] Skylight Flashing Type? (Integrated Flashing, Z-Flashing, Step Flashing) [ ] Photo of Skylight Flashings (pre/during/post) [ ] Detailing notes for roof penetrations --- DETAILING & OVERLAPS --- [ ] Minimum Lap Overlap (inches) [ ] Minimum End Lap Overlap (inches) [ ] Flashing Joint Type (Lapped, Corrugated, Flat, Other) [ ] Details of Flashing Joint Type (if 'Other' selected) [ ] Sealant/Caulk Compatibility (Confirmed Compatible, Not Confirmed, N/A - No Sealant Used) [ ] Notes on Sealant Application (if applicable) [ ] Flashing Securing Method (Fasteners, Adhesive, Both, Other) [ ] Details of Securing Method (if 'Other' selected) [ ] Photos of Overlap and Detailing --- FINAL INSPECTION & CLEANUP --- [ ] Overall Flashing Appearance (Excellent - Neat, Clean, Properly Aligned, Good - Minor Cosmetic Issues, Fair - Noticeable Cosmetic Issues, Poor - Significant Cosmetic Issues) [ ] Number of visible fasteners [ ] Seam Integrity (If Applicable) (Seams Properly Sealed, Minor Seam Leakage, Significant Seam Leakage) [ ] Notes on any observed issues or corrective actions taken. [ ] Debris Removal (Complete - Site Clean and Free of Debris, Partial - Some Debris Remains, Incomplete - Significant Debris Remains) [ ] Date of Inspection [ ] Inspector Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/flashing-installation-checklist (Click "Install Template" to launch your digital inspection tool immediately)