FLOORING INSTALLATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-INSTALLATION ASSESSMENT --- [ ] Subfloor Levelness (Max Deviation) [ ] Subfloor Type (Concrete, Plywood, OSB, Existing Flooring, Other) [ ] Moisture Content (Subfloor) [ ] Moisture Content (Flooring) [ ] Subfloor Condition (Good, Fair, Poor) [ ] Notes on Subfloor Assessment [ ] Subfloor Photos --- MATERIAL DELIVERY & ACCLIMATION --- [ ] Material Delivery Date [ ] Delivery Confirmation Notes (Driver Signature, Condition upon arrival) [ ] Quantity Delivered (Square Feet/Units) [ ] Quantity Ordered (Square Feet/Units) [ ] Material Condition Upon Arrival (Excellent, Good, Fair, Damaged - Report to Supplier) [ ] Acclimation Start Date (Days) [ ] Acclimation Start Date [ ] Acclimation Environment Details (Temperature, Humidity) [ ] Acclimation Complete? (Yes, No) [ ] Acclimation Notes (Observations, Adjustments) --- SUBFLOOR PREPARATION --- [ ] Subfloor Levelness (Deviation Limit) [ ] Subfloor Type (Plywood, OSB, Concrete, Existing Flooring, Other) [ ] Moisture Content (Subfloor) [ ] Moisture Content (Air) [ ] Moisture Barrier Required? (Yes, No, Unsure) [ ] Subfloor Repair Notes [ ] Subfloor Condition Photo(s) [ ] Underlayment Type (if applicable) (Cork, Foam, Rubber, None, Other) --- LAYOUT & PLANNING --- [ ] Room Dimensions (Length) [ ] Room Dimensions (Width) [ ] Total Square Footage [ ] Waste Factor (%) [ ] Direction of Flooring (with respect to longest wall) (Parallel, Perpendicular, Diagonal) [ ] Notes on Layout Considerations (e.g., furniture placement, door swing) [ ] Pattern Type (if applicable) (Straight, Herringbone, Chevron, Random) [ ] Detailed Layout Sketch or Diagram (Optional) --- FLOORING INSTALLATION --- [ ] Manufacturer's Installation Instructions Followed? [ ] Room Temperature (During Installation) [ ] Adhesive Type (If Applicable) (None, Mortar, Glue-Down, Other) [ ] Expansion Gap Considerations? (Around Perimeter Walls, Around Columns, Under Cabinets, Not Applicable) [ ] Flooring Pattern (Straight, Diagonal, Herringbone, Other) [ ] Specific Installation Challenges Encountered (if any)? [ ] Number of Flooring Boxes Installed --- SEAMS, TRANSITIONS & TRIM --- [ ] Seam Adhesive Type (Manufacturer Recommended, Polyurethane, Epoxy, Other (Specify Below)) [ ] Seam Adhesive Notes (If 'Other' Selected) [ ] Transition Strip Type (T-Mold, Reducer, Flush Transition, Beveled Transition) [ ] Transition Strip Fastener Count (per strip) [ ] Trim Installation Notes [ ] Caulk Used (Baseboards/Transitions) (Silicone, Acrylic, None, Other (Specify Below)) [ ] Caulk Notes (If 'Other' Selected) [ ] Installer Signature (Seam/Transition Approval) --- FINISHING & CLEAN-UP --- [ ] Describe any final cleaning procedures performed (e.g., sweeping, vacuuming, mopping) [ ] Was a floor sealant applied? (Yes, No) [ ] If sealant was applied, how many coats? [ ] Note any specific instructions given to the client regarding post-installation care (e.g., avoiding heavy furniture, recommended cleaning products) [ ] Were excess adhesive or grout remnants removed? (Yes, No) [ ] Describe any touch-up work performed (e.g., filling minor scratches, correcting imperfections) --- QUALITY CONTROL & CLIENT WALKTHROUGH --- [ ] Overall Impression Notes [ ] Are there any visible imperfections? (Select all that apply) (Gaps, Scratches, Unevenness, Discoloration, None) [ ] Subfloor Levelness (in inches) [ ] Seam Visibility - Acceptable? (Yes, No) [ ] Client Concerns/Feedback [ ] Client Satisfaction Level (Very Satisfied, Satisfied, Neutral, Dissatisfied, Very Dissatisfied) [ ] Walkthrough Date [ ] Walkthrough Time [ ] Client Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/flooring-installation-checklist (Click "Install Template" to launch your digital inspection tool immediately)