FOOTING FORMWORK INSPECTION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-POUR VERIFICATION --- [ ] Pour Date [ ] Pour Time [ ] Approved Pour Plan? (Yes, No) [ ] Concrete Strength (f'c) [ ] Pour Plan Review Comments (if applicable) [ ] Utilities Located and Marked? (Yes, No, N/A) [ ] Weather Forecast Review & Mitigation Plan (if needed) [ ] Water Management Plan in Place? (Yes, No) --- FORMWORK ALIGNMENT & DIMENSIONS --- [ ] Footing Width (actual) [ ] Footing Length (actual) [ ] Footing Depth (actual) [ ] Check of Level Deviation (max) [ ] Formwork Alignment with Plan (Accurate, Minor Deviation (within tolerance), Significant Deviation (outside tolerance) - Requires Correction) [ ] Corner Alignment (Square, Slightly Out of Square, Significantly Out of Square) [ ] Notes on Dimensional Discrepancies/Corrections Needed --- FORMWORK BRACING & SUPPORT --- [ ] Spacing between Braces (Max) [ ] Height of Formwork [ ] Brace Condition (Good, Fair, Poor) [ ] Bracing Type(s) Present (Diagonal Braces, Vertical Supports, Horizontal Restraints, Shear Walls) [ ] Formwork Stability Assessment (Stable, Slightly Unstable, Unstable) [ ] Comments on Bracing and Support --- FORMWORK MATERIALS & CONDITION --- [ ] Formwork Moisture Content (%) [ ] Formwork Material Type (Plywood, OSB, Steel, Aluminum, Other) [ ] Description of Formwork Condition (Cracks, Splits, etc.) [ ] Presence of Oil/Grease on Formwork Surface (Yes, No) [ ] Formwork Treatment (if applicable) (Release Agent Applied, Waterproofed, Untreated, Other) [ ] Photos of Formwork Condition --- REINFORCEMENT COVER & PLACEMENT --- [ ] Minimum Concrete Cover (mm) [ ] Measured Concrete Cover (mm) - Location 1 [ ] Measured Concrete Cover (mm) - Location 2 [ ] Measured Concrete Cover (mm) - Location 2 [ ] Rebar Tie Wire Secure? (Yes, No, NA) [ ] Rebar Placement Issues? (Incorrect Spacing, Insufficient Overlap, Improper Location, No Issues) [ ] Comments on Rebar Placement/Cover --- UTILITIES & OBSTRUCTIONS --- [ ] Are underground utilities identified and marked? (Yes, No, N/A) [ ] Utility Location Details (if applicable) [ ] Are existing obstructions (e.g., rocks, debris) removed? (Yes, No, N/A) [ ] Details of any remaining obstructions and mitigation plans: [ ] Utility Marking/As-Built Drawings (if available): [ ] Distance from formwork to nearest utility (in feet/meters): --- WEATHER CONSIDERATIONS --- [ ] Air Temperature (Current) [ ] Wet-Bulb Temperature (Current) [ ] Weather Forecast (Next 24 Hours) (Clear, Partly Cloudy, Rain, Snow, Thunderstorms) [ ] Potential for Freezing? (Yes, No) [ ] Notes on Weather Impact/Mitigation --- SAFETY & ACCESS --- [ ] Are appropriate PPE (Personal Protective Equipment) being used by all personnel? (Yes, all personnel wearing required PPE, No, some personnel not wearing required PPE, N/A - No personnel present) [ ] Are barricades and warning signs in place around the work area? (Yes, barricades and signage adequate, No, barricades/signage missing or inadequate, N/A - No public access) [ ] Number of access points to the formwork? [ ] Access route condition (Clear and safe, Slightly obstructed, Hazardous - Requires immediate attention) [ ] Any observed safety concerns or hazards? [ ] Inspector Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/footing-formwork-inspection-checklist (Click "Install Template" to launch your digital inspection tool immediately)