FOUNDATION EXCAVATION INSPECTION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-EXCAVATION VERIFICATION --- [ ] Permit Issue Date [ ] Utility Locating Confirmation Received? (Yes, No, Pending) [ ] Utility Clearance Radius (ft) [ ] Site Survey Completed and Approved? (Yes, No, NA) [ ] Any Observed Site Conditions Requiring Mitigation? [ ] Erosion and Sediment Control Plan Approved? (Yes, No, NA) [ ] Copy of Approved Permits --- EXCAVATION DIMENSIONS & LAYOUT --- [ ] Excavation Length (feet) [ ] Excavation Width (feet) [ ] Excavation Depth (feet) [ ] Match Design Depth? (Yes, No, NA) [ ] Describe any discrepancies between excavation and design plans. [ ] Benchmark/Control Points Verified? (Yes, No, NA) [ ] Attach Site Survey/Layout Verification (Optional) --- SOIL CONDITIONS & STABILITY --- [ ] Describe the observed soil types encountered during excavation. [ ] Depth of excavation to date (feet/meters) [ ] Presence of Groundwater? (Yes, No, Observed but Controlled) [ ] Groundwater Level (feet/meters) – if applicable [ ] Observed signs of instability (select all that apply) (Sloughing, Cracking, Bulging, Settlement, None Observed) [ ] Description of any observed instability and corrective actions taken (if any). [ ] Soil Bearing Capacity Confirmation? (Confirmed by Geotechnical Report, Pending, Field Testing Required) [ ] Attach Photos of Soil Conditions --- SHORING & SLOPE STABILITY --- [ ] Maximum Allowable Slope Angle (degrees) [ ] Shoring System Type (if applicable) (None, Timber Shoring, Soldier Piles & Lagging, Sheet Piling, Retaining Wall, Other (Specify)) [ ] Description of Shoring/Slope Protection System Used [ ] Vertical Spacing of Shoring Supports (inches/feet) [ ] Condition of Shoring Materials (if applicable) (Good, Fair, Poor, Not Applicable) [ ] Potential Stability Concerns Observed? (Sloughing, Settlement, Water Inflow, Lateral Movement, None) [ ] Details of any observed instability or corrective actions taken [ ] Photos/Documentation of Shoring/Slope Protection --- UTILITIES & UNDERGROUND OBSTRUCTIONS --- [ ] Utility Location Verification Method (As-Built Drawings, One-Call System (e.g., 811), Ground Penetrating Radar (GPR), Direct Observation) [ ] Details of Utility Locations Confirmed [ ] Underground Utilities Identified (Gas Line, Water Line, Sewer Line, Electrical Conduit, Communication Lines (Phone, Cable, etc.), Other (Specify in long text)) [ ] Distance from Excavation Edge to Nearest Utility (Feet) [ ] Utility Protection Measures Implemented (Expose and Locate, Pavement Cut, Daylighting, Other (Specify in long text)) [ ] Notes on Utility Conditions or Potential Hazards [ ] Utility Location Maps/Diagrams (if available) --- ENVIRONMENTAL PROTECTION --- [ ] Erosion and Sediment Control Plan Available? (Yes, No, NA) [ ] Description of Erosion and Sediment Control Measures Implemented: [ ] Silt Fences/Barriers Installed? (Yes, No, NA) [ ] Distance of Silt Fence from Property Line (feet): [ ] Dust Control Measures in Place? (Yes, No, NA) [ ] Description of Dust Control Methods: [ ] Photos of Erosion and Sediment Controls: --- SAFETY & ACCESS --- [ ] Were Competent Person (CP) presence and documentation verified? (Yes, No, N/A) [ ] What types of Personal Protective Equipment (PPE) are being used? (Hard Hats, Safety Glasses, High-Visibility Vests, Safety Boots, Gloves, Other (Specify in LONG_TEXT)) [ ] If 'Other' PPE was specified, please describe: [ ] Are Access and Egress points clearly marked and secured? (Yes, No, N/A) [ ] Minimum Safe Vertical Distance from Excavation Edge? [ ] Are warning signs and barricades in place and visible? (Yes, No, N/A) [ ] Describe any safety concerns or corrective actions needed: [ ] Location of nearest emergency access point. --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/foundation-excavation-inspection-checklist (Click "Install Template" to launch your digital inspection tool immediately)