HEALTHCARE FACILITY CONSTRUCTION PROJECT CHECKLIST TEMPLATE Created by ChecklistGuro (https://checklistguro.com) --- PLANNING & DESIGN --- [ ] Project Goals & Objectives [ ] Target Project Completion Date [ ] Estimated Project Budget [ ] Building Type (e.g., Hospital, Clinic, Surgical Center) (Hospital, Clinic, Surgical Center, Specialty Clinic) [ ] Preliminary Site Survey Report [ ] Description of Required Medical Services & Patient Flow [ ] Architectural Design Style (Modern, Traditional, Sustainable, Other) --- PERMITTING & REGULATORY COMPLIANCE --- [ ] Zoning Permit Status (Applied For, Approved, Denied, Pending Review) [ ] Permit Application Submission Date [ ] Permit Application Fee Paid (USD) [ ] Fire Safety Permit Status (Applied For, Approved, Denied, Pending Review) [ ] Copy of Environmental Impact Assessment Report [ ] Notes on Regulatory Communication --- SITE PREPARATION & DEMOLITION --- [ ] Lot Size (Acres) [ ] Description of Existing Site Conditions [ ] Demolition Permit Application Date [ ] Pre-Demolition Site Photos [ ] Demolition Method (Mechanical, Controlled Implosion, Selective Demolition) [ ] Estimated Demolition Waste Volume (Cubic Yards) [ ] Hazardous Materials Identified (e.g., Asbestos, Lead) (Asbestos, Lead-Based Paint, Mercury, None) --- FOUNDATION & STRUCTURE --- [ ] Foundation Depth (feet) [ ] Concrete Strength (PSI) [ ] Concrete Pour Date [ ] Concrete Inspection Signature [ ] Steel Grade Specification [ ] Foundation Type (Slab-on-Grade, Basement, Raft Foundation) [ ] Notes on Structural Integrity Concerns --- EXTERIOR WORKS --- [ ] Scheduled Start Date for Exterior Work [ ] Roofing Material Quantity (sq ft) [ ] Siding Material Samples [ ] Window Quantity [ ] Exterior Lighting Type (LED, Halogen, Solar) [ ] Landscaping Contractor Site Visit Coordinates [ ] Scheduled Completion Date for Exterior Painting --- MEP (MECHANICAL, ELECTRICAL, PLUMBING) --- [ ] HVAC Unit Capacity (BTU) [ ] Electrical Panel Amperage (Amps) [ ] Plumbing Pipe Diameter (inches) [ ] Electrical Wiring Type (Copper, Aluminum) [ ] Plumbing Fixture Types Installed (Sinks, Toilets, Showers, Medical Gas Outlets) [ ] HVAC System Commissioning Date [ ] Electrical System Testing Start Time [ ] Notes on Plumbing Backflow Prevention --- INTERIOR BUILD-OUT --- [ ] Wall Thickness (inches) [ ] Wall Finish Type (Drywall, Paneling, Tile, Other) [ ] Detailed Notes on Wall Finishes (e.g., specific paint codes, texture details) [ ] Flooring Material (Vinyl, Tile, Carpet, Concrete, Other) [ ] Flooring Installation Completion Date [ ] Ceiling Type and Details (e.g., suspended, drywall, acoustic panels) [ ] Ceiling Finish Samples (if applicable) [ ] Number of Interior Doors --- MEDICAL EQUIPMENT INSTALLATION --- [ ] Equipment Vendor (Vendor A, Vendor B, Vendor C, Other) [ ] Equipment Model Number [ ] Quantity [ ] Scheduled Delivery Date [ ] Estimated Installation Start Time [ ] Installation Notes/Specific Requirements [ ] Equipment Manual/Datasheet [ ] Installation Status (Not Started, In Progress, Completed) --- IT & COMMUNICATION INFRASTRUCTURE --- [ ] Network Bandwidth (Mbps) [ ] Wireless Network Standard (Wi-Fi) (Wi-Fi 6 (802.11ax), Wi-Fi 5 (802.11ac), Wi-Fi 4 (802.11n)) [ ] Security Protocols (Firewall, VPN, Intrusion Detection System, Multi-Factor Authentication) [ ] Network Activation Date [ ] Network Documentation (Diagrams, Configurations) [ ] Network Security Audit Report --- INFECTION CONTROL & SAFETY --- [ ] COVID-19 Safety Plan in Place? (Yes, No, In Progress) [ ] Number of Hand Sanitizer Stations [ ] PPE Requirements (Gloves, Masks, Gowns, Eye Protection) [ ] Last Safety Training Date [ ] Description of Ventilation System Enhancements (if any) [ ] Safety Plan Document [ ] Air Filtration System Type (HEPA, UV-C, Standard Filtration, None) --- COMMISSIONING & TESTING --- [ ] Commissioning Start Date [ ] Commissioning Start Time [ ] System Commissioned (Select All That Apply) (HVAC, Electrical, Plumbing, Medical Gas, Fire Safety, Nurse Call System, Security System) [ ] Temperature Verification (HVAC) [ ] Pressure Verification (Medical Gas) [ ] Test Results & Observations [ ] Commissioning Engineer Signature --- FINAL INSPECTIONS & APPROVALS --- [ ] Scheduled Inspection Date [ ] Inspection Type (Building Code Compliance, Fire Safety, Accessibility, Medical Gas, HVAC, Electrical) [ ] Inspector Name [ ] Inspector Company [ ] Inspection Findings (Number of Deficiencies) [ ] Detailed Inspection Notes [ ] Inspector Signature [ ] Resolution Completion Date (if applicable) --- HANDOVER & TRAINING --- [ ] Official Handover Date [ ] Summary of Outstanding Issues/Snag List [ ] Systems Handover Checklist Completed? (Electrical, Plumbing, HVAC, Medical Gases, IT/Networking, Security) [ ] Contractor Representative Signature [ ] Client Representative Signature [ ] Training Summary (Topics Covered, Attendees) [ ] Number of Staff Trained --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/project-management/healthcare-facility-construction-project-checklist-template (Click "Install Template" to launch your digital inspection tool immediately)