HVAC DUCTWORK INSTALLATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-INSTALLATION & PLANNING --- [ ] Review HVAC Drawings & Specifications? (Yes, No) [ ] Review HVAC Permit(s)? (Yes, No) [ ] Date of Plan Review Completion [ ] Summary of Plan Review Findings & Discrepancies [ ] Site Survey Completed? (Yes, No) [ ] Details of Site Conditions (Obstacles, Existing Utilities, etc.) [ ] Estimated Ductwork Length (Feet) [ ] Confirm Material Delivery Schedule? (Yes, No) [ ] Location of Material Staging Area --- MATERIAL VERIFICATION & STORAGE --- [ ] Ductwork Order Quantity (Total Linear Feet) [ ] Duct Material Type Received (Galvanized Steel, Aluminum, Stainless Steel, Flexible Ducting, Other) [ ] Gauge of Steel Received (if applicable) (.018, .020, .025, Other) [ ] Material Receiving Notes (damage, shortages, etc.) [ ] Insulation Type Received (Fiberglass, Foam, Mineral Wool, Other) [ ] Insulation R-Value Received [ ] Material Delivery Receipt/Packing List [ ] Storage Location Notes (e.g., covered/uncovered, protected from elements) [ ] Condition of Delivered Materials (Excellent, Good, Fair, Poor) --- DUCTWORK FABRICATION & FITTING --- [ ] Duct Length Variation (inches) [ ] Duct Width Deviation (inches) [ ] Joint Type Used (e.g., crimped, screwed, welded) (Crimped, Screwed, Welded, Other - Specify) [ ] Description of 'Other' Joint Type (if selected) [ ] Sealant Types Used (check all that apply) (Mastic, Foil Tape, UL 181 Listed Duct Sealant, None) [ ] Duct Profile Alignment (Aligned, Minor Misalignment (less than 1/4 inch), Significant Misalignment (greater than 1/4 inch) - Requires Correction) [ ] Photographic Evidence of Key Joints --- DUCTWORK HANGING & SUPPORT --- [ ] Hanger Spacing (Feet) [ ] Maximum Duct Sag (Inches) [ ] Hanger Type Used (Wire Hanger, Rope Hanger, Bracket Hanger, Clip Hanger, Other (Specify)) [ ] Notes on Hanger Placement/Adjustments [ ] Support Materials Verified? (Hangers, Rods, Brackets, Hardware, N/A) [ ] Ductwork Secured to Structure? (Yes, No) --- SEALING & INSULATION --- [ ] Insulation Type Verified? (Fiberglass, Mineral Wool, Foam (specify type), Other (specify)) [ ] Insulation Thickness (inches) [ ] Joint Sealant Type (Mastic, Foil Tape, Acoustic Sealant, Other (specify)) [ ] Notes on Sealant Application [ ] Sealed Areas (Duct Joints, Penetrations (e.g., pipes, wiring), Connections to Equipment, Transitions between Duct Sizes) [ ] Vapor Barrier Installed? (Yes, No, Not Required) [ ] Sealant/Insulation Material Certificates (if required) --- CONNECTION TO EQUIPMENT --- [ ] Equipment Connection Type (Furnace, Air Conditioner, Heat Pump, Fan Coil Unit, Other (Specify in Long Text)) [ ] Specify 'Other' Equipment Type (if applicable) [ ] Static Pressure at Equipment Connection (inches of water) [ ] Connection Method (Slip & Seal, Flange with Gasket, Direct Connect, Other (Specify in Long Text)) [ ] Specify 'Other' Connection Method (if applicable) [ ] Connection Sealant Used (if applicable) (None, Mastic, Duct Tape, Foam Tape, Other (Specify in Long Text)) [ ] Specify 'Other' Sealant Used (if applicable) [ ] Photo of Equipment Connection [ ] Connection Leak Tested? (Yes, No) --- TESTING & BALANCING --- [ ] Static Pressure Measurement (Supply) [ ] Static Pressure Measurement (Return) [ ] Airflow Measurement (CFM) – System Total [ ] Pressure Testing Outcome (Pass, Fail, NA (Not Applicable)) [ ] Pressure Test Details (if fail) [ ] Testing Methods Used (Pressure Test, Smoke Test, Differential Pressure Test, CFM Measurement) [ ] Date of Balancing [ ] Time of Balancing [ ] Balancing Notes/Adjustments Made --- FINAL INSPECTION & CLEAN-UP --- [ ] Visual Inspection - Ductwork Condition: (No Damage, Minor Damage (Documented), Significant Damage (Requires Repair)) [ ] Sealing Material Integrity: (Satisfactory, Needs Improvement, Unsatisfactory) [ ] Air Leakage Test Result (CFM/ft²): [ ] Noise Level Acceptable? (Yes, No) [ ] Comments/Observations: [ ] Inspection Date: [ ] Inspection Time: [ ] Inspector Signature: [ ] Attach Photos of Inspection: --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/hvac-ductwork-installation-checklist (Click "Install Template" to launch your digital inspection tool immediately)