HVAC SYSTEM EFFICIENCY AUDIT Created by ChecklistGuro (https://checklistguro.com) --- PRELIMINARY ASSESSMENT & DATA GATHERING --- [ ] Date of Last HVAC System Inspection [ ] Brief Description of HVAC System (e.g., Type, Age, Capacity) [ ] Total Building Square Footage [ ] Number of Occupants (Typical) [ ] Type of Building (Office, Retail, Healthcare, etc.) (Office, Retail, Healthcare, Educational, Industrial, Other) [ ] Existing Energy Bills (most recent 12 months) - summary of usage and costs. [ ] Building HVAC System Layout/Schematics (if available) --- BUILDING ENVELOPE & LOAD CALCULATION --- [ ] Building Year of Construction [ ] Description of Building Envelope Materials (walls, roof, windows) [ ] U-Value of Exterior Walls (BTU/hr·ft²·°F) [ ] R-Value of Roof Insulation [ ] Window U-Factor [ ] Solar Heat Gain Coefficient (SHGC) of Windows [ ] Condition of Window Seals (drafty, good, deteriorating) (Drafty, Good, Deteriorating) [ ] Notes on shading (overhangs, landscaping, etc.) and its impact on heating/cooling loads. --- EQUIPMENT INSPECTION & PERFORMANCE EVALUATION --- [ ] Chiller COP (Coefficient of Performance) [ ] Boiler Thermal Efficiency (%) [ ] AHU Fan Power (kW) [ ] Visible Signs of Water Leaks on Equipment? (Yes, No, Unsure) [ ] Notes on compressor noise or vibration (if applicable) [ ] Condition of belts and pulleys (if applicable) (Good, Fair, Poor, N/A) [ ] Supply Air Temperature (°C) [ ] Return Air Temperature (°C) [ ] Additional observations/comments on equipment performance --- CONTROL SYSTEM ANALYSIS --- [ ] BAS Version Number [ ] BAS Manufacturer (Siemens, Honeywell, Johnson Controls, Tridium, Other) [ ] Which of the following control strategies are implemented? (Demand Limiting, Optimal Start/Stop, Economizer Control, Night Purge, Supply Air Temperature Reset, Chilled Water Temperature Reset) [ ] Describe any observed anomalies or unexpected behavior in the BAS. [ ] Is trend data readily accessible and usable for analysis? (Yes, No, Partially) [ ] Number of schedules actively utilized [ ] Note any issues with point naming conventions or documentation quality. --- DUCTWORK & AIR DISTRIBUTION --- [ ] Overall Ductwork Condition Notes [ ] Duct Leakage Assessment (No Visible Leaks, Minor Leaks (Easily Sealable), Significant Leaks Requiring Repair, Pressure Decay Test Performed (Results: _____)) [ ] Average Duct Static Pressure (inches of water) [ ] Duct Insulation Condition (Excellent, Good, Fair, Poor) [ ] Air Terminal Device (Register/Diffuser) Observations [ ] Airflow Balancing Issues? (No Issues, Some Areas Over-Supplied, Some Areas Under-Supplied, Requires Balancing Report Review) [ ] Ductwork/Air Distribution Photos [ ] Duct Material Type (Galvanized Steel, Aluminum, Fiberglass Ductboard, Flexible Ductwork, Other (Specify: ________)) --- WATER SYSTEMS (CHILLED/HOT WATER) --- [ ] Chilled Water Supply Temperature (Entering) [ ] Chilled Water Return Temperature [ ] Chilled Water Flow Rate (GPM) [ ] Hot Water Supply Temperature (Entering) [ ] Hot Water Return Temperature [ ] Hot Water Flow Rate (GPM) [ ] Water Treatment Type (e.g., Chemical, Ion Exchange) (Chemical, Ion Exchange, Reverse Osmosis, Other) [ ] Observations regarding water treatment performance and any recent adjustments. [ ] Visible Signs of Corrosion? (Yes, No, Uncertain) --- ENERGY METERING & DATA ANALYSIS --- [ ] Total HVAC Energy Consumption (kWh) [ ] Peak HVAC Demand (kW) [ ] Date of Last Energy Bill Review [ ] Metering System Type (e.g., building automation, submetering) (Building Automation System (BAS), Submetering, Utility Bills Only, Other) [ ] Which parameters are currently being monitored? (Temperature, Humidity, Energy Consumption, Water Flow, Pressure, Equipment Runtime) [ ] Summary of Energy Consumption Trends (Past 12 Months) [ ] U-Factor (if available - HVAC specific) [ ] Does the facility have baseline data for comparison? (Yes, No) --- REPORTING & RECOMMENDATIONS --- [ ] Executive Summary of Findings [ ] Estimated Total Cost Savings (Annual) [ ] Estimated Return on Investment (ROI) [ ] Prioritized Recommendations (Select all that apply) (Equipment Upgrades, Control System Optimization, Ductwork Sealing/Insulation, Building Envelope Improvements, Operational Adjustments, Energy Management System Implementation) [ ] Detailed Recommendations & Justification (for each prioritized item) [ ] Supporting Documentation (e.g., energy modeling reports, vendor quotes) [ ] Recommended Implementation Start Date [ ] Additional Notes or Comments [ ] Auditor Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/facility-management/hvac-system-efficiency-audit (Click "Install Template" to launch your digital inspection tool immediately)