KANBAN SYSTEM REVIEW CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- SYSTEM OVERVIEW & GOALS --- [ ] Briefly describe the primary goals of this Kanban system within the manufacturing process. [ ] What is the target Overall Equipment Effectiveness (OEE) that this Kanban system aims to support? [ ] Does this Kanban system align with the overall Manufacturing Strategy? (Yes, No, Partially) [ ] Date of last strategic review linking Kanban to manufacturing goals. [ ] Summarize any significant changes in manufacturing goals since the last Kanban System Review. [ ] Is the Kanban system achieving its intended goals? (Yes, No, Needs Improvement) [ ] If the answer to the previous question is 'No' or 'Needs Improvement', briefly explain why. --- BOARD DESIGN & VISUALIZATION --- [ ] Number of Columns [ ] Description of Swimlanes (if any) [ ] Board Type (Physical/Digital/Hybrid) (Physical, Digital, Hybrid) [ ] Color Coding Used? (Select all that apply) (Priority, Type of Work, Status, Team, None) [ ] Describe any visual cues/icons used on cards [ ] Ease of Understanding (Board clarity for new users) (Very Easy, Easy, Neutral, Difficult, Very Difficult) [ ] Attach a Photo/Screenshot of the Kanban Board --- CARD DEFINITION & CONTENT --- [ ] Part Number [ ] Description [ ] Quantity Required [ ] Due Date [ ] Priority Level (High, Medium, Low) [ ] Special Instructions / Notes [ ] Material Type (Raw Material, Component, Finished Good) --- WORKFLOW & CYCLE TIMES --- [ ] Average Cycle Time - Stage 1 (e.g., Cutting) [ ] Average Cycle Time - Stage 2 (e.g., Assembly) [ ] Average Cycle Time - Stage 3 (e.g., Quality Check) [ ] Average Total Cycle Time (all stages) [ ] Identify Bottlenecks: Describe any observed bottlenecks in the workflow. [ ] Bottleneck Severity (if applicable) (Minor, Moderate, Significant) [ ] Proposed Solutions for Bottlenecks: Outline any proposed solutions to address identified bottlenecks. [ ] Date of Last Cycle Time Measurement [ ] Percentage Change in Total Cycle Time (vs. last review) --- WORK IN PROGRESS (WIP) LIMITS --- [ ] Current WIP Limit - Stage 1 (e.g., Cutting) [ ] Current WIP Limit - Stage 2 (e.g., Assembly) [ ] Current WIP Limit - Stage 3 (e.g., Finishing) [ ] Average WIP Levels - Stage 1 [ ] Average WIP Levels - Stage 2 [ ] Average WIP Levels - Stage 3 [ ] Are current WIP limits optimal? (Yes, No, Unsure) [ ] Explanation if WIP Limits are not optimal. --- REPLENISHMENT & ORDERING --- [ ] Current Safety Stock Levels (for critical materials) [ ] Reorder Point (ROP) Accuracy (average deviation) [ ] Replenishment Signal Type (Kanban Card, Digital Signal, Scheduled Order, Manual Request) [ ] Describe any discrepancies between actual material flow and replenishment signals. [ ] Date of last replenishment process review [ ] Lead Time Accuracy (average days) [ ] Supplier Performance - On-Time Delivery (Critical Materials) (Excellent (98-100%), Good (90-97%), Average (80-89%), Needs Improvement (Below 80%)) --- TEAM PERFORMANCE & TRAINING --- [ ] Team Member Understanding of Kanban Principles (1-5, 1=Poor, 5=Excellent) [ ] Frequency of Kanban Training Sessions (per month) [ ] Describe any observed deviations from established Kanban processes by team members. [ ] Which of the following training topics are needed? (Select all that apply) (New Team Member Onboarding, Advanced Kanban Techniques, Problem Solving and Bottleneck Analysis, Data Analysis and Reporting) [ ] How effective is the current method for sharing Kanban updates and changes? (Very Effective, Effective, Neutral, Ineffective, Very Ineffective) [ ] What suggestions do team members have to improve Kanban understanding and adherence? [ ] Date of last Kanban training session. --- METRICS & REPORTING --- [ ] Average Lead Time (Days) [ ] Cycle Time for Stage 1 (Minutes) [ ] Number of Cards Completed per Shift [ ] Percentage of Cards Delivered On Time [ ] Brief Summary of Recent Metric Trends [ ] Are metrics being tracked and visualized effectively? (Yes, No, Partially) [ ] Attach KPI Report (if applicable) [ ] Date of Last KPI Review --- SYSTEM ADHERENCE & CONTINUOUS IMPROVEMENT --- [ ] Percentage of cards fully compliant with standard card format. [ ] How frequently are Kanban reviews conducted? (Daily, Weekly, Bi-weekly, Monthly, Less than Monthly) [ ] Describe any deviations from standard Kanban practices observed. [ ] Which improvement suggestions have been implemented since the last review? (Improved Card Design, Adjusted WIP Limits, Increased Training, Board Layout Changes, None) [ ] Date of last team training on Kanban principles. [ ] Document any roadblocks or challenges preventing full adherence to Kanban principles. [ ] Overall, how satisfied are team members with the current Kanban system? (Very Satisfied, Satisfied, Neutral, Dissatisfied, Very Dissatisfied) [ ] Upload any relevant documentation supporting observations (e.g., process diagrams, training materials) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/manufacturing/kanban-system-review-checklist (Click "Install Template" to launch your digital inspection tool immediately)