LABORATORY VENTILATION SYSTEM CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- SYSTEM OVERVIEW & DOCUMENTATION --- [ ] System Name/Description [ ] System Design Air Changes per Hour (ACH) [ ] Date of Last System Design Review [ ] System Schematic/Diagram [ ] Brief Description of System Function & Purpose [ ] System Type (e.g., Dedicated, Recirculation) (Dedicated, Recirculation, Other) [ ] Date of Last Inspection/Audit --- SUPPLY AIR SYSTEM --- [ ] Supply Air Temperature (°C) [ ] Supply Air Pressure (Pa) [ ] Supply Air Flow Rate (m³/hr) [ ] Air Filter Condition (Visual Inspection) (Excellent, Good, Fair, Poor) [ ] Last Air Filter Replacement Date [ ] Fan Motor Operational Noise Level (Qualitative) [ ] Any unusual observations noted during inspection? --- EXHAUST AIR SYSTEM --- [ ] Exhaust Fan RPM (Revolutions Per Minute) [ ] Differential Pressure Across Exhaust Filter (in inches of water) [ ] Exhaust Duct Integrity (Visual Inspection) (Intact, Minor Damage, Significant Damage, Corrosion Present) [ ] Dampers Operating Correctly? (Yes, No, N/A) [ ] Last Exhaust Duct Cleaning Date [ ] Notes/Comments on Exhaust System Condition [ ] Location of Exhaust Fan --- FUME HOODS & LOCAL EXHAUST VENTILATION (LEV) --- [ ] Fume Hood Face Velocity (ft/min) [ ] Fume Hood Static Pressure (inches of water) [ ] Fume Hood Sash Position (At Rest) (Fully Open, Mid-Position, Fully Closed, Other) [ ] Fume Hood Light Functionality (Working, Not Working, N/A) [ ] Electrical Outlet Functionality (Fume Hood) (Working, Not Working, N/A) [ ] Observations/Notes on Fume Hood Performance [ ] Check all that apply: LEV System Issues (Excessive Noise, Visible Damage, Reduced Airflow, Alarm Activation, None Observed) [ ] Date of Last Filter Change (LEV) --- AIR FILTRATION & QUALITY --- [ ] Pre-Filter Pressure Drop (inches of water) [ ] HEPA Filter Pressure Drop (inches of water) [ ] Filter Changeout Schedule Followed? (Yes, No, N/A) [ ] Last Filter Change Date (Pre-Filter) [ ] Last Filter Change Date (HEPA Filter) [ ] Notes on Filter Condition (e.g., discoloration, damage) [ ] Air Quality Monitoring Performed? (Yes, No, N/A) [ ] Upload Air Quality Test Results (if applicable) --- CONTROLS & MONITORING --- [ ] Supply Air Pressure (in WC) [ ] Exhaust Air Pressure (in WC) [ ] Fan Status (On, Off, Alarm) [ ] Filter Pressure Drop Status (Normal, Warning, Alarm) [ ] Last System Performance Test Date [ ] Time of Current Reading/Inspection [ ] Notes on Control System Operation [ ] Screenshot of Monitoring System Dashboard (if applicable) --- MAINTENANCE RECORDS & HISTORY --- [ ] Last Filter Change Date (Supply Air) [ ] Last Filter Change Date (Exhaust Air) [ ] Filter Pressure Drop (Supply Air) - Current Reading [ ] Filter Pressure Drop (Exhaust Air) - Current Reading [ ] Summary of Recent Maintenance Activities (Last 6 Months) [ ] Review of Trending Data (e.g., pressure drop, airflow) (Review Completed - No Concerns, Review Completed - Minor Deviation, Review Completed - Significant Deviation - Follow Up Required) [ ] Upload of Maintenance Log/Record (if applicable) [ ] Date of Last System Performance Test --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/facility-management/laboratory-ventilation-system-checklist (Click "Install Template" to launch your digital inspection tool immediately)