LIGHTING RETROFIT ASSESSMENT Created by ChecklistGuro (https://checklistguro.com) --- INITIAL ASSESSMENT & INFORMATION GATHERING --- [ ] Project Goals & Objectives [ ] Building Size (sq ft) [ ] Building Type (Office, Retail, Warehouse, Industrial, Educational, Healthcare, Other) [ ] Date of Last Lighting System Evaluation (if applicable) [ ] Current Lighting System Concerns/Issues (reported by occupants or FM) [ ] Current Lighting Control System (if any) (None, Timer-based, Photocell-based, Manual Switches, Dimmable System, Smart Building System) [ ] Contact Person for Lighting Retrofit Project [ ] Approximate Number of Lighting Fixtures --- EXISTING LIGHTING INVENTORY & ANALYSIS --- [ ] Fixture ID/Location Number [ ] Fixture Type (Incandescent, Fluorescent (T12), Fluorescent (T8), Compact Fluorescent (CFL), Metal Halide, High Pressure Sodium (HPS), LED, Other (Specify)) [ ] Fixture Description (e.g., model number, manufacturer) [ ] Wattage (per fixture) [ ] Number of Fixtures in Area [ ] Lumens Output (estimated or manufacturer's data) [ ] Control Type (if applicable) (None, Occupancy Sensor, Daylight Harvesting, Dimming) [ ] Notes/Observations (e.g., condition, issues) --- ENERGY CONSUMPTION & COST ANALYSIS --- [ ] Current Total Lighting Energy Consumption (kWh/year) [ ] Average Lighting Operating Hours per Year [ ] Current Average Electricity Rate ($/kWh) [ ] Total Annual Lighting Cost ($) [ ] Utility Rate Structure (e.g., Tiered, Demand) (Tiered, Demand, Flat, Time-of-Use, Other - Specify in Long Text) [ ] Notes on Utility Billing or Rate Structure (if applicable) [ ] Power Factor of Existing Lighting (if known) --- LIGHTING LEVEL & QUALITY EVALUATION --- [ ] Foot-candle (Lux) measurement at workstation 1 [ ] Foot-candle (Lux) measurement at workstation 2 [ ] Foot-candle (Lux) measurement - common area [ ] Lighting Uniformity - Overall Assessment (Excellent, Good, Fair, Poor) [ ] Color Rendering Index (CRI) - Acceptability (Excellent (>80), Good (70-80), Acceptable (50-70), Poor (<50) - Requires Attention) [ ] Observed Glare Issues? (Direct Glare, Veiled Glare, No Glare Observed, Other (Specify in Long Text)) [ ] Describe any observed issues with light distribution or visual comfort. [ ] Overall occupant satisfaction with existing lighting (scale 1-5, 5 being most satisfied) (1, 2, 3, 4, 5) --- RETROFIT OPTIONS & TECHNOLOGY REVIEW --- [ ] Consideration of LED Technology? (Yes, No, Not Sure) [ ] Potential Lighting Control Strategies? (Occupancy Sensors, Daylight Harvesting, Dimming Controls, Time Scheduling, Networked Lighting Control Systems) [ ] Estimated LED Lumens per Watt (lm/W) [ ] Color Temperature Preference (CCT)? (Warm White (2700K-3000K), Neutral White (3500K-4000K), Cool White (4000K-5000K), Custom / Other) [ ] Notes on Specific Fixture Replacement Opportunities (e.g., high bay, troffer) [ ] Attach Fixture Datasheets (if available) --- FINANCIAL ANALYSIS & ROI CALCULATION --- [ ] Estimated Project Cost (Total) [ ] Current Annual Lighting Energy Consumption (kWh) [ ] Current Electricity Rate ($/kWh) [ ] Estimated Annual Energy Savings (kWh) [ ] Estimated Annual Cost Savings ($) [ ] Estimated Rebate/Incentive Amount ($) [ ] Simple Payback Period (Years) [ ] Return on Investment (ROI) (%) [ ] Assumptions & Notes for ROI Calculation --- IMPLEMENTATION PLANNING & LOGISTICS --- [ ] Planned Start Date of Retrofit [ ] Planned Completion Date of Retrofit [ ] Estimated Downtime (in hours) per area [ ] Detailed Area Sequencing Plan (how areas will be retrofitted in order) [ ] Safety Precautions Required (check all that apply) (Lockout/Tagout Procedures, Fall Protection, Dust Control, Noise Mitigation, Traffic Control) [ ] Waste Disposal Method (Recycling, Landfill, Specialized Lighting Waste Disposal) [ ] Contingency Plan for Unexpected Issues [ ] Detailed Retrofit Layout Drawings --- POST-RETROFIT VERIFICATION & COMMISSIONING --- [ ] Measured Lighting Levels (Foot-Candles) [ ] Color Temperature Consistency? (Consistent, Slight Variation, Significant Variation) [ ] Control System Functionality Verified? (Yes - Fully Functional, Yes - Minor Adjustments Needed, No - Issues Identified) [ ] Notes on observed issues or deviations from expected performance. [ ] Date of Commissioning Completion [ ] Post-Retrofit Energy Consumption (kWh) [ ] Occupant Feedback Received? (Yes, No) [ ] Post-Retrofit Photos/Videos --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/facility-management/lighting-retrofit-assessment (Click "Install Template" to launch your digital inspection tool immediately)