MINE REHABILITATION & CLOSURE CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PLANNING & PERMITTING --- [ ] Rehabilitation Plan Summary [ ] Rehabilitation Plan Document [ ] Permit Status (Approved, Pending, Denied, Expired) [ ] Permit Expiration Date [ ] Relevant Regulations/Legislation [ ] Permit Number --- TOPSOIL MANAGEMENT --- [ ] Volume of Topsoil Stockpiled (m³) [ ] Date of Topsoil Removal [ ] Location of Topsoil Stockpile (GPS Coordinates) [ ] Stockpile Cover Type (None, Geotextile, Organic Material, Other) [ ] Notes on Topsoil Condition (Texture, Organic Matter, etc.) [ ] Photos of Topsoil Stockpile --- LANDFORM DESIGN & CONSTRUCTION --- [ ] Slope Angle (Degrees) [ ] Contour Interval (Metres) [ ] Landform Design Type (Natural contours, Terraced, Ramped, Combination) [ ] Description of Landform Design Features [ ] Landform Design Drawings [ ] Erosion Control Measures Implemented (Riprap, Check dams, Terraces, Vegetation, None) [ ] Construction Start Date [ ] Construction Completion Date --- VEGETATION ESTABLISHMENT --- [ ] Planting Date [ ] Seedling Density (per hectare) [ ] Seed Germination Rate (%) [ ] Seed Mix Components (as per plan) (Native Grasses, Native Forbs, Shrubs, Trees) [ ] Planting Method (Direct Seeding, Seedling Transplanting, Hydroseeding) [ ] Observations on Initial Vegetation Growth [ ] Photos of Vegetation Establishment --- WATER MANAGEMENT --- [ ] Surface Water pH Level (SU) [ ] Groundwater Depth (meters) [ ] Sediment Discharge Rate (m³/s) [ ] Water Quality Exceeds Limits? (Yes, No, N/A) [ ] Description of any Water Quality Concerns [ ] Date of Last Water Quality Sampling [ ] Water Quality Sampling Report [ ] Sampling Location Coordinates --- WASTE ROCK MANAGEMENT --- [ ] Waste Rock Pile Volume (m³) [ ] Slope Angle (degrees) [ ] Rock Type (Granite, Shale, Sandstone, Limestone, Other) [ ] Potential Hazards (Slope Instability, Acid Rock Drainage (ARD), Dust Generation, Erosion, Seepage) [ ] Last Stability Assessment Date [ ] Description of Vegetation Cover [ ] Stability Assessment Report [ ] Drainage Control Measures Height (m) --- TAILINGS MANAGEMENT --- [ ] Tailings Dam Height (m) [ ] Seepage Rate (m/year) [ ] Tailings Type (Fine Sand, Silt, Clay, Slime) [ ] Last Instrumentation Calibration Date [ ] Recent Dam Stability Report [ ] Observations/Comments on Dam Condition [ ] Potential Risks Identified (Overtopping, Slope Failure, Seismic Activity, Dust Generation) [ ] Time of Dam Inspection --- INFRASTRUCTURE REMOVAL --- [ ] Description of Infrastructure to be Removed [ ] Scheduled Removal Date [ ] Estimated Removal Cost (AUD) [ ] Deconstruction Method (Complete Demolition, Selective Dismantling, Salvage for Reuse) [ ] Pre-Removal Site Photos [ ] Responsible Party Signature (Removal Supervisor) [ ] Notes/Comments on Removal Process --- MONITORING & REPORTING --- [ ] Monitoring Event Date [ ] Monitoring Event Time [ ] Water Quality Parameter - pH [ ] Water Quality Parameter - Turbidity (NTU) [ ] Vegetation Cover (%) [ ] Observations & Comments [ ] Supporting Documentation [ ] Reporting Status (Report Submitted, Report Pending, Report Required) --- FINAL INSPECTION & SIGN-OFF --- [ ] Final Inspection Date [ ] Summary of Final Inspection Findings [ ] Rehabilitation Success - Overall Assessment (Fully Successful, Partially Successful, Not Successful) [ ] Vegetation Cover Percentage (Estimate) [ ] Inspector Signature [ ] Landowner/Client Signature [ ] GPS Coordinates of Key Inspection Points --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mining-management/mine-rehabilitation-closure-checklist (Click "Install Template" to launch your digital inspection tool immediately)