MINE TAILINGS STORAGE FACILITY CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- DESIGN & CONSTRUCTION REVIEW --- [ ] Design Slope Angle (Degrees) [ ] Foundation Bearing Capacity (kPa) [ ] Design Approval Date [ ] Foundation Type (Rock, Soil, Mixed) [ ] Approved Design Drawings [ ] Seepage Control Method (Clay Liner, GCL, Geomembrane) [ ] Design Engineer Name --- DAM STABILITY MONITORING --- [ ] Pore Pressure at Instrument A (kPa) [ ] Seepage Rate (m³/day) [ ] Groundwater Level (m ASL) [ ] Date of Last Survey [ ] Time of Measurement [ ] Dam Stability Assessment (Qualitative) (Stable, Potentially Unstable, Unstable) [ ] Observed Anomalies or Concerns [ ] Attachment: Monitoring Data Spreadsheet --- WATER MANAGEMENT SYSTEMS --- [ ] Decant Pond Water Level (m) [ ] Discharge Flow Rate (m³/s) [ ] Water Quality Parameters (Select all that apply) (pH, Turbidity, Suspended Solids, Electrical Conductivity, Heavy Metals) [ ] Seepage Rate (m/day) [ ] Last Pond Cleaning Date [ ] Comments on Water Management System Performance --- TAILINGS CHARACTERISTICS --- [ ] Tailings Density (t/m³) [ ] Particle Size (d50, mm) [ ] Viscosity (cP) [ ] Tailings Type (Sandy, Slime, Colloidal) [ ] Geochemical Analysis Summary [ ] Tailings Characterization Report [ ] Date of Last Characterization --- INSTRUMENTATION AND MONITORING --- [ ] Piezometer Reading (Location 1) [ ] Slope Extensometer Reading [ ] Inclinometer Reading (Angle) [ ] Last Calibration Date (Piezometers) [ ] Time of Data Download [ ] Data Transmission Status (Successful, Partial, Failed) [ ] Notes / Observations [ ] Screenshot of Data Logger Display --- EMERGENCY RESPONSE PREPAREDNESS --- [ ] Last Emergency Drill Date (Within Last 12 Months, Over 12 Months Ago) [ ] Next Scheduled Drill Date [ ] Typical Alert Activation Time [ ] Number of Trained Emergency Responders [ ] Communication Methods Verified (Radio, Mobile Phone, Public Address System, Email, Other) [ ] Evacuation Routes Checked [ ] Summary of Recent Drill Findings & Actions Taken --- VISUAL INSPECTION - STRUCTURAL INTEGRITY --- [ ] Presence of Visible Cracks (Dam Wall) [ ] Maximum Crack Width (inches) [ ] Description of Settlement Patterns (if any) [ ] Evidence of Erosion at Toe of Dam (None, Minor, Moderate, Severe) [ ] Photos of Dam Wall - Overview [ ] Additional Observations/Comments [ ] Signs of Vegetation Stress (None, Slight, Moderate, Severe) --- REGULATORY COMPLIANCE --- [ ] Last Permit Renewal Date [ ] Permit Type (e.g., Water Discharge, Air Emissions) (Water Discharge Permit, Air Emissions Permit, Mining Operation Permit, Rehabilitation Permit) [ ] Permit Number [ ] Summary of Recent Regulatory Inspections (if applicable) [ ] Compliance Status (based on latest inspection/reporting) (Compliant, Minor Non-Compliance, Major Non-Compliance) [ ] Next Reporting Deadline [ ] Upload most recent compliance report --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mining-management/mine-tailings-storage-facility-checklist (Click "Install Template" to launch your digital inspection tool immediately)