MINING BLAST PLAN REVIEW CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- BLAST PLAN OVERVIEW & OBJECTIVES --- [ ] Project Name [ ] Blast Plan Purpose & Scope [ ] Block Number/Sequence [ ] Date of Plan Creation [ ] Plan Type (Production/Development/Rescue) (Production, Development, Rescue) [ ] Brief Summary of Blast Objectives --- GEOTECHNICAL DATA & SITE CONDITIONS --- [ ] Summary of Geological Report [ ] Rock Unit Dip Angle (degrees) [ ] Joint Spacing (meters) [ ] Dominant Rock Type (Granite, Sandstone, Limestone, Shale, Basalt, Other) [ ] Geotechnical Survey Maps [ ] Date of Last Geotechnical Survey [ ] Description of Observed Faults/Fractures --- BLAST DESIGN PARAMETERS --- [ ] Burden (meters) [ ] Spacing (meters) [ ] Maximum Hole Depth (meters) [ ] Hole Angle (degrees) (-30, -20, -15, -10, 0) [ ] Delay Sequence (milliseconds) [ ] Firing Pattern (Staggered, Square, Linear) [ ] Stemming Thickness (meters) --- DRILLING & FRAGMENTATION --- [ ] Hole Depth (meters) [ ] Hole Diameter (mm) [ ] Hole Angle (degrees) [ ] Drilling Pattern Type (Straight, Staggered, Fan) [ ] Drilling Method Description [ ] Drill Pattern Diagram [ ] Expected Fragmentation Size (mm) [ ] Fragmentation Control Measures (Optimized Burden, Explosive Type Selection, Delay Sequencing, Pre-splitting) --- EXPLOSIVES SELECTION & CALCULATION --- [ ] Total Explosive Mass (kg) [ ] Explosive Density (kg/m³) [ ] Type of Explosive Used (Ammonium Nitrate Fuel Oil (ANFO), Emulsion, Gelatin, Other (Specify)) [ ] Justification for Explosive Selection [ ] Average Hole Diameter (mm) [ ] Average Burden (m) [ ] Explosives Cost per kg (AUD) --- SEQUENCE AND TIMING --- [ ] Delay Time (Seconds) - First Hole [ ] Delay Time (Seconds) - Subsequent Holes [ ] Total Delay Sequence Length (Seconds) [ ] Delay Type (Electronic Detonation, Fuse Detonation, Other (Specify)) [ ] Justification for Delay Sequence [ ] Burden and Spacing Methodology (Standard Practice, Geotechnical Analysis, Previous Blast Data) [ ] Date of Sequence Calculation Review --- GROUND CONTROL AND STABILITY --- [ ] Rock Mass Rating (RMR) Value [ ] Geological Strength Index (GSI) Value [ ] Existing Ground Support System (None, Rock Bolts, Shotcrete, Cable Bolts, Mesh, Steel Sets) [ ] Description of Existing Ground Conditions [ ] Potential Instability Features Observed (Jointing, Faulting, Shearing, Swelling, Water Inflow, Blocky Failure, Toppling) [ ] Proposed Ground Support Modifications (if any) [ ] Ground Stability Risk Level (Low, Moderate, High) --- VIBRATION & AIRBLAST MITIGATION --- [ ] Peak Particle Velocity (PPV) Limit (m/s) [ ] Airblast Overpressure Limit (dB) [ ] Blast Pattern Design to Minimize Vibration? (Yes, No, N/A) [ ] Mitigation Techniques Implemented (select all that apply) (Reduced Charge, Delay Sequencing, Burden Adjustment, Smooth Boreholes, Pre-splitting, Other) [ ] Description of 'Other' Mitigation Techniques (if selected) [ ] Date of Vibration/Airblast Monitoring Plan Review [ ] Upload Vibration Monitoring Plan --- ENVIRONMENTAL CONSIDERATIONS --- [ ] Predicted Dust Emission (mg/m³) [ ] Predicted Noise Level (dB) [ ] Proximity to Water Sources? (Yes, No, Adjacent) [ ] Description of Water Management Plan [ ] Applicable Environmental Regulations (Clean Air Act, Clean Water Act, Endangered Species Act, Local Noise Ordinances) [ ] Date of Last Environmental Impact Assessment [ ] Environmental Monitoring Plan Document --- REGULATORY COMPLIANCE & APPROVALS --- [ ] Permit Number [ ] Permit Description [ ] Permit Issue Date [ ] Permit Expiration Date [ ] Regulatory Body (Mines and Resources Department, Environmental Protection Agency, Local Government Authority) [ ] Copy of Permit Document [ ] Permit Status (Active, Pending, Expired) --- RISK ASSESSMENT & MITIGATION --- [ ] Describe potential blast-related hazards identified. [ ] Detail existing mitigation measures for each hazard. [ ] Estimated Vibration Intensity (Peak Particle Velocity) [ ] Estimated Airblast Overpressure [ ] Severity of Potential Impact (if Hazard Occurs) (Negligible, Minor, Moderate, Major, Catastrophic) [ ] Likelihood of Occurrence (Rare, Unlikely, Possible, Likely, Almost Certain) [ ] Supporting Documentation (e.g., Vibration Monitoring Plan) --- COMPETENCY & TRAINING --- [ ] Blaster Certification Status (Certified, Provisional, Uncertified) [ ] Blaster Certification Expiration Date [ ] Years of Blasting Experience [ ] Completion of Blast Plan Review Training? (Yes, No) [ ] Date of Last Refresher Training [ ] Details of any relevant experience or specialized training --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mining-management/mining-blast-plan-review-checklist (Click "Install Template" to launch your digital inspection tool immediately)