MINING GROUND CONTROL CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- VISUAL INSPECTION & MAPPING --- [ ] Date of Inspection [ ] Area/Block Inspected [ ] Geological Formation Present [ ] Joint Spacing (Average) [ ] Orientation of Major Joints (Dip & Strike) [ ] Description of Visible Rock Defects (e.g., cracks, shear zones) [ ] Photographs of Ground Conditions [ ] Rock Quality Designation (RQD) (Excellent (90-100), Good (75-90), Fair (50-75), Poor (25-50), Very Poor (<25)) --- SUPPORT SYSTEM ASSESSMENT --- [ ] Bolt Torque (kN·m) [ ] Cable Bolt Length (m) [ ] Mesh Condition (Good, Fair, Poor, Damaged) [ ] Support System Issues (Corrosion, Loose Fasteners, Grouted Void, Damage/Deformation, None Observed) [ ] Detailed Description of Support Condition [ ] Overall Support System Integrity (Satisfactory, Marginal, Unsatisfactory) --- CONVERGENCE MONITORING --- [ ] Extensometer Reading (Point A) [ ] Extensometer Reading (Point B) [ ] Tape Survey - Crown Height (mm) [ ] Tape Survey - Sidewall Closure (mm) [ ] Convergence Monitoring Date [ ] Convergence Monitoring Time [ ] Observations & Anomalies --- INSTRUMENTATION FUNCTIONALITY --- [ ] Extensometer 1 Status (Functional, Faulty, Not Installed, Needs Calibration) [ ] Tape Survey Functionality (Functional, Faulty, Needs Calibration) [ ] Load Cell 1 Reading (kN) [ ] Pressure Cell 1 Status (Functional, Faulty, Needs Calibration) [ ] Last Calibration Date (Extensometer 1) --- GROUND CONDITION CHANGES --- [ ] Describe Observed Changes [ ] Estimated Crack Width (mm) [ ] Date of Observed Change [ ] Change Severity (Minor, Moderate, Significant, Critical) [ ] Potential Causes (Select all that apply) (Blasting, Water Ingress, Ground Settlement, Equipment Vibration, Geological Feature) [ ] Attach Photos/Videos of Changes --- SCALING & MUCKING --- [ ] Scaling Volume (m³) [ ] Mucking Volume (m³) [ ] Rock Type Scaled/Mucked (Shale, Sandstone, Limestone, Granite, Other) [ ] Description of Scaling/Mucking Activities [ ] Equipment Used (Hydraulic Rock Breaker, Manual, Other) [ ] Date of Scaling/Mucking --- SUPPORT INSTALLATION VERIFICATION --- [ ] Bolt Length Installed (m) [ ] Cable Diameter Installed (mm) [ ] Mesh Spacing (mm) [ ] Bolt Type Verified? (Yes, No, N/A) [ ] Cable Bolt Tension Verified? (Yes, No, N/A) [ ] Support Method Confirmation (Rock Bolts, Cable Bolts, Mesh, Shotcrete, Other) [ ] Comments/Observations on Installation --- WATER INGRESS --- [ ] Water Flow Rate (L/s) [ ] Water Source Identified? (Surface Water, Groundwater, Unknown) [ ] Description of Water Ingress Location [ ] Date of Initial Observation [ ] Time of Initial Observation [ ] Description of Water Quality (e.g., colour, odour) [ ] Photo/Video Evidence --- RECOMMENDATIONS & ACTIONS --- [ ] Detailed Description of Recommended Action [ ] Priority Level (1-5, 1=Highest) [ ] Target Completion Date [ ] Responsible Party (Mining Engineer, Ground Control Specialist, Production Supervisor, Maintenance Team) [ ] Supporting Documentation Required (Engineering Drawings, Material Certificates, Cost Estimates, Risk Assessment) [ ] Authorized Signatory --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mining-management/mining-ground-control-checklist (Click "Install Template" to launch your digital inspection tool immediately)