MINING SURVEY AND MAPPING CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-SURVEY PLANNING & PREPARATION --- [ ] Survey Planned Start Date [ ] Survey Planned Completion Date [ ] Estimated Time Required for Survey [ ] Number of Surveyors Required [ ] Survey Type (e.g., Topo, Volume, Grade) (Topographic, Volume Calculation, Grade Control, Other) [ ] Area to be Surveyed (Surface, Underground, Both) [ ] Specific Survey Objectives & Scope [ ] Existing Site Plans or Drawings (if applicable) --- CONTROL POINT VERIFICATION --- [ ] Control Point ID [ ] Northing (m) [ ] Easting (m) [ ] Elevation (m) [ ] Verification Method (Independent Traverse, GPS/GNSS, Comparison with Existing Data) [ ] Observed Northing Deviation (m) [ ] Observed Easting Deviation (m) [ ] Observed Elevation Deviation (m) [ ] Status (Acceptable, Marginal, Unacceptable) [ ] Comments / Remedial Actions --- DATA ACQUISITION – GROUND SURVEYS --- [ ] Total Station Accuracy (mm) [ ] Level Accuracy (mm) [ ] Start Time of Survey [ ] Date of Survey [ ] Survey Method Used (e.g., Traverse, Radiation) (Traverse, Radiation, Resection) [ ] Location of Survey Point [ ] Instrument Technician Name --- DATA ACQUISITION – AERIAL/DRONE SURVEYS --- [ ] Flight Date [ ] Flight Start Time [ ] Drone Flight Hours [ ] Weather Conditions (Clear, Partly Cloudy, Overcast, Foggy) [ ] Ground Control Point (GCP) Count [ ] GCP Quality Check Passed? (Position, Visibility, Accuracy) [ ] Flight Path/Mission Plan (PDF) [ ] Primary Flight Area Coordinates --- DATA PROCESSING & ADJUSTMENT --- [ ] Total Station Angle Variance (seconds) [ ] Total Station Distance Variance (mm) [ ] Datum Transformation Applied? (Yes, No) [ ] Details of Datum Transformation (if applicable) [ ] Error Ellipse Assessment Completed? (Yes, No) [ ] Description of Error Ellipse Assessment [ ] Processed Data File --- SURFACE MAPPING AND MODELING --- [ ] Northing Coordinate (m) [ ] Easting Coordinate (m) [ ] Date of Survey [ ] Time of Survey [ ] Mapping Method (Total Station, GPS/GNSS, Laser Scanning) [ ] Raw Survey Data (e.g., .tsp, .las) [ ] Notes on Surface Conditions [ ] Model Accuracy Requirement (High, Medium, Low) --- UNDERGROUND MAPPING & VOLUMETRIC CALCULATIONS --- [ ] Station Number [ ] Northing (m) [ ] Easting (m) [ ] Elevation (m) [ ] Mapping Method (Laser Scan, Sketch, Tachymetry) [ ] Distance Measured (m) [ ] Angle Measured (degrees) [ ] Notes/Observations --- DATUM AND COORDINATE SYSTEM CONSISTENCY --- [ ] Primary Datum Used (UTM, MGA, Other (Specify)) [ ] Coordinate System Zone (55, 56, Other (Specify)) [ ] Datum Transformation Parameters (if applicable) [ ] Explanation of Coordinate System Application [ ] Accuracy Standard (meters) [ ] Verification Method (Check against known points, Software validation, Independent review) --- REPORTING & DOCUMENTATION --- [ ] Summary of Survey Findings [ ] Date of Report Completion [ ] Report Version Number [ ] Report Distribution Method (Email, Hard Copy, etc.) (Email, Hard Copy, Shared Drive) [ ] Attachment: Survey Accuracy Report [ ] Surveyor Signature --- DATA SECURITY & STORAGE --- [ ] Data Encryption Method (AES-256, RSA, Other (Specify)) [ ] Data Backup Frequency (Days) [ ] Backup Storage Location (On-site Server, Cloud Storage, Off-site Server) [ ] Details of Access Control Measures [ ] Data Retention Policy Status (Compliant, Non-Compliant, Under Review) [ ] Last Security Audit Date --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mining-management/mining-survey-and-mapping-checklist (Click "Install Template" to launch your digital inspection tool immediately)