MRP INTEGRATION TESTING CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- DATA MAPPING & TRANSFORMATION --- [ ] Source System Field Mapping (Item Master, BOM, Routing, Work Order) [ ] Target System Field Mapping (Item Code, Description, Unit of Measure, Cost) [ ] Decimal Precision [ ] Data Transformation Rules [ ] Data Type Conversion (String to Number, Number to Date, Date to String) [ ] Field Length Validation --- SYSTEM INTERFACE VALIDATION --- [ ] Interface Response Time (seconds) [ ] Observed Error Messages [ ] Data Transmission Method (e.g., API, File Transfer) (API, File Transfer (SFTP), Database Link) [ ] Date of Interface Test [ ] Detailed Steps for Reproducing Issues (if any) [ ] Interface Status (Pass/Fail) (Pass, Fail) --- REAL-TIME DATA SYNCHRONIZATION --- [ ] Synchronization Frequency (minutes) [ ] Last Successful Sync Time [ ] Last Sync Attempt Date [ ] Number of Records Synced [ ] Synchronization Log (Snippet) [ ] Synchronization Method (API, Message Queue, Direct Database Link) --- TRANSACTION VALIDATION --- [ ] Purchase Order Quantity [ ] Sales Order Quantity [ ] Order Date [ ] Ship Date [ ] Inventory Level After Transaction [ ] Transaction Status (Success/Failure) (Success, Failure) [ ] Transaction Error Message (if applicable) --- ERROR HANDLING & RECOVERY --- [ ] Describe Error Scenario [ ] Error Code Received (if applicable) [ ] Error Message Logged [ ] Error Type (e.g., Connectivity, Data Validation) (Connectivity, Data Validation, System Timeout, Other) [ ] Date of Error Occurrence [ ] Time of Error Occurrence [ ] Recovery Steps Taken [ ] Recovery Successful? (Yes, No) --- SECURITY & ACCESS CONTROL --- [ ] User Authentication Method (Username/Password, Active Directory, Single Sign-On (SSO)) [ ] Data Encryption in Transit (TLS 1.2 or higher, SSL 3.0, Not Encrypted) [ ] Data Encryption at Rest (Enabled, Disabled) [ ] Maximum Login Attempts [ ] Role-Based Access Control (RBAC) Implemented? (Yes, No) [ ] Access Permissions Verified? (Read, Write, Delete, Execute) --- PERFORMANCE TESTING --- [ ] Simulated Users [ ] Transaction Volume (per minute) [ ] Average Response Time (seconds) [ ] Peak Response Time (seconds) [ ] Error Rate (%) [ ] Test Execution Date [ ] Test Start Time --- USER ACCEPTANCE TESTING (UAT) --- [ ] Describe the business process being tested. [ ] Quantity of items processed during test. [ ] Date of UAT execution. [ ] Time of UAT execution. [ ] Overall Test Result (Pass/Fail) (Pass, Fail) [ ] Detailed observations and issues encountered. [ ] Tester Signature --- LOGGING AND AUDITING --- [ ] Log Rotation Frequency (Days) [ ] Audit Trail Data Retention Policy (30 Days, 60 Days, 90 Days, Custom (Specify in Long Text)) [ ] Custom Audit Trail Retention Details (if 'Custom' selected above) [ ] Audit Log Events to Track (User Login/Logout, Data Creation, Data Modification, Data Deletion, System Errors, Integration Events) [ ] Last Audit Log Review Date [ ] Time Zone of Audit Logs --- DOCUMENTATION REVIEW --- [ ] Review Integration Design Document [ ] Upload Data Mapping Specification [ ] Verify API Documentation Accuracy (Accurate, Needs Revision, Not Available) [ ] Document Last Updated Date [ ] Summarize Findings & Recommendations --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mrp/mrp-integration-testing-checklist (Click "Install Template" to launch your digital inspection tool immediately)