MRP PLANNING PARAMETER SETUP CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- LOT SIZING METHODS --- [ ] Lot Sizing Method for Item A (Fixed, Periodic, Minimum/Maximum, None) [ ] Lot Sizing Method for Item B (Fixed, Periodic, Minimum/Maximum, None) [ ] Minimum Order Quantity (MOQ) for Item C [ ] Maximum Order Quantity for Item D [ ] Reason for Choosing Lot Sizing Method for Item E --- LEAD TIMES --- [ ] Procurement Lead Time (Days) [ ] Manufacturing Lead Time (Days) [ ] Inspection Lead Time (Days) [ ] Date Lead Times Last Updated [ ] Notes on Lead Time Variability [ ] Lead Time Source (e.g., Supplier, Historical Data) (Supplier Quote, Historical Data, Engineering Estimate) [ ] Transit Time (Days) --- SAFETY STOCK LEVELS --- [ ] Item Code [ ] Current Safety Stock Level [ ] Calculated Safety Stock Level [ ] Service Level (%) [ ] Safety Stock Calculation Method [ ] Demand Variability (σ) [ ] Lead Time Variability (σ) [ ] Review Period (Daily, Weekly, Monthly) [ ] Notes/Justification for Adjustment --- PLANNING HORIZON --- [ ] Minimum Planning Horizon (Days/Weeks/Months) [ ] Maximum Planning Horizon (Days/Weeks/Months) [ ] Planning Horizon Unit (Days, Weeks, Months) [ ] Justification for Chosen Horizon [ ] Last Review Date of Planning Horizon [ ] Considerations for Future Horizon Extension --- SCHEDULING PARAMETERS --- [ ] Finite Scheduling Capacity Factor [ ] Scheduling Method (Forward, Backward) [ ] Setup Time Multiplier [ ] Next Capacity Review Date [ ] Constraint Types Applied (Resource, Time, Material) [ ] Maximum Work Center Overload (%) --- WORK CENTERS AND ROUTING --- [ ] Work Center Code [ ] Work Center Description [ ] Standard Labor Hours per Unit [ ] Setup Time (Minutes) [ ] Machine Capacity (Units per Hour) [ ] Routing Type (e.g., Assembly, Fabrication) (Assembly, Fabrication, Machining, Finishing) [ ] Required Resources (Labor, Machine, Tools) --- ITEM MASTER DATA INTEGRATION --- [ ] Data Source System (ERP System, CRM System, Spreadsheet, Other) [ ] Record Count Mismatch Threshold [ ] Data Mapping Document Link [ ] Last Data Synchronization Date [ ] Synchronization Method (Real-time, Scheduled Batch, Manual) [ ] Error Logs Review Notes --- BOM (BILL OF MATERIALS) ACCURACY --- [ ] BOM Description Review Notes [ ] Effective Date (YYYYMMDD) [ ] BOM Status (Active, Inactive, Draft) (Active, Inactive, Draft) [ ] Quantity per Assembly [ ] BOM Version [ ] Attach Approved BOM Document --- UNIT OF MEASURE (UOM) --- [ ] Default UOM for Item X (Each, Pound, Kilogram, Box, Roll) [ ] Conversion Factor (Base UOM to Secondary UOM) [ ] Base Unit of Measure for Item Y (Feet, Meters, Inches) [ ] Notes on UOM Consistency [ ] UOM Rounding Rules (Rounding to Nearest Whole Number, No Rounding) --- PLANNING TYPES AND STRATEGIES --- [ ] Planning Type (Make-to-Stock (MTS), Make-to-Order (MTO), Engineer-to-Order (ETO), Assemble-to-Order (ATO)) [ ] Planning Horizon (Weeks) [ ] Planning Strategies Applied (Demand Forecasting, Capacity Planning, Rough-Cut Capacity Planning) [ ] Strategy Justification [ ] Strategy Implementation Date --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mrp/mrp-planning-parameter-setup-checklist (Click "Install Template" to launch your digital inspection tool immediately)