MRP PRODUCTION PLANNING CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- DEMAND FORECASTING & REVIEW --- [ ] Forecast Accuracy (MAPE) [ ] Description of Forecasting Methodology [ ] Last Forecast Review Date [ ] Forecasting Method Used (Statistical, Sales Team Input, Market Research) [ ] Key Assumptions Driving Forecast [ ] Forecast Bias (Average Error) --- BILL OF MATERIALS (BOM) VERIFICATION --- [ ] Item Number [ ] Item Description [ ] BOM Version [ ] Notes/Comments (e.g., changes, concerns) [ ] Quantity per Assembly [ ] Last BOM Update Date [ ] BOM Status (Active/Inactive) (Active, Inactive) [ ] Attach Updated BOM Document (if applicable) --- INVENTORY LEVELS & SAFETY STOCK --- [ ] Current Raw Material Inventory Level (Units) [ ] Safety Stock Level for Key Material A (Units) [ ] Safety Stock Calculation Method (e.g., Statistical, Rule-Based) [ ] Justification for Current Safety Stock Levels [ ] Inventory Valuation Method (e.g., FIFO, Weighted Average) (FIFO, Weighted Average) [ ] Obsolescence Rate for Material B (%) [ ] Last Safety Stock Review Date --- LEAD TIME MANAGEMENT --- [ ] Supplier Lead Time (Days) [ ] Internal Processing Time (Hours) [ ] Material Handling Time (Hours) [ ] Last Lead Time Review Date [ ] Notes on Lead Time Fluctuations [ ] Lead Time Source (e.g., Supplier Quote, Historical Data) (Supplier Quote, Historical Data, Engineering Estimate) [ ] Transportation Lead Time (Days) --- CAPACITY PLANNING --- [ ] Maximum Machine Capacity (Units/Hour) [ ] Current Machine Utilization (%) [ ] Planned Production Volume (Units) [ ] Date of Capacity Assessment [ ] Notes on Potential Bottlenecks [ ] Resources Requiring Additional Capacity? (Labor, Equipment, Materials, Space) [ ] Available Labor Hours per Week --- MATERIAL REQUIREMENTS PLANNING (MRP) RUN & REVIEW --- [ ] MRP Run Date [ ] MRP Run Duration (minutes) [ ] MRP Planning Horizon (Days) (30 Days, 60 Days, 90 Days, Custom) [ ] Total Planned Purchase Orders [ ] Total Planned Production Orders [ ] Summary of Planned Order Changes (vs. previous run) [ ] MRP Exception Types Encountered (Insufficient Capacity, Material Shortage, BOM Discrepancy, Routing Issue, None) [ ] Comments/Notes Regarding MRP Run --- SHOP FLOOR CONTROL INTEGRATION --- [ ] Real-Time Data Sync Frequency (minutes) [ ] Shop Floor System Used (MES, ERP Integrated, Manual Data Entry, Custom System) [ ] Describe Data Exchange Methods [ ] Last Data Integration Validation Date [ ] Data Points Integrated (Select all that apply) (Work Order Status, Material Consumption, Labor Hours, Machine Status, Production Quantity) [ ] Contact Person for Integration Support --- EXCEPTION HANDLING & REPORTING --- [ ] Description of Exception [ ] Exception Quantity Variance [ ] Date of Exception Occurrence [ ] Exception Type (e.g., Material Shortage, Capacity Overload) (Material Shortage, Capacity Overload, BOM Discrepancy, Routing Issue, Data Error) [ ] Impacted Areas (Check all that apply) (Production, Inventory, Delivery, Sales) [ ] Corrective Actions Taken [ ] Date Corrective Action Completed [ ] Authorized Sign-Off --- DATA ACCURACY & VALIDATION --- [ ] BOM Accuracy Percentage [ ] Lead Time Accuracy Percentage [ ] Inventory Record Accuracy (%) [ ] Description of Data Validation Methods Used [ ] Data Sources Verified (ERP System, Supplier Data, Customer Orders, Engineering Drawings) [ ] Date of Last Data Validation Audit [ ] Summary of Data Validation Findings & Corrective Actions --- SYSTEM CONFIGURATION & MAINTENANCE --- [ ] MRP System Version [ ] Last System Backup Date [ ] Description of Recent System Updates [ ] Scheduled Backup Frequency (Days) [ ] Modules Currently Active (Inventory Management, Production Planning, Sales & Order Management, Purchasing) [ ] Next Scheduled System Maintenance Date --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mrp/mrp-production-planning-checklist (Click "Install Template" to launch your digital inspection tool immediately)