MRP SYSTEM DOCUMENTATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- SYSTEM OVERVIEW --- [ ] System Purpose and Scope [ ] MRP System Version [ ] Deployment Type (Cloud/On-Premise) (Cloud, On-Premise) [ ] Integrated Systems (ERP, CRM, WMS, SCM) [ ] Implementation Date --- MASTER DATA DEFINITIONS --- [ ] Item Master Description [ ] Item Cost [ ] UOM (Unit of Measure) (Each, Box, Pallet) [ ] Safety Stock Level [ ] Last Updated Date [ ] BOM (Bill of Materials) Notes [ ] Routing Lead Time --- CONFIGURATION SETTINGS --- [ ] Safety Stock Calculation Method [ ] Lead Time Offset (Days) [ ] Planning Horizon (Weeks) (4, 8, 12, 24) [ ] Lot Size Calculation Rule [ ] Demand Forecasting Techniques (Moving Average, Exponential Smoothing, Regression Analysis) [ ] Last Configuration Review Date --- PROCESS FLOWS --- [ ] Describe the Demand Planning Process [ ] Which departments are involved in Production Order Release? (Sales, Planning, Finance, Production) [ ] Lead Time for Production Order Approval (Days) [ ] Date of Last Review of Material Requirements Plan [ ] Describe the Procurement Process for Raw Materials [ ] Who approves vendor selection? (Procurement Manager, Finance Director) --- USER MANUALS --- [ ] Navigating the Main Dashboard [ ] Creating a New Purchase Order [ ] Maximum Order Quantity Allowed [ ] Selecting Default Warehouse (Warehouse A, Warehouse B, Warehouse C) [ ] Generating MRP Reports [ ] Last MRP Report Generation Date --- SYSTEM INTERFACE GUIDES --- [ ] Interface Description [ ] Connected System (ERP System, CRM System, WMS System, eCommerce Platform) [ ] Data Mapping Document [ ] API Endpoint URL [ ] Data Transformation Rules [ ] Last Integration Test Date --- SECURITY PROTOCOLS --- [ ] Description of User Access Control Policies [ ] Authentication Methods Supported (Username/Password, Multi-Factor Authentication, Single Sign-On (SSO), Biometrics) [ ] Maximum Password Length [ ] Last Password Policy Review Date [ ] Role-Based Access Control (RBAC) Implementation Status (Implemented, Partially Implemented, Not Implemented) [ ] Security Audit Reports --- TROUBLESHOOTING GUIDE --- [ ] Error Message Observed [ ] Error Code (if applicable) [ ] Module Affected (Planning, Procurement, Production, Inventory, Other) [ ] Date of Occurrence [ ] Time of Occurrence [ ] User Involved (if applicable) [ ] Possible Causes (Select all that apply) (Data Entry Error, System Configuration Issue, Integration Problem, Hardware Failure, Software Bug) [ ] Steps Taken to Resolve --- RELEASE NOTES --- [ ] Release Version [ ] Release Date [ ] Summary of Changes [ ] Detailed Changelog [ ] Release Package (Optional) [ ] Modules Affected (Planning, Procurement, Production, Inventory, Sales) [ ] Author/Release Manager --- DISASTER RECOVERY PLAN --- [ ] Last Backup Date [ ] Estimated Recovery Time (RTO) [ ] Maximum Acceptable Data Loss (RPO) [ ] Backup Location Description [ ] Critical Systems to Restore (Production Planning, Inventory Management, Procurement, Sales Order Management) [ ] Detailed Restoration Steps [ ] Alternate Data Center Location [ ] Backup Verification Report --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mrp/mrp-system-documentation-checklist (Click "Install Template" to launch your digital inspection tool immediately)