MRP WAREHOUSE SLOTTING AND LAYOUT OPTIMIZATION CHECKLIST 2026 Created by ChecklistGuro (https://checklistguro.com) --- INVENTORY PROFILE ANALYSIS --- [ ] SKU Classification Category (A-Items (High Velocity), B-Items (Medium Velocity), C-Items (Low Velocity)) [ ] Average Monthly Throughput (Units) [ ] Physical Characteristics Analysis [ ] Current Inventory Velocity Report [ ] Data Extraction Date --- STORAGE ZONE CONFIGURATION --- [ ] Identified Storage Zone Types (Fast-Moving (Zone A), Medium-Moving (Zone B), Slow-Moving (Zone C), Bulk/Reserve Storage, Hazardous Materials Area, Cross-Docking Station) [ ] Zone Assignment Logic [ ] Allocated Square Footage per Zone [ ] Capacity Constraint Observations [ ] Updated Warehouse Heat Map/Layout Diagram [ ] Warehouse Manager Approval --- ACCESSIBILITY AND PICKING PATH OPTIMIZATION --- [ ] Identified Bottleneck Areas (Aisle Congestion, High-Traffic Intersections, Inadequate Staging Space, Dead-end Aisles) [ ] Current Average Travel Distance (Meters) [ ] Picking Strategy Type (Zone Picking, Batch Picking, Wave Picking, Discrete Order Picking) [ ] Proposed Route Optimization Plan [ ] Updated Warehouse Map/Layout Diagram [ ] Warehouse Manager Approval --- EQUIPMENT AND INFRASTRUCTURE READINESS --- [ ] Equipment Inspection Checklist (Forklift/Reach Truck Battery & Maintenance Check, Conveyor Belt & Sensor Functionality, Handheld Scanner/RF Terminal Connectivity, Racking Integrity & Stability Audit, Automated Storage and Retrieval System (AS/RS) Calibration) [ ] Racking Load Capacity Status (Fully Compliant, Requires Maintenance, Action Required/Immediate Repair) [ ] Aisle Clearance Width (cm) [ ] Equipment Maintenance Logs [ ] Last Equipment Safety Inspection Date [ ] Warehouse Floor Manager Approval --- SAFETY AND COMPLIANCE VERIFICATION --- [ ] Safety Inspection Completed Items (Fire Extinguisher Accessibility Check, Emergency Exit Path Clearance, Racking Load Capacity Verification, Hazardous Material Segregation, Aisle Lighting and Visibility Check) [ ] Last Safety Audit Date [ ] Compliance Status (Compliant, Non-Compliant, Requires Immediate Action) [ ] Identified Safety Risks and Mitigation Plan [ ] Safety Certificate or Inspection Report [ ] Safety Officer Approval --- RESOURCE AND LABOR ALIGNMENT --- [ ] Staffing Level Adequacy (Sufficient, At Risk, Understaffed) [ ] Required Training Hours per Operator [ ] Training Competencies Verified (New Bin Location Navigation, Equipment Safety Protocols, Updated Scanning Procedures, Emergency Exit Awareness) [ ] Labor Gap Analysis & Mitigation Plan [ ] Warehouse Manager Approval --- MRP SYSTEM SYNCHRONIZATION --- [ ] Data Sync Completion Date [ ] Synchronization Status (Pending, In Progress, Completed, Failed/Error) [ ] Updated Master Data Modules (Bin Locations, SKU Dimensions/Weight, Stock Levels, Lead Times, Safety Stock Levels) [ ] Discrepancy Notes [ ] Validation Report Upload [ ] Data Controller Verification --- POST-IMPLEMENTATION PERFORMANCE METRICS --- [ ] Order Cycle Time Reduction (%) [ ] Average Travel Distance per Pick (Meters) [ ] Pick Accuracy Rate Achievement (Exceeded Target, Met Target, Below Target) [ ] Discrepancy Observations [ ] Audit Completion Date [ ] Warehouse Manager Approval --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/mrp/mrp-warehouse-slotting-and-layout-optimization-checklist-2026 (Click "Install Template" to launch your digital inspection tool immediately)