POST-TENSIONING CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-TENSIONING DESIGN & PLANNING --- [ ] Design Post-Tensioning Force (kips) [ ] Design Post-Tensioning Stress (psi) [ ] Summary of Design Assumptions [ ] Design Calculations [ ] Design Code Used (ACI 318, Other (Specify in LONG_TEXT)) [ ] Date of Design Review Completion [ ] Notes from Design Review (if any) [ ] Design Approved? (Yes, No) [ ] Approver Name (if approved) --- MATERIAL INSPECTION & HANDLING --- [ ] Tendons Lot Number(s) [ ] Manufacturer's Certificate Review - Summary of Findings [ ] Number of Tendons Received [ ] Number of Anchor Plates Received [ ] Visual Inspection of Tendons (Select all that apply) (Rust, Damage, Corrosion, Clean, Other) [ ] Grout Material Type Received (Cementitious, Non-Shrink, Polymer-Modified, Other) [ ] Upload Photos of Received Materials (if any issues found) [ ] Notes/Comments regarding material condition. --- SHEATHING & FORMWORK --- [ ] Sheathing Thickness (inches) [ ] Formwork Deflection Limit (inches) [ ] Sheathing Material Type (Plywood, OSB, Composite, Other (specify)) [ ] Describe Formwork System & Support [ ] Formwork Condition (Good, Fair, Poor) [ ] Sheathing & Formwork Defects Observed? (Cracks, Borer Holes, Loose Fasteners, Warping, None) [ ] If defects observed, describe in detail [ ] Date of Formwork Inspection [ ] Inspector Signature --- TENDONS PLACEMENT & STRESSING --- [ ] Tendons Total Number Verified? [ ] Tendons Orientation Correct? (Yes, No, NA) [ ] Tendon Diameter Verified (inches)? [ ] Tendons Placement Location Verified? [ ] Stage 1 Stressed Force (kips)? [ ] Stage 1 Measured Extension (inches)? [ ] Stage 2 Stressed Force (kips)? [ ] Stage 2 Measured Extension (inches)? [ ] Stressing Completion Date [ ] Stressing Notes and Observations --- ANCHOR PLATE & ANCHORAGE INSPECTION --- [ ] Anchor Plate Identification Number [ ] Anchor Plate Condition (Visual) (Good, Fair, Poor) [ ] Anchor Bolt Torque (kN·m) [ ] Anchor Bolt Condition (Correct, Damaged, Missing) [ ] Description of any Anchor Bolt Issues [ ] Anchor Plate Alignment (mm) [ ] Photograph of Anchor Plate & Anchorage [ ] Corrosion on Anchor Plate (None, Minor, Moderate, Severe) [ ] Details regarding any corrosion found. --- GROUTING --- [ ] Grout Mix Water/Cement Ratio [ ] Grout Slump (if applicable) [ ] Grout Type (Non-Shrink Cementitious Grout, Epoxy Grout, Polyurethane Grout, Other (Specify)) [ ] Grout Batching Record Details (Batch Number, Date, Time, etc.) [ ] Grout Air Voids Test Results (Select all that apply) (Pass, Fail, Not Performed) [ ] Grouting Start Date [ ] Grouting Start Time [ ] Description of Grouting Procedure Followed [ ] Grout Test Results (e.g., Compression Strength) [ ] Grouting Completion Status (Complete, In Progress, Not Started) --- POST-GROUTING INSPECTION & TESTING --- [ ] Date of Post-Grouting Inspection [ ] Start Time of Post-Grouting Inspection [ ] Ambient Temperature (°C) [ ] Grout Temperature (°C) - Initial [ ] Grout Temperature (°C) - Final [ ] Grout Pressure during Placement (psi) (Within Specification, Out of Specification - Documented) [ ] Visual Inspection Findings (Select all that apply) (No Air Voids Observed, Air Voids Observed - Documented, Grout Segregation Observed, Leakage Observed, No Surface Defects, Surface Defects Observed - Documented) [ ] Detailed Observations and Comments (Any anomalies, corrections, or concerns) [ ] Photographs of Post-Grouting Activities [ ] Overall Assessment (Acceptable, Unacceptable - Requires Remedial Action) --- DOCUMENTATION & RECORD KEEPING --- [ ] Design Calculations & Drawings [ ] Record of Design Review Comments & Resolutions [ ] Date of Stressing Operation [ ] Maximum Tendon Stress Reached (psi) [ ] Description of Any Deviations from Approved Procedures [ ] Quality Control Personnel Present During Stressing (Project Engineer, Post-Tensioning Foreman, Third-Party Inspector, Other (Specify)) [ ] Details of Any Re-stressing Operations [ ] Grout Test Results (Slump, Air Content, etc.) [ ] Post-Tensioning Supervisor Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/post-tensioning-checklist (Click "Install Template" to launch your digital inspection tool immediately)