PRE-DEMOLITION SITE ASSESSMENT & SAFETY CHECKLIST 2026 Created by ChecklistGuro (https://checklistguro.com) --- PRE-DEMOLITION SITE SURVEY & STRUCTURAL ASSESSMENT --- [ ] Inspection Date [ ] Structure/Building Address [ ] Building Construction Type (Steel Frame, Reinforced Concrete, Masonry/Brick, Timber/Wood Frame, Other) [ ] Identified Structural Risks (Visible Cracks in Foundation, Compromised Load-Bearing Walls, Roof/Ceiling Instability, Subsidence or Ground Movement, Damage to Adjacent Structures) [ ] Detailed Assessment Findings [ ] Structural Survey Photos & Reports [ ] Structural Engineer/Lead Inspector Signature --- HAZARDOUS MATERIALS & ENVIRONMENTAL SURVEY --- [ ] Survey Completion Date [ ] Identified Hazardous Materials (Asbestos, Lead-Based Paint, Polychlorinated Biphenyls (PCBs), Mercury/Thermometers, Mold/Fungi, Uranium/Radioactive Materials, Other Regulated Substances) [ ] Detailed Findings & Observations [ ] Hazardous Material Survey Report (PDF/Image) [ ] Remediation Requirement Status (No Remediation Required, Remediation Required Before Demolition, Remediation In-Progress) [ ] Environmental Inspector Signature --- UTILITY DISCONNECTION & ISOLATION VERIFICATION --- [ ] Date of Utility Disconnection Inspection [ ] Utilities Verified as Disconnected (Electricity, Natural Gas, Water Supply, Sewer/Sanitary Lines, Telecommunications/Fiber, Compressed Gas/Oxygen) [ ] Gas Meter/Service Shut-off Confirmation Number [ ] Notes on Specific Isolation Procedures or Remaining Active Lines [ ] Utility Disconnection Certificates/Permits [ ] Site Supervisor Verification --- SITE SECURITY & PERIMETER CONTROL --- [ ] Perimeter Fencing Status (Fully Installed & Secure, Installed with Gaps, Not Installed) [ ] Security Measures Implemented (Temporary Fencing, Security Cameras/CCTV, Motion Sensor Lighting, Security Guard/Patrol, Warning Signage, Site Access Gates) [ ] Identified Security Gaps [ ] Site Perimeter Photo Evidence [ ] Safety Officer Verification --- DUST, NOISE, AND VIBRATION MITIGATION --- [ ] Dust Suppression Method Implemented (Water Spray/Mist System, Debris Enclosure/Containment, Air Scrubbers/HEPA Filtration, Street Sweeping Schedule) [ ] Noise Mitigation Measures in Place (Acoustic Barriers/Sound Blankets, Quiet-Mode Equipment Settings, Limited Working Hours Compliance, Engine Muffler Inspections) [ ] Measured Vibration Level (mm/s) [ ] Mitigation Strategy Deviations [ ] Dust/Noise Monitoring Log [ ] Safety Officer Verification --- EROSION AND SEDIMENT CONTROL COMPLIANCE --- [ ] Silt Fence Integrity Status (Intact and Functional, Damaged/Needs Repair, Not Installed) [ ] Installed Erosion Control Measures (Silt Fences, Inlet Protection, Straw Wattles, Sediment Basins, Stabilized Construction Entrance, Dust Control Sprayers) [ ] Identified Erosion Risks or Weak Points [ ] Erosion Control Site Photos [ ] Inspection Date [ ] Site Inspector Verification --- WASTE MANAGEMENT & DEBRIS DISPOSAL PLAN --- [ ] Debris Removal Start Date [ ] Primary Waste Disposal Method (On-site Sorting & Recycling, , Third-party Hauling Service) [ ] Types of Waste to be Removed (Concrete & Masonry, Metal & Scrap, Wood & Timber, Hazardous Materials, General Construction Debris) [ ] Estimated Total Waste Volume (Tons/Cubic Yards) [ ] Waste Disposal Manifest/Permit Upload [ ] Special Disposal Instructions --- OCCUPANT & NEIGHBOR COMMUNICATION --- [ ] Notification Date Sent [ ] Stakeholders Notified (Adjacent Property Owners, Local Municipal Authorities, Local Residents/Tenants, Local Utility Companies, Emergency Services (Police/Fire)) [ ] Summary of Communication Log [ ] Proof of Notification (Letters/Emails/Posters) [ ] Site Manager Verification --- EMERGENCY RESPONSE & SAFETY EQUIPMENT --- [ ] Fire Extinguisher Inspection Status (Fully Compliant, Action Required, Missing/Deficient) [ ] Safety Equipment Present on Site (First Aid Kits, Eye Wash Stations, Emergency Eyewash Station, AED (Automated External Defibrillator), Spill Kits, Emergency Communication Radios) [ ] Last Safety Equipment Audit Date [ ] Identified Safety Risks or Equipment Deficiencies [ ] Safety Inspection Certificate/Photos [ ] Safety Officer Verification --- REGULATORY PERMITS & LEGAL DOCUMENTATION --- [ ] Permit Issuance Date [ ] Demolition Permit Status (Approved, Pending, Not Started, Expired) [ ] Digital Copy of Approved Permits [ ] Required Regulatory Approvals Obtained (Environmental Agency Clearance, Local Building Department Permit, Utility Disconnection Certificate, Traffic/Street Closure Permit, Asbestos Clearance Certificate) [ ] Permit Reference Number [ ] Compliance Officer Verification --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/pre-demolition-site-assessment-safety-checklist-2026 (Click "Install Template" to launch your digital inspection tool immediately)