PRESSURE EQUIPMENT INTEGRITY CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- DESIGN & ENGINEERING REVIEW --- [ ] Design Code Compliance (e.g., ASME, EN, etc.) (ASME, EN, Other (Specify in Long Text)) [ ] Detailed Description of Design Basis [ ] Maximum Allowable Pressure (psig/bar) [ ] Maximum Allowable Temperature (°C/°F) [ ] Design Calculations (e.g., Stress Analysis Reports) [ ] Design Verification Method (Calculations, Finite Element Analysis (FEA), Vendor Data, Other (Specify in Long Text)) [ ] Date of Last Design Review [ ] Summary of Key Design Assumptions --- MATERIALS SELECTION & TRACEABILITY --- [ ] Material Specification Adherence (Compliant, Non-Compliant, Not Applicable) [ ] Detailed Material Specification Description [ ] Material Test Certificates (MTCs) [ ] Material Heat Number [ ] Traceability Records Description [ ] Material Certification Status (Certified, Uncertified, N/A) [ ] Date of Material Receipt --- FABRICATION & WELDING --- [ ] Welder Qualification Expiration Date (for critical welds) [ ] Welding Procedure Specification (WPS) Verification (Verified & Approved, Verification Required, Not Applicable) [ ] Welding Consumables Traceability Verified? (Yes, No, Not Applicable) [ ] Details of any Welding Repair or Rework [ ] Welder Qualification Records (Sample) [ ] Non-Destructive Examination (NDE) Type Performed (e.g., UT, RT, MT) (Ultrasonic Testing (UT), Radiographic Testing (RT), Magnetic Particle Testing (MT), Dye Penetrant Testing (PT), Visual Inspection, Other (Specify in Long Text)) [ ] Notes regarding NDE results and acceptance criteria --- INSTALLATION & COMMISSIONING --- [ ] Installation Completion Date [ ] Equipment Serial Number [ ] Installation Contractor (Contractor A, Contractor B, Contractor C, Other) [ ] Installation Notes/Observations [ ] Alignment Verification Method (Laser Alignment, String Line, Other) [ ] Alignment Readings (X-axis) [ ] Alignment Readings (Y-axis) [ ] Commissioning Pressure Test Passed? (Yes, No) [ ] Commissioning Test Reports [ ] Deviations from Installation Plan (if any) --- INSPECTION & TESTING (INITIAL) --- [ ] Date of Hydrostatic Test [ ] Hydrostatic Test Pressure (barg) [ ] Hydrostatic Test Duration (minutes) [ ] Hydrostatic Test Results & Observations [ ] Hydrostatic Test Report (PDF) [ ] Material Verification Completed? (Yes, No) [ ] Design Calculations Verified? (Yes, No) [ ] Any Deviations Identified During Initial Inspection? [ ] Date of Visual Inspection --- OPERATING PROCEDURES & TRAINING --- [ ] Describe the documented operating procedures for this equipment. [ ] Which operating procedures cover this equipment? (Select all that apply) (Startup Procedure, Shutdown Procedure, Normal Operation Procedure, Emergency Shutdown Procedure, Pressure Testing Procedure, Draining/Venting Procedure) [ ] Number of personnel trained on the operating procedures for this equipment. [ ] Date of last training refresher for personnel operating this equipment. [ ] Upload copy of training records for personnel. [ ] Training Program Type? (Classroom, Online, On-the-Job) [ ] Briefly describe the competency assessment conducted post-training. [ ] Procedure Revision Control Status? (Up-to-date, Needs Revision) --- RISK BASED INSPECTION (RBI) --- [ ] RBI Program Revision Number [ ] Last RBI Program Review Date [ ] RBI Methodology Used (e.g., API 581, EN 12929) (API 581, EN 12929, Other (Specify in LONG_TEXT)) [ ] Description of Key Risk Factors Considered [ ] Number of Pressure Equipment Items Included in RBI [ ] Inspection Techniques Used Based on Risk (Select All That Apply) (Visual Inspection, UT (Ultrasonic Testing), PT (Pressure Testing), MT (Magnetic Particle Testing), Radiographic Testing, Other (Specify in LONG_TEXT)) [ ] Date of Last RBI Modeling Validation [ ] Summary of Key Findings from RBI Modeling Validation [ ] Number of Pressure Equipment Items Reclassified Due to RBI --- NON-DESTRUCTIVE EXAMINATION (NDE) --- [ ] NDE Personnel Certification Level [ ] NDE Techniques Performed (Select all that apply) (Visual Inspection (VT), Dye Penetrant Testing (PT), Magnetic Particle Testing (MT), Ultrasonic Testing (UT), Radiographic Testing (RT), Leak Testing (LT)) [ ] NDE Procedure References [ ] Last NDE Personnel Qualification Expiration Date [ ] Representative NDE Reports (e.g., UT, RT) [ ] Method Used for Ultrasonic Thickness Measurement (If Applicable) (Manual, Automated (A-Scan), Automated (Phased Array)) [ ] Any Anomalies Found During NDE and Corrective Actions Taken [ ] Calibration Status of NDE Equipment (Within Calibration Period, Out of Calibration) --- MECHANICAL INTEGRITY (MI) PROGRAM --- [ ] Frequency of Visual Inspection (Months) [ ] Last Visual Inspection Date [ ] Summary of Findings from Last Visual Inspection [ ] NDE Techniques Used (e.g., UT, PT, MT, RT) (Ultrasonic Testing (UT), Dye Penetrant Testing (PT), Magnetic Particle Testing (MT), Radiographic Testing (RT), Other (Specify)) [ ] NDE Technician Certification Expiration Date (YYYYMMDD - Provide for each applicable technique) [ ] Condition Monitoring Program Type (Vibration Analysis, Oil Analysis, Temperature Monitoring, Pressure Monitoring, None) [ ] Date of Last Internal Inspection [ ] Description of any Repairs or Remedial Actions Performed Since Last Inspection [ ] Leak Testing Method (Soapy Water, Halogen Leak Detector, Helium, Pressure Decay, None) [ ] MI Program Reviewer Signature --- MANAGEMENT OF CHANGE (MOC) --- [ ] Describe the Proposed Change [ ] Justification for the Change (Why is it needed?) [ ] Type of Change (e.g., Design, Material, Procedure, Operation) (Design Modification, Material Substitution, Operating Procedure Change, Equipment Repair/Replacement, Inspection Technique Change) [ ] Affected Pressure Rating (psi/bar) [ ] Affected Operating Temperature (°C/°F) [ ] Impact on Pressure Equipment Integrity? (No Impact, Minor Impact, Moderate Impact, Significant Impact) [ ] Upload Relevant Drawings/Specifications (if applicable) [ ] Date of MOC Implementation [ ] Reviewer Signature --- RECORD KEEPING & DOCUMENTATION --- [ ] Date of Last Documentation Review [ ] Summary of Record Keeping System Description [ ] Sample of Pressure Equipment Inspection Reports [ ] Number of Pressure Equipment Records Maintained [ ] Record Storage Method (Electronic/Paper/Hybrid) (Electronic, Paper, Hybrid) [ ] Description of Data Backup Procedures [ ] Access Control to Pressure Equipment Records (Open Access, Restricted Access, Role-Based Access) [ ] Date of Last Audit of Record Keeping System --- REGULATORY COMPLIANCE --- [ ] Applicable Pressure Equipment Regulations (ASME Boiler and Pressure Vessel Code, European Pressure Equipment Directive (PED), Local/National Regulations (Specify), Other (Specify)) [ ] Specify 'Other' Regulation (If selected) [ ] Last Inspection Date of Regulatory Documentation [ ] Next Scheduled Regulatory Inspection/Audit [ ] Third-Party Inspection/Certification Required? (Yes, No, N/A) [ ] Upload Regulatory Compliance Documentation (e.g., permits, certificates) [ ] Name of Regulatory Body Contact Person [ ] Permit/Certificate Expiration Date (YYYYMMDD) [ ] Summary of any recent regulatory findings or non-conformances --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/manufacturing/pressure-equipment-integrity-checklist (Click "Install Template" to launch your digital inspection tool immediately)