PREVENTIVE MAINTENANCE OPTIMIZATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- ASSET IDENTIFICATION & PRIORITIZATION --- [ ] Asset Count (Total) [ ] Asset Count (Critical - High Risk) [ ] Asset Count (Critical - Medium Risk) [ ] Asset Count (Non-Critical) [ ] Risk Assessment Methodology Used (FMEA, HAZOP, Bowtie Analysis, Other (Specify)) [ ] Justification for Critical Asset Designation (For Top 5) [ ] Criteria Used for Asset Prioritization (Safety, Production Downtime Impact, Repair Cost, Environmental Impact, Regulatory Compliance) [ ] Asset Register / Inventory List [ ] Date of Last Asset Prioritization Review --- CURRENT PM PROGRAM REVIEW --- [ ] Overall Description of Current PM Program [ ] Total Number of PM Tasks Scheduled [ ] PM Scheduling Method (Time-Based, Meter-Based, etc.) (Time-Based, Meter-Based, Manufacturer Recommendations, Other (Specify)) [ ] Types of PM Tasks Currently Performed (Select all that apply) (Lubrication, Inspection, Cleaning, Calibration, Replacement of Consumables, Testing, Other (Specify)) [ ] Average Downtime per Equipment Failure (Hours) [ ] Method for tracking PM Completion (CMMS, Spreadsheet, Paper Records, Other (Specify)) [ ] List equipment with PM frequency exceeding manufacturer recommendations and reason --- DATA COLLECTION & ANALYSIS --- [ ] Average MTBF (Mean Time Between Failures) for Critical Assets [ ] Average MTTR (Mean Time To Repair) for Critical Assets [ ] Total Maintenance Costs (Labor + Materials) per Year [ ] Summary of Recent Failure Analysis Reports [ ] Condition Monitoring Technologies Currently Used (e.g., Vibration Analysis, Infrared Thermography) (Vibration Analysis, Infrared Thermography, Oil Analysis, Ultrasonic Testing, None) [ ] Date of Last Comprehensive Equipment Performance Review [ ] Data Sources Currently Used for Maintenance Information (CMMS (Computerized Maintenance Management System), Work Order Records, Equipment Logs, Operator Reports, External Supplier Data) [ ] Upload Historical Work Order Data (CSV or Excel) --- TASK OPTIMIZATION & MODIFICATION --- [ ] Is the current PM task truly preventative, or mostly reactive? (Preventative, Reactive, Unsure) [ ] Current PM Frequency (e.g., days, weeks, months) [ ] Recommended PM Frequency (based on analysis) [ ] Justification for frequency change (if applicable) [ ] Does the current PM task require a specialized tool or skill? (Yes, No, Unsure) [ ] Which components are inspected during this PM task? (Lubrication, Filters, Belts/Chains, Electrical Connections, Sensors, Hydraulic Lines, Other (specify in LONG_TEXT)) [ ] If 'Other' selected for components, please specify: [ ] Is the current inspection method adequate? (Yes, No, Unsure) [ ] Recommendations for improving the PM task: --- CONDITION MONITORING IMPLEMENTATION --- [ ] Identify Initial Equipment for Condition Monitoring (Critical Equipment with High Failure Rates, Equipment with High Downtime Impact, Equipment with Limited Accessibility, Equipment with Complex Systems) [ ] Select Condition Monitoring Technologies (Vibration Analysis, Infrared Thermography, Oil Analysis, Ultrasonic Testing, Motor Current Signature Analysis (MCSA), Pressure Monitoring, Temperature Monitoring) [ ] Initial Sensor Placement Count [ ] Target Implementation Date for Sensors [ ] Justification for Sensor Selection [ ] Data Collection Frequency (Continuous, Daily, Weekly, Monthly) [ ] Equipment Layout/Schematic [ ] Acceptable Threshold for Early Warning --- RESOURCE ALLOCATION & TRAINING --- [ ] Number of Maintenance Technicians Currently Assigned [ ] Average Maintenance Technician Skill Level (1-5, 1=Entry, 5=Expert) [ ] Current Allocation of Maintenance Technicians by Equipment Type (Machinery, Electrical, Pneumatics, Hydraulics, Utilities, Other (Specify)) [ ] Description of Current Training Programs for Maintenance Staff [ ] What areas of training are needed to improve efficiency and effectiveness? (PLC Programming, Hydraulic Systems, Electrical Troubleshooting, Predictive Maintenance Technologies, Root Cause Analysis, Other (Specify)) [ ] Date of Last Maintenance Staff Skills Assessment [ ] Budget Allocation for Maintenance Training (Annual) [ ] Notes on resource constraints impacting PM optimization (e.g., staffing shortages, budget limitations) --- DOCUMENTATION & REPORTING --- [ ] Summary of Optimization Changes [ ] Estimated Cost Savings (Annual) [ ] Reduction in Downtime (Hours/Year) [ ] Reporting Frequency (PM Optimization Review) (Monthly, Quarterly, Annually) [ ] Date of Last PM Program Review [ ] Supporting Data (e.g., Failure Analysis Reports) [ ] Key Performance Indicators (KPIs) Tracked [ ] Document Control Status (Draft, Approved, Revised) [ ] Document Version Number --- CONTINUOUS IMPROVEMENT & REVIEW --- [ ] Last Review Date [ ] Frequency of Review (in months) [ ] Summary of Review Findings [ ] Areas of PM Program needing further investigation/improvement (Task Frequency, Task Procedures, Spare Parts Management, Condition Monitoring Techniques, Training Requirements, Documentation Accuracy) [ ] Action Items Identified during Review [ ] Target Completion Date for Action Items [ ] Overall PM Program Health (Post-Review) (Excellent, Good, Fair, Needs Improvement) [ ] Reviewer Name [ ] Reviewer Signature --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/manufacturing/preventive-maintenance-optimization-checklist (Click "Install Template" to launch your digital inspection tool immediately)