RADIOLOGY EQUIPMENT MAINTENANCE CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- GENERAL ROOM ENVIRONMENT --- [ ] Room Temperature (°C) [ ] Room Humidity (%) [ ] Evidence of Water Leaks? (Yes, No, Unsure) [ ] Evidence of Pests? (Yes, No, Unsure) [ ] Notes on Room Condition (e.g., dust, cleanliness) [ ] Adequate Lighting? (Yes, No, Needs Adjustment) [ ] Last Cleaning Date --- X-RAY GENERATOR --- [ ] Generator Output Voltage (kVp) [ ] Generator Tube Current (mA) [ ] Exposure Time (mSec/s) [ ] Heat Sink Temperature (°C) [ ] Generator Cooling System Status (Operational, Warning - Reduced Efficiency, Fault - Requires Attention) [ ] Inverter Status (Normal, Warning, Error) [ ] Any unusual noises observed during operation? [ ] Date of Last High Voltage Cable Inspection --- X-RAY TUBE --- [ ] Tube Loading (mA-s) [ ] Tube Voltage (kV) [ ] Tube Current (mA) [ ] Tube Cooling Fan Operation (RPM) [ ] Tube Condition (Visual Inspection) (Excellent, Good, Fair, Poor - Requires Attention) [ ] Detailed Notes on Tube Condition (Burn Marks, Discoloration, etc.) [ ] Last Tube Replacement Date [ ] Arcing Observed? (Yes, No) --- HIGH VOLTAGE SYSTEM --- [ ] High Voltage Output Voltage (kV) [ ] Leakage Current (µA) [ ] Insulation Resistance (MΩ) [ ] High Voltage Cable Condition (Excellent, Good, Fair, Poor) [ ] Coolant Level (if applicable) (Normal, Low, Empty, N/A (Air Cooled)) [ ] Observations/Notes on High Voltage System [ ] Last HV Transformer Oil Analysis Date (if applicable) [ ] Upload HV System Test Report (if applicable) --- IMAGE RECEPTOR (DETECTOR) --- [ ] Pixel Value Histogram Peak (LU) [ ] Pixel Value Histogram Width (LU) [ ] Signal-to-Noise Ratio (SNR) [ ] Uniformity Ratio (%) [ ] Detector Type (CR, DR (Flat Panel), DR (Curved Panel), DR with AI) [ ] Any observed artifacts or issues? [ ] Last Calibration Date [ ] Image Receptor Test Results (e.g., MTF curves, linearity) --- COLLIMATION & LIGHT FIELD --- [ ] Light Field Alignment: Left-Right Deviation (mm) [ ] Light Field Alignment: Above-Below Deviation (mm) [ ] Light Field Source Condition (Excellent, Good, Fair, Poor, Needs Replacement) [ ] Collimator Operation: Smoothness of Movement (Smooth, Slightly Rough, Rough, Not Operational) [ ] Collimator Leaf Alignment (Aligned, Slightly Misaligned, Misaligned – Requires Adjustment, Damaged - Requires Repair/Replacement) [ ] Any Comments/Observations Regarding Collimation or Light Field? [ ] Date of Last Light Field Calibration --- PATIENT SUPPORT & TABLE --- [ ] Last Table Surface Cleaning [ ] Table Movement Speed (mm/s) [ ] Table Functionality - Up/Down (Functional, Requires Repair) [ ] Table Functionality - Tilt (Functional, Requires Repair) [ ] Patient Weight Capacity Verified? (Yes, No) [ ] Any observed damage to table surface (cracks, wear)? [ ] Table Locking Mechanism Functioning Properly? (Yes, No) [ ] Table Height at lowest setting (mm) [ ] Table Height at highest setting (mm) [ ] Technician Signature --- DOSE CALIBRATION & QUALITY ASSURANCE --- [ ] Last Calibration Date [ ] Measured kVp at Nominal mA [ ] Measured Exposure Time [ ] Deviation from Nominal kVp (%) [ ] Deviation from Nominal Exposure Time (%) [ ] Image Receptor (Detector) QA Result - Spatial Resolution (Pass, Marginal, Fail) [ ] Image Receptor (Detector) QA Result - Uniformity (Pass, Marginal, Fail) [ ] Comments/Observations regarding Dose Calibration & QA [ ] Phantom Image Upload (if applicable) --- SAFETY INTERLOCKS & SHIELDING --- [ ] Interlock System Test Status (Pass, Fail, Not Performed) [ ] Radiation Leakage Measurement (mSv) [ ] Shielding Integrity (Intact, Minor Damage, Significant Damage) [ ] Details of any Shielding Damage (if applicable) [ ] Last Shielding Inspection Date [ ] Interlock Tests Performed (Entrance/Exit Door Interlock, Table Position Interlock, Operator Screen Interlock, Emergency Stop Function) [ ] Notes on Interlock Functionality --- ELECTRICAL AND MECHANICAL SYSTEMS --- [ ] Voltage Input (VAC) [ ] Power Consumption (VA) [ ] Motor Speed (RPM) [ ] Grounding Connection Status (Secure, Loose, Corroded) [ ] Cooling Fan Operation (Normal, Noisy, Not Operating) [ ] Last Lubrication Date (Motors/Bearings) [ ] Detailed Observations/Comments (Electrical/Mechanical) [ ] Upload relevant documentation/photos --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/facility-management/radiology-equipment-maintenance-checklist (Click "Install Template" to launch your digital inspection tool immediately)