ROOF DECK PREPARATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PLANNING & PERMITS --- [ ] Project Address Verification (Verified, Not Verified) [ ] Detailed Description of Permitting Requirements [ ] Copy of Building Permit [ ] HOA Approval (if applicable) (Approved, Pending, Not Required, Denied) [ ] Permit Application Date [ ] Expected Permit Approval Date --- EXISTING ROOF ASSESSMENT --- [ ] Overall Roof Condition Description [ ] Roof Age (Years) [ ] Roof Material Type (Asphalt Shingles, Tile, Metal, Wood Shakes, Other) [ ] Observed Issues (Check all that apply) (Missing Shingles/Tiles, Leaks, Rot/Decay, Sagging, Damaged Flashing, Moss/Algae Growth, None) [ ] Existing Roof Load Capacity (lbs/sq ft) - *if available* [ ] Roof Photos (front, side, and detail views) --- STRUCTURAL REINFORCEMENT (IF NEEDED) --- [ ] Structural Engineer Consultation Required? (Yes, No) [ ] Engineer's Recommendations (if applicable) [ ] Additional Joist Spacing (inches) [ ] Joist Size Increase (inches) [ ] Reinforcement Methods Employed (select all that apply) (Sistering Joists, Adding Blocking, Joist Headers, Beam Reinforcement, Other - Specify Below) [ ] Description of 'Other' Reinforcement Method (if applicable) [ ] Structural Reinforcement Drawings/Calculations --- WATERPROOFING & MEMBRANE INSTALLATION --- [ ] Existing Roof Membrane Type (if applicable) (None, Modified Bitumen, TPO, EPDM, Other (Specify in Long Text)) [ ] Description of Existing Roof Condition (if applicable) [ ] Chosen Waterproofing Membrane Type (Modified Bitumen, TPO, EPDM, PVC, Liquid-Applied Membrane, Other (Specify in Long Text)) [ ] Membrane Manufacturer and Product Details [ ] Membrane Thickness (in mils) [ ] Seam Welding/Adhesion Method (Hot-Air Welding, Cold-Welding Adhesive, Self-Adhesive, Other (Specify in Long Text)) [ ] Membrane Installation Specifications (PDF/DOC) [ ] Details of Primer Application (Type, Coverage Rate) [ ] Seam Overlap (in inches) (6, 9, 12, Other (Specify in Long Text)) --- DECKING MATERIAL SELECTION & DELIVERY --- [ ] Decking Material Type (Pressure-Treated Wood, Cedar, Redwood, Composite Decking, Hardwood (Ipe, Mahogany, etc.)) [ ] Quantity of Decking Material (sq ft) [ ] Quantity of Fasteners (approx. #) [ ] Material Specifications (Grade, Dimensions, etc.) [ ] Scheduled Delivery Date [ ] Supplier Name [ ] Supplier Contact Person [ ] Delivery Location Details [ ] Material Certifications Required? (FSC Certified, ASTM Compliant, Other (Specify in Long Text)) --- DECK FRAMING & LAYOUT --- [ ] Joist Spacing (inches) [ ] Beam Size (inches x inches) [ ] Framing Material (Pressure Treated Lumber, Cedar, Composite, Other) [ ] Deck Height Above Existing Roof (inches) [ ] Framing Attachments (Check all that apply) (Ledger Board, Beam Hangers, Joist Ties, Direct Attachment) [ ] Notes on Framing Layout [ ] Ledger Board Attachment Method (Lag Screws, Bolts, Construction Adhesive, Other) --- DRAINAGE CONSIDERATIONS --- [ ] Desired Deck Slope (%) [ ] Drainage System Type (Scupper System, Channel Drainage, Perforated Decking, Grading to Existing Downspout, Other (Specify in LONG_TEXT)) [ ] If 'Other' Drainage System Selected, Please Describe: [ ] Number of Scuppers (if applicable) [ ] Channel Drainage Width (inches, if applicable) [ ] Materials for Drainage System: (PVC, Aluminum, Stainless Steel, Composite, Other (Specify in LONG_TEXT)) [ ] If 'Other' Drainage Material Selected, Please Describe: [ ] Connection to Existing Drainage (if applicable) (Direct Connection, Separate System, No Connection) --- SAFETY & FALL PROTECTION --- [ ] Personal Protective Equipment (PPE) - Confirm Presence & Condition (Hard Hats, Safety Glasses, Work Gloves, Safety Harnesses, Appropriate Footwear) [ ] Fall Protection System Inspection Frequency (in days) [ ] Type of Fall Protection System in Use (Guardrails, Safety Nets, Personal Fall Arrest Systems (PFAS), Combination) [ ] Fall Protection Plan Details - Briefly Describe [ ] Last Fall Protection Training Date [ ] Site Safety Briefing Completed? (Yes, No) [ ] Upload Site Safety Plan Document --- FINAL INSPECTION & CLEANUP --- [ ] Checklist: Deck Surface Condition (Level and Even, Free of Debris, Properly Drained, Securely Fastened Decking, No Visible Gaps or Cracks) [ ] Waterproofing System Integrity (Satisfactory, Needs Minor Adjustment, Requires Repair) [ ] Number of Nails/Screws Secured (Estimate) [ ] Notes on Adjustments/Repairs Made [ ] Date of Final Inspection [ ] Time of Final Inspection [ ] Inspector Signature [ ] Inspector Name (Printed) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/roof-deck-preparation-checklist (Click "Install Template" to launch your digital inspection tool immediately)