ROOFING MEMBRANE INSTALLATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-INSTALLATION & SITE PREPARATION --- [ ] Project Start Date [ ] Project Site Location [ ] Weather Conditions - Assessment (Clear, Partly Cloudy, Rain, Snow, Windy) [ ] Wind Speed (mph) [ ] Site Survey Notes [ ] Existing Roof Condition (New, Good, Fair, Poor) [ ] Site Photos (Pre-Installation) [ ] Permits and Approvals Verified? --- SUBSTRATE PREPARATION --- [ ] Substrate Type Verified? (Concrete, Wood Sheathing, Metal Deck, Other (Specify)) [ ] Describe Substrate Condition (Dryness, Cleanliness) [ ] Substrate Moisture Content (%) [ ] Substrate Contaminants Present? (None, Dust, Debris, Oil/Grease, Existing Coating, Other (Specify)) [ ] Details of Contaminant Remediation (if applicable) [ ] Surface Profile/Roughness Verified? (Yes, No) [ ] Surface Profile Reading (mil/microns) [ ] Notes on Substrate Preparation --- MEMBRANE MATERIAL HANDLING & STORAGE --- [ ] Ambient Temperature Upon Arrival (F) [ ] Relative Humidity Upon Arrival (%) [ ] Manufacturer's Storage Recommendations Followed? (Y/N) [ ] Description of Storage Area Condition (Cleanliness, Shelving, etc.) [ ] Storage Conditions Verified (Select all that apply) (Dry, Protected from Sunlight, Flat & Supported, Ventilated, Free from Obstructions) [ ] Membrane Orientation (Rolls Stored Vertically or Horizontally) (Vertically, Horizontally) [ ] Date Membrane Received [ ] Lot Number Verified and Recorded? [ ] Photo Documentation of Storage Conditions (Optional) --- MEMBRANE INSTALLATION - UNROLLING & POSITIONING --- [ ] Record Ambient and Substrate Temperature [ ] Wind Speed (mph) [ ] Membrane Orientation (Parallel/Perpendicular to Roof Slope) (Parallel, Perpendicular) [ ] Note any obstructions or challenges encountered during unrolling. [ ] Overlap Width (inches) - Verify per specification [ ] Membrane Roll Condition (New/Damaged) (New, Damaged) [ ] Describe any visible defects in membrane (e.g., wrinkles, tears). --- MEMBRANE INSTALLATION - SEAMING & ADHERING --- [ ] Seam Overlap (inches) [ ] Seam Width (inches) [ ] Seaming Method (Heat Welding, Cold Glue, Adhesive Bonding) [ ] Welding Temperature (°F) [ ] Welding Pressure (psi) [ ] Welding Speed (inches/minute) [ ] Seam Failure Indicators (Check all that apply) (Incomplete Weld, Delamination, Air Pockets, Burnt Membrane, Irregularity in Seam Width) [ ] Notes on Seam Quality (Describe any deviations or issues) [ ] Photograph of Representative Seam --- PENETRATION & DETAIL FLASHING --- [ ] Type of Penetration(s) Flashed? (Vents, Chimneys, Skylights, Pipes, Other (Specify in LONG_TEXT)) [ ] If 'Other' Penetration Type, specify: [ ] Flashing Material Used: (Metal (Specify gauge in NUMBER), Membrane Extension, PVC, EPDM, Other (Specify in LONG_TEXT)) [ ] Metal Flashing Gauge (if applicable): [ ] Describe detailing procedures around penetrations: [ ] Was sealant used around penetrations? (if applicable) (Yes, No) [ ] Sealant type and application details (if sealant used): [ ] Upload photos of penetration flashing details. [ ] Detailing adhered to manufacturer's specifications? (Yes, No, N/A) --- QUALITY CONTROL & INSPECTION --- [ ] Membrane Seam Overlap (inches) [ ] Welding Temperature (°F) [ ] Welding Pressure (PSI) [ ] Seam Weld Appearance (Uniform and Continuous, Slightly Discolored, Significant Discoloration/Voids) [ ] Substrate Conditions (Clean and Dry, Free of Debris, Proper Slope, Sound and Stable) [ ] Notes on Weld Quality (if any issues) [ ] Photos of Critical Seam Welds [ ] Overall Membrane Installation Quality (Excellent, Good, Fair, Poor) [ ] Date of Inspection --- POST-INSTALLATION & CLEANUP --- [ ] Detailed Description of Final Appearance & Condition [ ] Debris Removal Verification (Check all that apply) (Loose Membrane Scraps, Packaging Materials, Tools, Fasteners, All Debris Removed) [ ] Number of Debris Piles Removed [ ] Notes on any Areas Requiring Further Attention (if any) [ ] Date of Final Cleanup [ ] Time of Final Cleanup [ ] Contractor Signature (Confirmation of Completion) [ ] Overall Job Satisfaction (Contractor) (Excellent, Good, Fair, Poor) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/roofing-membrane-installation-checklist (Click "Install Template" to launch your digital inspection tool immediately)