STORMWATER MANAGEMENT INSTALLATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- PRE-CONSTRUCTION & SITE PREPARATION --- [ ] Permit Application Submission Date [ ] Permit Approval Date [ ] Stormwater Management Plan Approved? (Yes, No, Pending) [ ] Description of Existing Site Conditions (Pre-Construction) [ ] Pre-Construction Soil Testing Results (Infiltration Rate) [ ] Copy of Approved Stormwater Management Plan [ ] Preliminary Site Survey Completed? (Yes, No) [ ] Location of Monitoring Wells (if applicable) --- EROSION AND SEDIMENT CONTROL (ESC) --- [ ] Confirm SWPPP (Stormwater Pollution Prevention Plan) is on-site and current? (Yes, No, N/A) [ ] Which of the following ESC measures are currently in place? (Silt Fences, Hay Bales, Erosion Control Blankets, Sediment Traps, Construction Entrance, Stabilized Construction Access Road, Other - Specify in LONG_TEXT) [ ] If 'Other' selected above, please specify: [ ] Number of silt fences installed: [ ] Length of silt fence installed (feet): [ ] Silt fence condition: (Good, Fair, Poor, N/A) [ ] Attach photos of implemented ESC measures. --- SEDIMENT BASIN/TRAP INSTALLATION --- [ ] Basin/Trap Volume (CF) [ ] Inlet Elevation (NAVD88) [ ] Outlet Elevation (NAVD88) [ ] Liner Type (Geotextile Fabric, Clay Liner, Synthetic Liner (Specify), None (Excavated Earth)) [ ] Description of Liner Installation and Protection Measures [ ] Outlet Structure Type (Flared Outlet, Orifice, Trash Rack, Other (Specify)) [ ] Description of Outlet Structure Installation [ ] Photos of Basin/Trap Installation [ ] Date of Liner Installation --- DETENTION/RETENTION POND INSTALLATION --- [ ] Pond Depth (Maximum) [ ] Embankment Slope (Horizontal:Vertical) [ ] Liner Material (If Applicable) (None (Earth), Geotextile Fabric, Synthetic Liner (Specify Type)) [ ] Description of Liner Installation & Seam Integrity Testing (if applicable) [ ] Inlet Structure Elevation (relative to pond bottom) [ ] Outlet Structure Elevation (relative to pond bottom) [ ] Outlet Control Structure Type (Weir, Gate Valve, Orifice) [ ] Description of Erosion Protection Measures for Embankment (Riprap, Vegetation, etc.) [ ] Date of Initial Pond Grading [ ] Photographs of Pond Excavation and Embankment Construction --- SWALES AND VEGETATED CHANNELS --- [ ] Swale/Channel Bottom Width (ft) [ ] Swale/Channel Bottom Slope (%) [ ] Channel Side Slopes (H:V) [ ] Channel Lining Type (None (Natural Ground), Turf/Grass, Riprap, Geotextile Fabric, Other (Specify in Long Text)) [ ] If 'Other' Lining Type Selected, Please Specify: [ ] Vegetation Types Installed (Check all that apply) (Grasses, Ground Cover, Shrubs, Trees, Other (Specify in Long Text)) [ ] If 'Other' Vegetation Selected, Please Specify: [ ] Date of Initial Vegetation Establishment [ ] GPS Coordinates of Swale/Channel Outfall --- STORMWATER CONVEYANCE STRUCTURES (PIPES, INLETS, ETC.) --- [ ] Pipe Diameter (inches) [ ] Pipe Slope (percent) [ ] Pipe Material (PVC, CMP, HDPE, Concrete, Other (specify in LONG_TEXT)) [ ] If 'Other' pipe material selected, please specify: [ ] Pipe Bedding (Sand, Gravel, Compacted Fill, Other (specify in LONG_TEXT)) [ ] If 'Other' pipe bedding selected, please specify: [ ] Inlet Type (Curb Inlet, Catch Basin, Drop Inlet, Other (specify in LONG_TEXT)) [ ] If 'Other' inlet type selected, please specify: [ ] Attach Photo of Pipe Joint & Bedding [ ] Inspector Signature (Confirmation of Proper Installation) --- PERMEABLE PAVEMENT INSTALLATION --- [ ] Pavement Thickness (inches) [ ] Aggregate Base Compaction (%, Proctor) [ ] Pavement Type (Concrete Pavers, Asphalt, Gravel, Other (Specify)) [ ] Describe any deviations from the approved permeable pavement design. [ ] Underdrain System Components Installed (check all that apply) (Geotextile Fabric, Perforated Pipes, Aggregate Surrounding Pipes, Manholes/Inlets, Outlet Structure) [ ] Underdrain Outlet Elevation (feet) [ ] Upload Photos of Base Preparation [ ] Date of Initial Watering --- VEGETATION ESTABLISHMENT --- [ ] Date of Initial Planting [ ] Percent Ground Coverage (initial) [ ] Plant Species Present (verified) (Native Grasses, Shrubs, Trees, Ground Cover, Other (Specify in Long Text)) [ ] Details of 'Other' Plant Species (if selected above) [ ] Mulch Depth (inches) [ ] Mulch Type (Wood Chips, Straw, Compost, Other) [ ] Details of 'Other' Mulch Type (if selected above) [ ] Irrigation System Functioning (Yes/No) [ ] Next Vegetation Inspection Date --- AS-BUILT DOCUMENTATION & TRAINING --- [ ] Description of As-Built Documentation Provided [ ] As-Built Drawings - PDF Upload [ ] Maintenance Manuals - PDF Upload [ ] Number of Personnel Trained [ ] Brief Description of Training Topics Covered [ ] Date of Training Session [ ] Training Topics Covered (Select All That Apply) (System Operation, Routine Maintenance, Emergency Procedures, Inspection Reporting, Regulatory Requirements) [ ] Contractor Representative Signature [ ] Contractor Representative Printed Name --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/stormwater-management-installation-checklist (Click "Install Template" to launch your digital inspection tool immediately)