SUB-BASE PREPARATION CHECKLIST Created by ChecklistGuro (https://checklistguro.com) --- SITE CLEARANCE & EXCAVATION --- [ ] Existing Site Conditions Description [ ] Excavation Depth (meters) [ ] Excavation Depth Variance Allowed (meters) [ ] Obstructions Removed (Select all that apply) (Vegetation, Debris, Topsoil, Existing Utilities, Rocks/Boulders, Other) [ ] Details of Utility Location and Protection (if applicable) [ ] Site Clearance Photos (Before) [ ] Topsoil Stripping & Stockpiling - Method (Stockpiled on Site, Removed from Site, Reused on Site) --- GRADING & LEVELING --- [ ] Design Grade Elevation (m) [ ] Existing Ground Level (m) - Average [ ] Cut/Fill Depth (m) - Maximum [ ] Leveling Method Used (Laser Level, Transit Level, String Line, Other) [ ] Description of Leveling Procedure & Challenges Encountered [ ] Grade Variance (m) - Maximum Acceptable [ ] Surface Finish Required (Smooth, Rough, As per specification) [ ] GPS Coordinates of Leveling Points (Representative) --- GEOTEXTILE INSTALLATION (IF APPLICABLE) --- [ ] Geotextile Type Specified? (Yes, No) [ ] Geotextile Material Specification (e.g., Manufacturer, Grade) [ ] Geotextile Overlap Width (meters) [ ] Overlap Orientation (as per specification) (Longitudinal, Transverse, As Specified) [ ] Installation Method Used (e.g., Unrolled, Laid) [ ] Check for Damage/Defects (Tears, Punctures, Wrinkles, Contamination, None Observed) [ ] Upload Photograph of Geotextile Installation [ ] Area of Geotextile Installed (m²) --- SUB-BASE MATERIAL DELIVERY & STORAGE --- [ ] Material Type Confirmation (Crushed Stone, Recycled Aggregate, Other (Specify Below)) [ ] Specify Material Type (if 'Other') [ ] Delivery Quantity (in tons/cubic meters) [ ] Delivery Ticket/Receipt [ ] Material Condition Upon Delivery (Excellent, Good, Fair, Poor) [ ] Notes on Material Condition [ ] Storage Location [ ] Storage Protection Measures (Covered, Contained (e.g., Stockpile Berm), None) --- SUB-BASE MATERIAL PLACEMENT --- [ ] Sub-base Layer Thickness (inches) [ ] Area of Sub-base Installation (sq ft) [ ] Material Type Verification (Correct Material Specified, Material Substitution Required - Documented, Incorrect Material - Immediate Correction Needed) [ ] Notes on Material Placement (e.g., specific issues, adjustments made) [ ] Material Spread Consistency (Consistent Spread, Minor Variations, Significant Variations - Corrective Action Required) [ ] Photo Evidence of Material Placement [ ] Material Volume Placed (cu yd) [ ] Date of Material Placement --- SUB-BASE COMPACTION --- [ ] Initial Compaction Test Result (Density) [ ] Target Compaction Density (%) [ ] Number of Passes with Compaction Equipment [ ] Compaction Equipment Type (Plate Compactor, Roller (Smooth Drum), Roller (Padded), Vibratory Roller, Other) [ ] Notes on Compaction Process (e.g., moisture control, problem areas) [ ] Moisture Content (%) at Time of Compaction [ ] Did compaction achieve target density? (Yes, No) [ ] Attach Compaction Test Reports [ ] Compaction Supervisor Signature --- QUALITY CONTROL & TESTING --- [ ] Moisture Content (%) [ ] Compaction Test Result (density ratio) [ ] Particle Size Distribution - % Passing 75µm (Sieve) [ ] Material Type Verified? (Yes, No) [ ] Grading Certificate Received? (Yes, No) [ ] Testing Date [ ] Comments/Observations [ ] Attach Test Report (PDF) --- FINAL INSPECTION & SIGN-OFF --- [ ] Final Compaction Test Results (Proctor) [ ] Final Level Variation (Maximum allowed) [ ] Material Type Verified as per Specification? (Yes, No) [ ] Any Observed Issues or Deviations? [ ] Inspection Date [ ] Inspection Time [ ] Inspector Signature [ ] Sub-base preparation meets project requirements? (Yes, No) --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/sub-base-preparation-checklist (Click "Install Template" to launch your digital inspection tool immediately)