SUBCONTRACTOR DAILY PROGRESS REPORTING CHECKLIST 2026 Created by ChecklistGuro (https://checklistguro.com) --- PROJECT & PERSONNEL INFORMATION --- [ ] Report Date [ ] Project Name/ID [ ] Site Location/Zone [ ] Subcontractor Company Name [ ] Site Supervisor Name [ ] Weather Condition (Sunny, Cloudy, Rain, Snow, High Winds) [ ] Current Temperature (°C/°F) [ ] Supervisor Signature --- WORKFORCE & LABOR TRACKING --- [ ] Reporting Date [ ] Subcontractor Name [ ] Total Number of Workers on Site [ ] Trades Present on Site (Electrical, Plumbing, Masonry, Carpentry, HVAC, Concrete, Demolition) [ ] Total Man-Hours Worked [ ] Description of Labor Distribution [ ] Foreman/Supervisor Signature --- WORK PERFORMED & MILESTONE TRACKING --- [ ] Work Date [ ] Work Performed Summary [ ] Detailed Task Breakdown [ ] Percentage of Task Completion [ ] Work Status (Ahead of Schedule, On Schedule, Behind Schedule) [ ] Completed Milestones (Foundation Completed, Framing Finished, Rough-in Inspection Passed, Enclosure Achieved) [ ] Progress Photos/Evidence --- EQUIPMENT & MACHINERY UTILIZATION --- [ ] Equipment Inspection Date [ ] Equipment Type in Use (Excavator, Skid Steer, Crane, Forklift, Generator, Compactor, Other) [ ] Equipment ID/Asset Number [ ] Operational Status (Fully Operational, Needs Maintenance, Out of Service/Broken) [ ] Engine Hours/Meter Reading [ ] Maintenance Notes or Issues Identified [ ] Equipment Inspection Photos --- MATERIAL DELIVERY & INVENTORY STATUS --- [ ] Delivery Date [ ] Delivery Note/BOL Number [ ] Material Description [ ] Quantity Received [ ] Delivery Status (Complete, Partial Delivery, Damaged/Rejected) [ ] Storage Location (On-Site Warehouse, Laydown Area, Direct to Installation Point, External Storage) [ ] Upload Delivery Ticket/Packing Slip [ ] Discrepancy or Damage Notes --- SITE SAFETY & INCIDENT REPORTING --- [ ] Incident Date [ ] Time of Incident [ ] Incident Type (Injury/Illness, Property/Equipment Damage, Near Miss, Environmental/Spill, No Incident to Report) [ ] Incident Description [ ] Safety Measures Followed (PPE Worn Correctly, Toolbox Talk Conducted, Area Secured, Permit to Work Valid) [ ] Photos of Incident or Site Condition [ ] Safety Officer Signature --- SITE CONSTRAINTS & DELAYS --- [ ] Primary Delay Category (Weather/Inclement Weather, Material Shortage, Equipment Breakdown, Labor/Personnel Shortage, Subcontractor/Trade Conflict, Permit or Regulatory Delay, Other) [ ] Description of Delay Impact [ ] Estimated Hours Lost [ ] Date Delay Occurred [ ] Supporting Evidence (Photos/Weather Reports) --- QUALITY CONTROL & INSPECTION RESULTS --- [ ] Inspection Date [ ] Inspection Status (Passed, Passed with Comments, Failed - Requires Rework) [ ] Defects Identified (Structural Discrepancy, Material Damage, Dimensional Error, Workmanship Issue, None) [ ] Detailed Defect Description [ ] Photo Evidence of Inspection [ ] Quality Inspector Signature --- INTER-TRADE COORDINATION & DEPENDENCIES --- [ ] Active Trades Requiring Coordination (Electrical, Plumbing, HVAC, Masonry, Carpentry, Concrete, Drywall) [ ] Dependency Conflicts & Constraints [ ] Impact on Project Schedule (No Impact, Minor Delay, Critical Path Delay) [ ] Next Required Coordination Date [ ] Subcontractor Lead Verification --- PHOTOS & SUPPORTING DOCUMENTATION --- [ ] Photo Timestamp Date [ ] Progress Photos (Before/During/After) [ ] Scanned Delivery Tickets & Material Receipts [ ] Photo Descriptions & Contextual Notes [ ] Document Types Attached (Delivery Ticket, Inspection Report, Safety Permit, Subcontractor Daily Log) [ ] Photographer/Documenter Verification --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/subcontractor-daily-progress-reporting-checklist-2026 (Click "Install Template" to launch your digital inspection tool immediately)