SYSTEM FUNCTIONAL TESTING CHECKLIST (MEP SYSTEMS) Created by ChecklistGuro (https://checklistguro.com) --- HVAC SYSTEMS - GENERAL --- [ ] Ambient Temperature (during testing) [ ] Supply Air Temperature (measured) [ ] Return Air Temperature (measured) [ ] System Operating Mode (Heating/Cooling/Auto) (Heating, Cooling, Auto) [ ] Fan Speed (Low/Med/High) (Low, Medium, High) [ ] Observations/Comments (during testing) [ ] Date of Testing [ ] Time of Testing --- HVAC SYSTEMS - AIR DISTRIBUTION --- [ ] AHU Supply Air Temperature Setpoint (Verification) [ ] AHU Return Air Temperature Differential (Verification) [ ] Damper Operation - Verify opening/closing sequence (Pass, Fail, Not Applicable) [ ] Verify Diffuser Airflow Direction Control (Horizontal, Vertical, Adjustable) [ ] Describe any observed noise issues with air distribution equipment. [ ] Static Pressure Verification (Supply Air) (Within Tolerance, Outside Tolerance, Not Measured) [ ] Date of Air Distribution System Functional Test --- HVAC SYSTEMS - HEATING & COOLING EQUIPMENT --- [ ] Chiller Entering Water Temperature (EWT) - Measured Value (°F) [ ] Chiller Leaving Water Temperature (LWT) - Measured Value (°F) [ ] Boiler Steam Pressure (PSI) [ ] Furnace Hot Surface Temperature (°F) [ ] Chiller Operation Mode (Cooling, Heating, Standby) [ ] Boiler Sequencing - Correct Sequence? (Yes, No, N/A) [ ] Describe any anomalies observed during testing of heating/cooling equipment. [ ] Date of Equipment Performance Test [ ] Time of Equipment Performance Test --- PLUMBING SYSTEMS - DOMESTIC WATER --- [ ] Static Water Pressure (PSI) [ ] Flow Rate at Fixture (GPM) [ ] Water Temperature (Hot - °F) [ ] Water Temperature (Cold - °F) [ ] Hot Water Temperature Setpoint Verified? (Yes, No, N/A) [ ] Pressure Reducing Valve (PRV) Functioning Correctly? (Yes, No, N/A) [ ] Observations/Comments (e.g., unusual noises, leaks) [ ] Date of Test [ ] Time of Test --- PLUMBING SYSTEMS - SANITARY & STORM DRAINAGE --- [ ] Storm Drain Pipe Slope (minimum) [ ] Drainage Pipe Diameter (verify against design) [ ] Cleanout Accessibility (Accessible, Obstructed, N/A) [ ] Venting Type (verify design) (Wet Vent, Dry Vent, Individual Vent, Grouped Vent) [ ] Observations Regarding Slope/Grade [ ] Leak Test Performed? (Yes, No, N/A) [ ] Water Test Pressure (psi) [ ] Date of Leak Test --- PLUMBING SYSTEMS - FIRE SUPPRESSION --- [ ] Sprinkler System Static Water Pressure (PSI) [ ] Sprinkler System Flow Test (GPM) [ ] Sprinkler Head Coverage (Adequate?) (Yes, No, Not Applicable) [ ] Fire Pump Operation (Manual & Automatic) (Pass, Fail, N/A) [ ] Last Fire Suppression System Inspection Date [ ] Describe any observed deficiencies during fire suppression system testing [ ] Backflow Preventer Testing Passed? (Yes, No, N/A) [ ] Upload Fire Suppression System Test Report [ ] Fire Pump Discharge Pressure (PSI) --- ELECTRICAL SYSTEMS - POWER DISTRIBUTION --- [ ] Main Incoming Voltage (V) [ ] Main Incoming Current (A) [ ] Panel Voltage (V) [ ] Panel Current Capacity (A) [ ] Panel Grounding Method (Solid Ground, Resistance Ground, Impedance Ground) [ ] Observations during visual inspection of panels (e.g., labeling, cleanliness) [ ] Phase Rotation Verification Result (Correct, Incorrect, Not Applicable) [ ] Date of Last Panel Inspection [ ] Which Overcurrent Protection Devices Tested? (Circuit Breakers, Fuses, Electronic Fuses) --- ELECTRICAL SYSTEMS - LIGHTING --- [ ] Luminaire Level Check: Average Footcandle Reading (Lux) [ ] Luminaire Level Check: Minimum Footcandle Reading (Lux) [ ] Emergency Lighting Activation Test: Successful? (Yes, No, Not Applicable) [ ] Photocell Operation: Correct Function? (Yes, No, Not Applicable) [ ] Dimming System Functions Checked (Full On, 50% Dim, 25% Dim, Off, Scene 1, Scene 10) [ ] Lighting Control System Notes (e.g., programming issues) [ ] Exterior Lighting Operation (Daylight) (Operating as Designed, Not Operating, Needs Adjustment) [ ] Date of Lighting Survey Performed [ ] Lighting Survey Photos/Reports --- ELECTRICAL SYSTEMS - LOW VOLTAGE SYSTEMS --- [ ] Fire Alarm System - Smoke Detector Functionality (Operational, Needs Adjustment, Defective) [ ] Access Control System - Card Reader Functionality (Zone 1) (Operational, Needs Adjustment, Defective) [ ] Security Camera - Frame Rate (FPS) [ ] Description of any observed anomalies in the CCTV system [ ] Communication System - Verified Functionality (Select all that apply) (Intercom, PA System, Data Network, Telephone System) [ ] Last Scheduled Maintenance for Fire Alarm Panel [ ] Location of Primary Access Control Panel --- BUILDING AUTOMATION SYSTEM (BAS) INTEGRATION --- [ ] BAS Server Communication Latency (ms) [ ] BAS Integration with HVAC System - Status (Successful, Partial, Failed) [ ] BAS Integration with Plumbing System - Status (Successful, Partial, Failed) [ ] BAS Integration with Electrical System - Status (Successful, Partial, Failed) [ ] BAS Points Verified (Select all that apply) (Temperature Sensors, Humidity Sensors, Flow Meters, Pump Status, Valve Positions, Equipment Status) [ ] Last BAS Software Version Update [ ] Description of any BAS Integration Issues Encountered [ ] BAS Configuration File (Optional) --- COMMISSIONING & PERFORMANCE VERIFICATION --- [ ] Chilled Water Supply Temperature (Actual) [ ] Chilled Water Return Temperature (Actual) [ ] Supply Air Volume (CFM) - AHU-1 [ ] Return Air Static Pressure (inches WC) [ ] Lighting Control System Operation (Dimming, Scheduling) (Nominal, Above Nominal, Below Nominal, Non-Functional) [ ] Domestic Hot Water Temperature Setpoint Achieved? (Yes, No) [ ] Comments on Performance Verification [ ] Date of Performance Testing [ ] Time of Performance Testing Start --- SAFETY & EMERGENCY SYSTEMS --- [ ] Emergency Generator Fuel Level (Gallons) [ ] Emergency Lighting Status (Operational, Malfunctioning, Not Tested) [ ] Last Fire Drill Date [ ] Emergency Generator Start Time (Simulated) [ ] Smoke Detector Testing Status (Passed, Failed, Not Tested) [ ] Observations during Emergency Generator Test [ ] Fire Suppression System Valve Status (Open, Closed, Not Tested) [ ] Location of Emergency Power Switchgear --- END OF TEMPLATE --- Transform this text into a digital, automated, and trackable mobile app! Visit: https://checklistguro.com/templates/construction/system-functional-testing-checklist-mep-systems (Click "Install Template" to launch your digital inspection tool immediately)